$1,399,900
Listed by: Framework Marketing Inc. · MLS®
MOVE IN TODAY. Elegant, beautiful and charming, SAVANNAH brings contemporary Georgian architecture to this established Georgian Inspired Vancouver neighborhood. Modern finishes and thoughtful details make Savannah a pleasure to be hold. A mix of multi-level townhomes and garden flats are adorned with unique colours, window treatments, porches and doorways that allow for each home to have its own distinct personality, while still working together as one. This 3 bedroom home offers spacious living dining area and top of the line appliances. Located across Winona Park and steps to Marin Gateway Sky Train Station. This home includes one parking stall. Savannah is now complete and move in ready. OPEN HOUSE EVERY SATURDAY & SUNDAY 2-4. By appointment rest of the week.
MLS® #
R3170957
Status
Active
Type
Residential
Sub-type
Townhouse
Ownership
Freehold Strata
Bedrooms
3
Full Baths
2
Half Baths
1
Living Area
1,294 sqft
Main Floor
447 sqft
Year Built
2026
Structure
Residential Attached
Parking Stalls
1
Parking Type
Garage Under Building, Lane Access
Strata Fee
$460.86/mo
MLS® Area
Marpole
City
Vancouver
Postal Code
V5X 2Y4
Subdivision
Savannah
Heating
Forced Air
Laundry
In Unit
Interior Features
Elevator
Exterior Features
Balcony
Pets
Yes With Restrictions
Building Amenities
Other
Coordinates: 49.214375, -123.115775 · Map data © Google
Watch this home
Get an email when the price changes, it sells, or a new unit lists in this building. Sign in or create a free account.
Strata fee / sqft (median)
$0.36/mo
49% below area median
Year built
2026
Listings on record
2
2 active now
Rules
Pets: Yes With Restrictions
Sale prices, sale-to-list ratio and time to sell for this building are available to registered users. Create a free account
Based on MLS® listings at this address and active strata listings in the area. Keyword flags come from public listing remarks and aren’t a substitute for strata minutes, the depreciation report or a Form B.
Transit-Oriented Area — Tier 3
~520 m from Marine Drive SkyTrain station
Provincial law requires the city to allow at least 3.0 FAR and 8 storeys for residential here — well above typical single-family zoning. Potential land-assembly interest from developers.
~520 m straight-line to Marine Drive SkyTrain
Screening estimate from provincial regulations (TOA station points, B.C. Reg. 263/2023 & 265/2023; small-scale multi-unit housing rules). Distances are straight-line; actual TOA maps are set by municipal bylaw and some parcels (heritage, ALR, exempt areas) are excluded. Confirm with the municipality before relying on it.
Not in the Agricultural Land Reserve.
The listing’s flood plain disclosure is available to registered users. Create a free account
ALR from the Agricultural Land Commission via DataBC (point check at the listing’s mapped location). Flood plain is the listing brokerage’s disclosure. Confirm both with the municipality and your lawyer.
Source: City of Vancouver Open Data
Certified Professional Program - New Building - Building 1 (Facing the Lane / West) - To construct a stack townhouse multiple dwelling buildings, containing 13 dwelling units. Refer to BP-2022-02435 for site work, below grade facilities and common underground parking. VBBL2019 - NFPA 13R Stage Construction.
Multiple Dwelling
$0
Jul 17, 2024
BP-2022-04782
Certified Professional Program - New Building - To construct three, 4-storey stacked townhouse multiple dwelling buildings, containing thirty-six (36) dwelling units, all over one level of underground parking, providing a total of 42 parking spaces with vehicular access from the lane. - VBBL2019 - NFPA 13R residential / 13 for parkade. - Radio Antenna is required at the Parkade level. Building 1 - BP-2022-04782 Building 2 - BP-2022-04861 Building 3 - BP-2022-04862 Stage 1 - Excavation and Shoring issued on Sept. 29, 2023. Stage 2 - Foundation to Grade and including the level covering the garage ramp (which is above grade) as part of the non-comb construction work issued on January 22, 2024. Stage 3 - Full Construction issued on July 11, 2024. (Stg 3 also includes a change in Mech/plumbing Engineer from Min Gao (Outing on May 3, 2024) to Geoffrey Chiu (Incoming on May 4, 2024).
Multiple Dwelling
$12,500,000
Sep 29, 2023
BP-2022-02435