




Subject: $999,900 · $853/sqft
$999,900
Likely needs work. Get contractor quotes before making an offer — renovation costs can exceed expectations.
Incredible value! Spacious 2-bed, 2-bath FREEHOLD condo in Newport Quay - one of False Creek’s most desirable concrete buildings. In original condition and full of amazing potential, ready for your renovation ideas. Features a large open layout and a 150 sq ft balcony with beautiful city and mountain views. Enjoy a worry-free building with numerous upgrades, including recent elevator modernizations. Steps to the Seawall, SkyTrain, Granville Island, Olympic Village, and Downtown. Proactive strata with on-site caretaker. Includes 1 parking, 1 storage, guest parking, and EV charging stations. Unit will be vacant as of Dec 1. Rentals allowed, no pets. Call to book your private showing or visit the OPEN HOUSE on Saturday, Nov 22 from 1-3 PM.
MLS #
R3053415
Status
Canceled
Type
Residential
Sub-type
Apartment/Condo
Ownership
Freehold Strata
Zoning
RES
Bedrooms
2
Full Baths
2
Half Baths
0
Kitchens
1
Living Area
1,172 sqft
Main Floor
1,172 sqft
Stories
11
Year Built
1986
Age
39 years
Roof
Other
Construction
Concrete, Mixed (Exterior)
Structure
Multi Family, Residential Attached
Parking Stalls
1
Parking Type
Underground
Original Price
$999,900
Strata Fee
$565.87/mo
Taxes
$3,302.26/yr
Listed
2025-09-29
MLS Area
False Creek
City
Vancouver
Postal Code
V5Z 4G3
Subdivision
Newport Quay
Heating
Baseboard · Hot Water
Flooring
Mixed · Carpet
Appliances
Washer/Dryer · Dishwasher · Refrigerator · Stove
Laundry
In Unit
Patio / Porch
Patio · Deck
Windows
Window Coverings
Interior Features
Elevator · Storage
Exterior Features
Balcony
Total Units
158
Rentals Allowed
100
Rental Limit
%
Pets
No Cats, No Dogs, No
Restrictions
Pets Not Allowed,Rentals Allowed
Strata Mgmt Co.
Wynford Management
Transit
Close
Schools
Close
View
CITY, MOUNTAIN
Lot Features
Central Location, Recreation Nearby
Water Source
Public
Sewer
Public Sewer, Sanitary Sewer
Utilities
Electricity Connected, Water Connected
Community
Shopping Nearby
Building Amenities
Bike Room · Caretaker · Trash · Maintenance Grounds · Hot Water · Management
Property Disclosure
Yes
Coordinates: 49.267885, -123.116732 · Map data © Google
$1,299,000
Listed by RE/MAX Crest Realty
Source: City of Vancouver Open Data
Direct to Inspections - Addition / Alteration - #1103 Interior alterations to provide improvements to a dwelling unit #1103 on the 11th floor of this existing multiple dwelling building on this site Project scope: updates in bedroom, kitchen, bathroom and laundry room OK for DTI per S. Shin March 13, 2026
Multiple Dwelling
$90,000
Apr 8, 2026
BP-2026-00854
Direct to Inspections - Addition / Alteration - Interior alterations to provide residential improvement to an existing dwelling unit at #402 - 518 Moberly Road on the fourth floor of this existing multiple dwelling building on the site. Okay for DTI per A. Best January 27, 2026
Multiple Dwelling
$50,000
Feb 4, 2026
BP-2026-00320
Direct to Inspections - Addition / Alteration - Interior alterations only to renovate the existing dwelling unit #906 on the 9th floor of the existing multiple dwelling building on this site.
Multiple Dwelling
$60,000
Sep 15, 2025
BP-2025-03951
Direct to Inspections - Addition / Alteration - #709 Interior alterations to provide residential improvements to unit 709 on the 7th floor of the existing multiple dwelling building on this site. Work to include alterations to the kitchen and bathroom. OK for DTI per D. Langevin, September 8, 2025
Multiple Dwelling
$20,000
Sep 9, 2025
BP-2025-03981
Enquiry Centre - Addition / Alteration - Interior alterations to for fire alarm system system upgrade Category #1 per Bulletin 2018-004-BU/EL in this existing Multiple Dwelling Building on this site. Related EP-2024-05849 Revision #1 - Electrical work related to modernization items include lights, outlet and disconnect - Adding ground for the building, modifying the fire alarm for the recall functions - Schedule B Architectural & EL submitted per Stephane F. Jacob, P.Eng, 604-435-5750, sjacob@pvengineering.com - Increase construction cost of 19,000.00
Multiple Dwelling
$114,995
Sep 17, 2024
BP-2024-01398
Field Review - Addition / Alteration - #909 - 9th Floor Interior alterations only to provide upgrades to the existing Suite at this existing residential dwelling unit on the 9th Floor (#909) at this existing multiple dwelling building. Scope of Work: remove/construct interior partition walls, doors, millwork, finishes, lighting and electrical work. Energy upgrade: E2 - Lighting - Install lighting dimmer, timers, and/or motion detectors on interior lights\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.\t Okay for field review as per K. Kang Nov. 1, 2021
Multiple Dwelling
$200,000
Dec 17, 2021
BP-2021-05696
Field Review - Addition / Alteration - Interior alterations to renovate this dwelling unit #316 on the 3rd floor of this existing multiple dwelling building on this site. Scope of work to enclose den, and related electrical and plumbing work. OK for field review as per Jamie Zhang, Dec. 3/20 Notes: 1. Energy Upgrade trigger: L2 - Lighting - Install lighting dimmer, timers, and/or motion detectors on interior lights 2. Building inspector to determine on site if a separate sprinkler permit is required.
Multiple Dwelling
$7,552
Jan 14, 2021
BP-2020-03830
Field Review - Addition / Alteration - #513 - 5th floor Interior alterations to provide improvements to unit #513 on the fifth floor of this existing multiple dwelling on the site. Scope of Work is to remove and reconfigure interior walls, kitchen & bathroom upgrades and plumbing & electrical work. Revision #1 - to provide the exact 3'-3" dimension for the precise location of the entrance closet/Kitchen wall, and to revise the existing bifold doors to sliding doors at the closets to the Master Bedroom, and to change the window at the Bedroom to sliding doors to the existing Solarium, and to change the swing door at the Living Room to sliding doors to the existing Solarium. Schedule B (Structural) may be required by District Building Inspector to be determined on site. OK for Field Review as per S.Yu on March 5, 2020 Notes: 1. Schedule B (Structural) may be required by District Building Inspector to be determined on site. 2. No sprinkler inspection or permit required. 3. Energy Upgrade: L2 - Lighting - Install energy efficient lighting fixtures (single occupied space area)
Multiple Dwelling
$100,000
Mar 19, 2020
BP-2020-00866
Field Review - Addition / Alteration - #512 - 5th floor Interior alterations to provide tenant improvements to dwelling unit #512 on the fifth floor of this existing multiple dwelling. Scope of work to Include: Removal of a non-Load bearing wall in the kitchen area to create an island with beam above, new lighting to be hung from beam. OK For Field Review as per A.Campbell & K.Vogt - Dec.11.2018 Energy Upgrade Selected: L2 - Lighting - Install lighting dimmer, timers, and/or motion detectors on interior lights
Multiple Dwelling
$5,000
Jan 14, 2019
BP-2018-06429
Field Review - Addition / Alteration - #1010 - 10th floor Interior alterations to provide improvements to unit #1010 on the tenth floor of this existing multiple dwelling. Scope of Work: - remove interior walls at kitchen to dining room - remove electrical sockets in the walls - relocate light switches OK for field review as per Eun Jeon, November 6, 2018 Note: 1. This is not sprinklered building. Energy Upgrade Selected: L2 - Lighting - Install lighting dimmer, timers, and/or motion detectors on interior lights
Multiple Dwelling
$5,000
Nov 19, 2018
BP-2018-05797
Field Review - Addition / Alteration - #616 Interior alterations to unit #616 in this existing multiple dwelling to provide improvements for new owner. Scope of work: demo and install non-load bearing walls in living room & kitchen, relocate kitchen, update bathroom, install doors, painting, and flooring. Schedule B Structural submitted per Arash Jamalirad, 604-401-0253 Energy Upgrade: L2 - Appliances - Upgrade to an Energuide/Energy Star appliance (fridge; dishwasher)
Multiple Dwelling
$30,000
Nov 14, 2018
BP-2018-05471
Field Review - Addition / Alteration - #611 Interior alterations to renovate kitchen and bathrooms at dwelling unit #611 on the 6th floor of this existing multiple dwelling building on this site. OK for field review per W.Wong, May 8, 2018. Note: Energy trigger chosen; L2 - Appliances - Upgrade to an Energuide/Energy Star appliance (fridge; dishwasher)
Multiple Dwelling
$75,000
Jun 27, 2018
BP-2018-02503
Field Review - Addition / Alteration - #217 Interior alterations to provide improvements to unit #217 on the 2nd floor of this existing Multiple Dwelling building on this site. OK for field review as per Jamie Zhang, July 26, 2017 Energy Upgrade: Install lighting dimmer, timers, and/or motion detectors on interior lights.
Multiple Dwelling
$60,000
Aug 25, 2017
BP-2017-03920
Field Review - Addition / Alteration - #712 Interior alterations to remove a portion of a non-loadbearing wall between kitchen and living room and to provide renovations to kitchen and bathrooms and throughout this existing dwelling unit (#712) on the 7th floor of this existing multiple dwelling building on this site. OK for field review per N. Bahr, Jan 3rd, 2017 Energy Upgrade: Install lighting dimmer, timers, and/or motion detectors on interior lights
Multiple Dwelling
$48,000
Jan 24, 2017
BP-2017-00003