$749,900
Listed by: RE/MAX Crest Realty · MLS®
Rarely available 1 Bedroom + Den + Solarium at Domus in the heart of Yaletown. This 790 sq. ft. home offers 133 sq. ft. of private outdoor living across a 92 sq. ft. patio and a covered balcony. Extensively updated in 2026 with new engineered hardwood flooring throughout, all new appliances, refinished cabinetry, and a full repaint. The well-designed layout offers a separate dining room, a bright solarium, and a versatile den ideal as a home office. Residents enjoy an exercise centre, sauna and steam room, guest suite, and in-suite laundry. Unbeatable Yaletown location just steps to the Seawall, Canada Line, and an array of shops and restaurants. 1 parking & 1 locker included. A must see!
MLS® #
R3160968
Status
Active
Type
Residential
Sub-type
Apartment/Condo
Ownership
Freehold Strata
Bedrooms
1
Full Baths
1
Half Baths
0
Living Area
790 sqft
Main Floor
790 sqft
Year Built
2003
Age
23 years
Structure
Multi Family, Residential Attached
Parking Stalls
1
Parking Type
Underground
Strata Fee
$728.79/mo
Taxes
$2,459.05/yr
MLS® Area
Yaletown
City
Vancouver
Postal Code
V6B 1G3
Heating
Electric
Appliances
Washer/Dryer · Dishwasher · Refrigerator · Stove
Laundry
In Unit
Interior Features
Elevator · Guest Suite · Storage
Exterior Features
Balcony
Pets
Cats OK, Dogs OK, Yes With Restrictions
Lot Features
Central Location, Marina Nearby, Recreation Nearby
Community
Shopping Nearby
Building Amenities
Exercise Centre · Sauna/Steam Room · Caretaker · Trash · Maintenance Grounds · Hot Water · Management · Recreation Facilities · Snow Removal
Coordinates: 49.276908, -123.121094 · Map data © Google
2 bd · 2 ba · 906 sqft
MLS® R3110783 · Royal Pacific Realty Corp.
$999,000
Source: City of Vancouver Open Data
Direct to Inspections - Addition / Alteration - #Unit 502 – 1055 Homer St Interior alterations to provide residential improvements to unit 502 on the 5th Floor of this residential building on this site. Scope of work includes renovations to bath. Okay for DTI as per Ankur.H 15 Jan 2026
Dwelling Unit
$4,900
Jan 20, 2026
BP-2026-00195
Direct to Inspections - Addition / Alteration - Interior alterations to provide residential improvements to unit 300 located on the 3rd level in this existing multiple dwelling on this site. Scope of work limited to relocation of door to master bedroom and entry to master WIC and removal of wall at 2nd bedroom. DBI to determine on site if structural engineer required for removal of interior partition walls. Ok for DTI as per J. Kuhleitner March 4, 2025
Multiple Dwelling
$20,000
Mar 5, 2025
BP-2025-01017
Direct to Inspections - Addition / Alteration - Unit 310 Interior alterations to renovate this unit #310 on the 3rd floor of hits existing Multiple Dwelling building on this site. OK for DTI as per Jamie Z
Multiple Dwelling
$75,000
Aug 23, 2024
BP-2024-03191
Field Review - Addition / Alteration - Exterior alterations to replace windows and doors and repair membrane at penthouse level (28th floor) of existing strata building on this site. Scope of work to include replacing existing windows and swing doors and components, replacing existing roof planters, replacing membrane at mechanical room, removing decommissioned HVAC chimneys and capping parts of roof. Ok for field review per S. Jordan 12 March 2024 Sch A/B/D - Alfredo Jo P.Eng - 604-520-6456 (ext 109)
Apartment
$687,000
Apr 26, 2024
DB-2024-00901
Field Review - Addition / Alteration - #2403 Interior alterations to provide improvements to this dwelling unit #2403 on the 24th floor of this multiple dwelling building on this site. Work to remove the den/solarium. OK for BP per S. Dugaro OK for Field Review per W. Wong September 15, 2022 Notes: 1. Energy upgrade triggers: E2 - Lighting - Install energy efficient lighting fixtures (single occupied space area)
Multiple Dwelling
$146,500
Nov 1, 2022
BP-2022-04412
Field Review - Addition / Alteration - #2602 - 26th floor Interior alterations to provide improvement in (unit #2602) 26th , 27th and roof floor of this existing multiple dwelling building on this site. Scope of work includes: Changing plumbing fixtures, replacing flooring, New led retro fit lights ,switches and receptacles, New cabinets except reface kitchen, New sprinkler heads, Complete bathroom Renovations, New paint throughout , Gas fire pit on patio. OK for field review per S. Cowdell (DBI), March 10, 2022. E2 - HVAC - Install programmable thermostats with nighttime setback and switch for heating system
Multiple Dwelling
$200,000
Apr 21, 2022
BP-2022-01300
Field Review - Addition / Alteration - Lobbies - Ground & Upper Floors Interior alterations to install maglocks in the lobby on the ground floor and in the lobby on the second floor of this existing multiple dwelling building on this site. OK for field review per W.Wong, March 1, 2017. Architectural Schedule B submitted by G.I. CRUDU, 604.553.4984 Exempt from ASHRAE compliance submission and Energy Upgrade
Multiple Dwelling
$4,000
Apr 4, 2017
BP-2017-01116