




$469,900
Listed by: Framework Marketing Inc. · MLS®
Move in Ready Grafia by Porte Homes is located on a quiet residential street just steps from Commercial Drive, transit and schools. Designed by award winning interior designer BYU and Integra Architecture. The development is a 6 story wood-frame building and amenities such as a social lounge, fitness center, dog wash station, rooftop terrace, garden plots and more. This south facing studio home features full size stainless steel appliances with gas stove. Laminate flooring throughout. Show Home is open on Saturday & Sunday from 2 - 5.
MLS® #
R3161124
Status
Active
Type
Residential
Sub-type
Apartment/Condo
Ownership
Freehold Strata
Bedrooms
0
Full Baths
1
Half Baths
0
Living Area
484 sqft
Main Floor
484 sqft
Year Built
2025
Age
1 years
Structure
Multi Family, Residential Attached
Parking Stalls
0
Parking Type
None
Strata Fee
$264.04/mo
MLS® Area
Grandview Woodland
City
Vancouver
Postal Code
V5N 0K1
Subdivision
Grafia
Heating
Electric
Laundry
In Unit
Interior Features
Elevator
Exterior Features
Garden · Playground · Balcony
Pets
Yes With Restrictions
Building Amenities
Bike Room · Exercise Centre · Recreation Facilities · Trash · Maintenance Grounds · Gas · Hot Water · Management · Sewer · Water
Coordinates: 49.262915, -123.057919 · Map data © Google
0 bd · 1 ba · 490 sqft
MLS® R3158048 · RE/MAX Crest Realty
$519,000
MLS® R3160869 · Listed by Vancouver Luxury Realty
Source: City of Vancouver Open Data
Certified Professional Program - New Building - To develop a new six-storey, mixed-use combustible building with a retail unit (Group E shell) at 2325 E Broadway, and 122 strata dwelling units on storeys one through six all over two levels of underground parking having vehicular access from the rear lane. NOTE: The building is demised by a firewall into 2 separate buildings. The firewall runs from the 3.2.1.2. parkade slab, terminating at a parapet at the Level 4 roof deck. The portions of Level 5 and 6 above the firewall are setback from the firewall. 29-Sept-2022 - Stage 1 (excavation and shoring) issued. 11-May-2023 - Stage 2 ( foundation to grade, struct. only) issued. 10-May-2023 - Revision#1 issued Changes to Excavation and shoring drawings as per letter by Kevin Bodnar, P. Eng, dated 23-Feb-2023 22-Sept-2023 - Stage 3 (full construction) issued. Note: Stage 3 was issued to facilitate continuation of construction work on site. Completion of deficiency deficiency list was deferred a future application for revision to ST3. No drawings have been processed. 25-Oct-2023 - Revision#2 issued. Revision to Stage 3 New DP Compliance letter submitted. BP ST3 Drawings were processed. 22-Apr-2025 - Revision#3 issued. Changes to A/S/M/E/CCD as outlined in Change letters by RPR responsible for A/S/M/E/CCD disciplines.
Multiple Dwelling · Parking Garage · Not Applicable
$37,751,107
Sep 22, 2023
BP-2022-00448