$530,000
Listed by: RE/MAX Crest Realty · MLS®
Welcome to Paradigm by Wesgroup! This stylish 1-bedroom plus den, 1-bathroom home is ideally located in the popular River District, steps from dining, banking, recreation and the Riverfront walkway. The modern kitchen features quartz countertops and premium KitchenAid stainless steel appliances, including a gas range, built-in oven and dishwasher. A high-efficiency heat pump provides year--round heating and cooling. Amenities include a gym, yoga/TRX room, WorkHub booths, table tennis, media and social lounges, rooftop terrace with BBQ, bike storage and repair station, dog-wash station, and daytime concierge. Includes 1 parking stall and 1 full-size locker.
MLS® #
R3160091
Status
Active
Type
Residential
Sub-type
Apartment/Condo
Ownership
Freehold Strata
Bedrooms
1
Full Baths
1
Half Baths
0
Living Area
547 sqft
Main Floor
547 sqft
Year Built
2023
Age
3 years
Structure
Multi Family, Residential Attached
Parking Stalls
1
Parking Type
Garage Under Building, Guest
Strata Fee
$550.39/mo
Heating
Heat Pump
Appliances
Washer/Dryer · Dishwasher · Refrigerator · Stove
Laundry
In Unit
Exterior Features
Balcony
Pets
Cats OK, Dogs OK, Yes With Restrictions
Lot Features
Central Location
Community
Shopping Nearby
Building Amenities
Bike Room · Clubhouse · Exercise Centre · Recreation Facilities · Concierge · Caretaker · Maintenance Grounds · Gas · Hot Water · Management
Coordinates: 49.204588, -123.032791 · Map data © Google
Taxes
$1,809.8/yr
MLS® Area
South Marine
City
Vancouver
Postal Code
V5S 0G7
2 bd · 2 ba · 877 sqft
MLS® R3147552 · Axford Real Estate
$749,000
$745,000
South Marine
MLS® R3159930 · Listed by Oakwyn Realty Ltd.
Source: City of Vancouver Open Data
Certified Professional Program - New Building - This is permit has been issued for site work, below grade facilities and four levels common underground parking for the proposed development To construct a residential development consisting of three buildings: Building 1 - 23 storey tower with 6 level podium -258 units Building 2 - 2 storey -7 townhouse units Building 3 - 2 storey -3 townhouse units all over four levels of underground parking accessible from Oolichan Way. Note: Total number of market dwelling units is 268. Note: Permanent dewatering is provided by secant pile walls installed along entire perimeter of this site. On the south -west side secant pile wall is shared by both properties 8690 Jack Uppal St. (related to BP-2018-04844) and 3430 E Kent Ave South. 10-Jan-2020 - Stage 1 (to place the secant piles) issued. 09-Apr-2020 - Stage 2 (excavation and shoring) issued. 03-Sep-2020 - Stage 3 (full construction) issued - COVID19. 11-Jun-2020 - Revision#1 - COVID19. Changes to secant pile design . Effective May 8, 2020 M. Janes, P. Eng. assumed responsibilities for Sch B -Geotechnical - items 7.1 to 7.4. 27-Oct -2020 -Revision#2 Revised drawings from the incoming geotechnical engineer (temporary) prepared by Isherwood for Excavation and Shoring only. 7-Jan- 2022 - Revision#3 Changes to L22 and L23 to provide internal stair access to new private roof decks for Suites 2201 and 2203 as approved under DPMA - DP-2021-00518. A/M/E Revision Summary Letters and DP Compliance Letter on file. 10-Nov-2023 - Revision#4 To Add an Energy Transfer Station including Heat Exchanger, distribution - piping between ETS and the district energy service distribution, control valves, instrumentation and metering. 6-Sep-2023 - Revision#5 Changes to BP A/M/E/CC drawings following changes approved under a DPMA. Refer to Memos with changes by RPR of A/M/E/CC disciplines.
Multiple Dwelling · Parking Garage
$80,000,000
Apr 9, 2020
BP-2019-01108
Certified Professional Program - New Building - To construct a new 23 storey residential tower with six (6) level podium on the North/West side of this site containing 258 market residential units ( Building 1). Note: For full scope of work for entire development refer to BP-2019-01108 (Site Permit). 10-Jan-2020 - Stage 1 (to place the secant piles) issued. 09-Apr-2020 - Stage 2 (Excavation and Shoring) issued. 03-Sep-2020 - Stage 3 (Full Construction) issued. 7-Jan- 2022 - Revision#3 Changes to L22 and L23 to provide internal stair access to new private roof decks for Suites 2201 and 2203, as approved under DPMA - DP-2021-00518. 6-Sep-2023 - Revision#5 Refer to BP-2019-01108
Multiple Dwelling · Parking Garage
$0
Jan 10, 2020
BP-2019-01893