$1,297,000
Listed by: Easy List Realty · MLS®
Priced to Sell!!!! The Butterfly, a striking architectural landmark by Bing Thom Architects located in the West End. This thoughtfully designed 2 bed, 1 full bath offers over 1,000 sq. ft. of airy, light-filled living space w/ floor-to-ceiling curved glass walls. Sleek Italian kitchen features Miele appliances with a spa-inspired bathroom. Residents enjoy access to world-class amenities inc. a 50-metre lap pool, sauna, gym, resident lounge, 24-hour concierge, & BMW car share. With secure parking, storage, smart home systems, & a prime location just steps from English Bay, Robson St. and the city's best dining, the home offers a rare blend of elegance, innovation and lifestyle.
MLS® #
R3167845
Status
Active
Type
Residential
Sub-type
Apartment/Condo
Ownership
Freehold Strata
Bedrooms
2
Full Baths
1
Half Baths
0
Fireplaces
0
Living Area
1,086 sqft
Main Floor
1,086 sqft
Year Built
2024
Age
2 years
Structure
Multi Family, Residential Attached
Parking Stalls
1
Parking Type
Underground
Strata Fee
$822/mo
Taxes
$4,985.35/yr
MLS® Area
West End VW
City
Vancouver
Postal Code
V6E 0E5
Heating
Geothermal
Cooling / A/C
Central Air · Air Conditioning
Appliances
Washer · Dryer · Dishwasher · Refrigerator · Stove · Microwave
Laundry
In Unit
Pets
Cats OK, Dogs OK, Number Limit (Two), Yes With Restrictions
Lot Features
Central Location
Accessibility
Wheelchair Access
Pool
Indoor
Building Amenities
Exercise Centre · Heat · Water
Coordinates: 49.281983, -123.126806 · Map data © Google
2 bd · 2 ba · 1,366 sqft
MLS® R3118398 · Dracco Pacific Realty
$3,998,000
Source: City of Vancouver Open Data
Certified Professional Program - New Building - To construct a 58-storey building with 331 market units; a 5-storey podium with new church program space and Daycare, an 8-storey social housing building with 61 units all over 9 levels of an underground parkade. To restore and renovate the exiting First Baptist Church. STAGED CONSTRUCTION (SHELL PERMIT) Stage I (Excavation/Shoring and complete Structure) issued December 4, 2018. Stage II (full building permit for new construction. Existing church building excluded from this permit) issued April 29, 2020. Stage III: to allow salvage and abatement of hazardous materials of the existing church issued May 11, 2021. Stage III, Revision 1: to add demolition and replacement of footings to the scope of stage III. Demolition and abatement work to be conducted in accordance with Commitment Letter dated June 17, 2021. Stage IV to restore and renovate the existing church (issued Dec. 3, 21). Revision 2: To include architectural details in the approved Stage 4 BP drawings. Change of architect of record and CRP: Venelin Kokalov replaced Shinobu Homma as of December 21, 2020. Revision 3: Revision to FD response point Revision #4 per the approved DPMA DP-2023-00115 (issued Aug/14/2024) Revision #5: Two 3-bedroom units combined into one 5-bedroom unit on L55. Glass door between pool lobby & change room corridor deleted.
Multiple Dwelling
$300,000,000
Dec 3, 2021
BP-2018-00309