




$519,000
Listed by: RE/MAX Crest Realty · MLS®
MLS® #
R3158048
Status
Active
Type
Residential
Sub-type
Apartment/Condo
Style
Bachelor/Studio
Ownership
Freehold Strata
Bedrooms
0
Full Baths
1
Half Baths
0
Living Area
490 sqft
Main Floor
490 sqft
Year Built
2025
Age
1 years
Structure
Multi Family, Residential Attached
Parking Stalls
0
Parking Type
None
Heating
Electric
Appliances
Washer/Dryer · Dishwasher · Refrigerator · Stove · Microwave
Laundry
In Unit
Security
Smoke Detector(s)
Interior Features
Elevator
Exterior Features
Garden · Playground · Balcony
Pets
Yes With Restrictions
Lot Features
Central Location, Recreation Nearby
Community
Shopping Nearby
Building Amenities
Bike Room · Exercise Centre · Recreation Facilities · Trash · Maintenance Grounds · Gas · Hot Water · Management · Sewer · Water
Coordinates: 49.262915, -123.057890 · Map data © Google
Strata Fee
$264.04/mo
Taxes
$1,957.82/yr
MLS® Area
Grandview Woodland
City
Vancouver
Postal Code
V5N 0K1
2 bd · 2 ba · 940 sqft
MLS® R3122005 · Bellevue Realty Group
$1,199,000

$2,048,000
Grandview Woodland
MLS® R3155878 · Listed by Oakwyn Realty Ltd.
Source: City of Vancouver Open Data
Certified Professional Program - New Building - To develop a new six-storey, mixed-use combustible building with a retail unit (Group E shell) at 2325 E Broadway, and 122 strata dwelling units on storeys one through six all over two levels of underground parking having vehicular access from the rear lane. NOTE: The building is demised by a firewall into 2 separate buildings. The firewall runs from the 3.2.1.2. parkade slab, terminating at a parapet at the Level 4 roof deck. The portions of Level 5 and 6 above the firewall are setback from the firewall. 29-Sept-2022 - Stage 1 (excavation and shoring) issued. 11-May-2023 - Stage 2 ( foundation to grade, struct. only) issued. 10-May-2023 - Revision#1 issued Changes to Excavation and shoring drawings as per letter by Kevin Bodnar, P. Eng, dated 23-Feb-2023 22-Sept-2023 - Stage 3 (full construction) issued. Note: Stage 3 was issued to facilitate continuation of construction work on site. Completion of deficiency deficiency list was deferred a future application for revision to ST3. No drawings have been processed. 25-Oct-2023 - Revision#2 issued. Revision to Stage 3 New DP Compliance letter submitted. BP ST3 Drawings were processed. 22-Apr-2025 - Revision#3 issued. Changes to A/S/M/E/CCD as outlined in Change letters by RPR responsible for A/S/M/E/CCD disciplines.
Multiple Dwelling · Parking Garage · Not Applicable
$37,751,107
Sep 22, 2023
BP-2022-00448