$1,390,000
Listed by: Engel & Volkers Vancouver · MLS®
Positioned within one of Yaletown's most sought-after addresses, this high-floor corner residence at Domus is one of only six homes with this premium plan. Floor-to-ceiling windows with S, W & E exposures frame sweeping views of False Creek, the marina, Yaletown & the city skyline. Spanning 1,197 sf, the thoughtful layout offers generous living spaces, complete bedroom separation, a flex room & a covered view balcony. Updated with dark oak hardwood floors, custom millwork & an inspiring kitchen with a large island, gas cooktop, premium appliances & Lutron lighting. The primary suite features a marble-clad ensuite with a steam shower, soaker tub & walk-in wardrobe. 2 parking stalls, storage locker & premium amenities. Steps to Yaletown's superb restaurants, cafes, boutiques & the Seawall.
MLS® #
R3150345
Status
Active
Type
Residential
Sub-type
Apartment/Condo
Ownership
Freehold Strata
Bedrooms
2
Full Baths
2
Half Baths
0
Living Area
1,197 sqft
Main Floor
1,197 sqft
Year Built
2003
Age
23 years
Structure
Multi Family, Residential Attached
Parking Stalls
2
Parking Type
Garage Under Building, Underground
Strata Fee
$1,093.18/mo
Taxes
$4,396.76/yr
MLS® Area
Yaletown
City
Vancouver
Postal Code
V6B 1G3
Subdivision
Domus
Heating
Baseboard · Electric
Appliances
Washer/Dryer · Dishwasher · Refrigerator · Stove · Microwave · Oven · Range Top
Laundry
In Unit
Windows
Window Coverings
Interior Features
Elevator · Guest Suite · Pantry
Exterior Features
Balcony
Pets
Cats OK, Dogs OK, Number Limit (Two), Yes With Restrictions
View
False Creek and Cityscape
Building Amenities
Exercise Centre · Sauna/Steam Room · Trash · Management · Recreation Facilities · Water
Coordinates: 49.276890, -123.121222 · Map data © Google
2 bd · 3 ba · 1,966 sqft
MLS® R3130206 · Oakwyn Realty Ltd.
$3,650,000
Source: City of Vancouver Open Data
Direct to Inspections - Addition / Alteration - #Unit 502 – 1055 Homer St Interior alterations to provide residential improvements to unit 502 on the 5th Floor of this residential building on this site. Scope of work includes renovations to bath. Okay for DTI as per Ankur.H 15 Jan 2026
Dwelling Unit
$4,900
Jan 20, 2026
BP-2026-00195
Direct to Inspections - Addition / Alteration - Interior alterations to provide residential improvements to unit 300 located on the 3rd level in this existing multiple dwelling on this site. Scope of work limited to relocation of door to master bedroom and entry to master WIC and removal of wall at 2nd bedroom. DBI to determine on site if structural engineer required for removal of interior partition walls. Ok for DTI as per J. Kuhleitner March 4, 2025
Multiple Dwelling
$20,000
Mar 5, 2025
BP-2025-01017
Direct to Inspections - Addition / Alteration - Unit 310 Interior alterations to renovate this unit #310 on the 3rd floor of hits existing Multiple Dwelling building on this site. OK for DTI as per Jamie Z
Multiple Dwelling
$75,000
Aug 23, 2024
BP-2024-03191
Field Review - Addition / Alteration - Exterior alterations to replace windows and doors and repair membrane at penthouse level (28th floor) of existing strata building on this site. Scope of work to include replacing existing windows and swing doors and components, replacing existing roof planters, replacing membrane at mechanical room, removing decommissioned HVAC chimneys and capping parts of roof. Ok for field review per S. Jordan 12 March 2024 Sch A/B/D - Alfredo Jo P.Eng - 604-520-6456 (ext 109)
Apartment
$687,000
Apr 26, 2024
DB-2024-00901
Field Review - Addition / Alteration - #2403 Interior alterations to provide improvements to this dwelling unit #2403 on the 24th floor of this multiple dwelling building on this site. Work to remove the den/solarium. OK for BP per S. Dugaro OK for Field Review per W. Wong September 15, 2022 Notes: 1. Energy upgrade triggers: E2 - Lighting - Install energy efficient lighting fixtures (single occupied space area)
Multiple Dwelling
$146,500
Nov 1, 2022
BP-2022-04412
Field Review - Addition / Alteration - #2602 - 26th floor Interior alterations to provide improvement in (unit #2602) 26th , 27th and roof floor of this existing multiple dwelling building on this site. Scope of work includes: Changing plumbing fixtures, replacing flooring, New led retro fit lights ,switches and receptacles, New cabinets except reface kitchen, New sprinkler heads, Complete bathroom Renovations, New paint throughout , Gas fire pit on patio. OK for field review per S. Cowdell (DBI), March 10, 2022. E2 - HVAC - Install programmable thermostats with nighttime setback and switch for heating system
Multiple Dwelling
$200,000
Apr 21, 2022
BP-2022-01300
Field Review - Addition / Alteration - Lobbies - Ground & Upper Floors Interior alterations to install maglocks in the lobby on the ground floor and in the lobby on the second floor of this existing multiple dwelling building on this site. OK for field review per W.Wong, March 1, 2017. Architectural Schedule B submitted by G.I. CRUDU, 604.553.4984 Exempt from ASHRAE compliance submission and Energy Upgrade
Multiple Dwelling
$4,000
Apr 4, 2017
BP-2017-01116