
$599,900
Listed by: Rennie & Associates Realty Ltd. · MLS®
This smartly designed 1-bedroom + flex home maximizes space with an open-concept layout and a massive private patio. The interior boasts 9' ceilings, floor-to-ceiling windows, engineered hardwood, and A/C. The sleek kitchen is equipped with a dining island and full-size 30" integrated Bosch and Fulgor Milano appliances, complemented by a full-size LG washer/dryer. Plus, you'll get exclusive access to SkyHaven Ortus' premier 4,000 sq.ft. rooftop terrace, perfect for socializing or unwinding against a backdrop of panoramic views. Sales Centre open Sat/Sun from 12-5pm or by appointment.
MLS® #
R3165975
Status
Active
Type
Residential
Sub-type
Apartment/Condo
Ownership
Freehold Strata
Bedrooms
1
Full Baths
1
Half Baths
0
Fireplaces
0
Living Area
640 sqft
Main Floor
640 sqft
Stories
6
Year Built
2025
Age
1 years
Structure
Multi Family, Residential Attached
Parking Stalls
1
Heating
Heat Pump
Cooling / A/C
Central Air · Air Conditioning
Appliances
Washer/Dryer · Dishwasher · Refrigerator · Stove · Microwave · Oven
Laundry
In Unit
Security
Smoke Detector(s) · Fire Sprinkler System
Windows
Window Coverings
Interior Features
Elevator
Exterior Features
Balcony
Pets
Cats OK, Dogs OK, Number Limit (Two), Yes With Restrictions
Lot Features
Central Location, Lane Access, Recreation Nearby
Community
Shopping Nearby
Building Amenities
Bike Room · Trash · Hot Water · Management · Snow Removal
Coordinates: 49.209981, -123.129794 · Map data © Google
Parking Type
Garage Under Building, Lane Access, Garage Door Opener
Strata Fee
$437.96/mo
MLS® Area
Marpole
City
Vancouver
Postal Code
V6P 0L9
Subdivision
Ortus
3 bd · 2 ba · 922 sqft
MLS® R3141863 · Rennie & Associates Realty Ltd.
$989,900

$1,190,000
Marpole
MLS® R3166028 · Listed by HonestDoor Inc.
Source: City of Vancouver Open Data
Certified Professional Program - New Building - To construct a non-combustible 6-storey, multi-dwelling building consisting of 54 dwelling units with 3 levels of underground parking with residential storage. VBBL 2019 - NFPA 13 Stage 1 - Excavation and Shoring issued on Dec. 7, 2021. Stage 2 - Foundation to Grade issued on June 15, 2022. Stage 3 - Full Construction issued on Dec. 19, 2022. (changes to construction and number of dwelling units from 65 to 54.) Revision #1 - (April 3, 2023) - To change the number of dwelling units from 65 to 54 on the project description. Revision #2 - (July 24, 2025) - A change in Mech/Plumb Engineer from Geoffrey Chiu (outgoing on Mar. 15, 2025) to Lai Xue (incoming on Mar. 15, 2025).
$11,000,000
Jun 15, 2022
BP-2020-02488