




Subject: $419,000 · $963/sqft
$419,000
$419,000
Current Price
$450,000
Listed At · Oct 15, 2025
The best little 1 bedroom unit you've ever seen! Fully renovated and located in the heart of East Vancouver. Steps from trendy Commercial Drive with seamless access to downtown, it’s the perfect starter condo or investment. The move-in-ready space features a modern, open-concept layout and fresh finishes create a bright and welcoming vibe. Book your appointment today!
MLS #
R3059098
Status
Canceled
Type
Residential
Sub-type
Apartment/Condo
Ownership
Freehold Strata
Zoning
RM-4
Bedrooms
1
Full Baths
1
Half Baths
0
Kitchens
1
Fireplaces
0
Living Area
435 sqft
Main Floor
435 sqft
Stories
3
Year Built
1976
Age
50 years
Roof
Other
Construction
Frame Wood, Mixed (Exterior)
Structure
Multi Family, Residential Attached
Parking Stalls
1
Parking Type
Garage Under Building
Original Price
$450,000
Strata Fee
$362.74/mo
Taxes
$1,284.4/yr
Listed
2025-10-15
MLS Area
Grandview Woodland
City
Vancouver
Postal Code
V5N 1C8
Subdivision
Talishan Woods
Heating
Baseboard · Electric
Flooring
Mixed
Appliances
Dishwasher · Refrigerator · Stove · Freezer
Laundry
Common Area
Interior Features
Elevator
Exterior Features
Balcony
Total Units
48
Pets
Cats OK, Dogs OK, Yes With Restrictions
Restrictions
Pets Allowed w/Rest.,Rentals Allowed
Strata Mgmt Co.
Dwell Management
Strata Mgmt Phone
604-821-2999
Lot Features
Central Location, Recreation Nearby
Water Source
Public
Utilities
Community, Electricity Connected, Water Connected
Community
Shopping Nearby
Building Amenities
Trash · Management
Property Disclosure
Yes
Coordinates: 49.269052, -123.072703 · Map data © Google
Listed by Coldwell Banker Prestige Realty
Source: City of Vancouver Open Data
Field Review - Addition / Alteration - #114 - 1545 E 2nd Ave Interior alterations to remove a portion of a non-load bearing wall in the kitchen of this existing multiple dwelling building on the site. OK for Field Review as per S.Yu on May 23, 2023
Multiple Dwelling
$500
Jun 2, 2023
BP-2023-01777
Field Review - Addition / Alteration - #203 - 2nd floor Interior alterations to provide improvements for this existing dwelling on the 2nd floor (#202) in this multiple dwelling building on this site. Scope of work: remove 3 partition walls, remove/replace kitchen cabinets, appliances, remove/replace tub, toilet, sink, vanity finishes, lighting, electrical and plumbing work. OK for Field Review per K. Vogt February 24, 2022 E2 - Appliances - Upgrade to an Energuide/Energy Star appliance (fridge; dishwasher) Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Multiple Dwelling
$19,800
Apr 1, 2022
BP-2022-00981
Field Review - Addition / Alteration - Unit 102- 1st Floor Interior alterations to existing bathroom in this dwelling unit (Unit 102) in this existing multiple dwelling building on this site. Scope of Work: remove existing bathtub and replace with a walk-in shower, all in the existing bathroom in unit #102.
Dwelling Unit
$10,000
Jan 21, 2022
BP-2021-06373
Field Review - Addition / Alteration - Exterior alterations to this existing 3-storey Multiple Dwelling building to add 7 canopies over balconies on the 3rd storey (#302,#303,#304 - south elevation / #309,#310,#311,#312 - north elevation) and replace all windows, doors and balcony sliding glass doors on the 1st, 2nd and 3rd storey. Scope of work includes: replacing cedar trim and flashing OK for Field Review per I. Batt, Mar 06/2020. Notes: - Exterior alterations ok per POD H. Ghasemi - OK for DB. - No FSR addition (canopies), per K. Vogt. Energy Upgrade: Voluntary Upgrade - No Additional Upgrades Required. Schedule B Architectural and Schedule D Building Envelope submitted by Michael Grummett, P. Eng., Tel: 604 873-1181.
Multiple Dwelling
$480,000
May 27, 2020
DB-2020-00902
Field Review - Addition / Alteration - #303 Interior alterations to provide improvements for this existing dwelling unit #303 on the 3rd floor of this multiple dwelling building on this site. Scope of work: remove closet and extend kitchen, update kitchen & bathroom, new appliances and HWT, new tile in bathroom & foyer, removal partition wall between kitchen and living room. OK for field review per W.Wong, July 11, 2019 QP is Adrian Lee with EPoch Environmental Consulting Ltd. Notes: 1. Building is non sprinklered 2. Energy trigger chosen; L2 - Appliances - UPgrade to an Energuide/Energy Star appliance (fridge; dishwasher)
Multiple Dwelling
$65,000
Aug 7, 2019
BP-2019-03064