




Subject: $1,180,000 · $1,320/sqft
$1,180,000
Welcome to Vancouver House by Bjarke Ingels x Westbank. This stunning 2 Bedroom corner home boasts two expansive balconies with sweeping water and mountain views. The generous open-concept living space opens to the outdoor living area, and is ideal for entertaining. Features top of the line Miele appliances, brushed oak European wide hardwood, soft close Inform Italian kitchens, limestone bathroom flooring & wall tiles & heating/cooling. 24-hour concierge, state of the art gym & fitness, & large all year round heated outdoor pool. Just 5-7 min from Yaletown skytrain and 1 min from the seawall walkway. One parking and one storage locker included.
MLS #
R3048947
Status
Expired
Type
Residential
Sub-type
Apartment/Condo
Ownership
Freehold Strata
Zoning
CD-1
Bedrooms
2
Full Baths
2
Half Baths
0
Kitchens
1
Living Area
894 sqft
Main Floor
894 sqft
Year Built
2020
Age
6 years
Roof
Other
Construction
Concrete Frame, Concrete (Exterior), Glass (Exterior)
Structure
Multi Family, Residential Attached
Parking Stalls
1
Parking Type
Underground
Original Price
$1,180,000
Strata Fee
$1,134.03/mo
Taxes
$3,821.28/yr
Listed
2025-09-15
MLS Area
Yaletown
City
Vancouver
Postal Code
V6Z 0G5
Subdivision
Vancouver House
Heating
Heat Pump
Cooling / A/C
Central Air
Laundry
In Unit
Patio / Porch
Patio · Deck
Interior Features
Elevator
Exterior Features
Balcony
Total Units
375
Pets
Yes With Restrictions
Restrictions
Pets Allowed w/Rest.,Rentals Allwd w/Restrctns
Strata Mgmt Co.
AWM Alliance
View
Water and Mountains
Water Source
Community
Sewer
Sanitary Sewer, Septic Tank
Utilities
Community, Electricity Connected, Natural Gas Connected, Water Connected
Pool
Outdoor Pool
Building Amenities
Bike Room · Exercise Centre · Recreation Facilities · Concierge · Caretaker · Trash · Maintenance Grounds · Hot Water · Management
Property Disclosure
Yes
Coordinates: 49.274909, -123.131019 · Map data © Google
2 bd · 1 ba · 777 sqft
$857,808
Sold $832,000
Mar 2026
Listed by Coldwell Banker Prestige Realty
Source: City of Vancouver Open Data
Direct to Inspections - Addition / Alteration - 5301 - 1480 Howe St Interior alterations to provide residential improvements to 5301 on the 53rd floor of this existing mixed use building on this site. Scope of work includes: Converting of 3 Bedroom to 1 bedroom unit, renovation of Kitchen and Bathrooms. Okay for DTI as per A. Hadkar, November 10, 2025
Multiple Dwelling
$400,000
Nov 20, 2025
BP-2025-04717
Field Review - Addition / Alteration - #2706 To alter the interior of this existing suite (UNIT#2706) to perform water damage repairs in this existing commercial/residential building. Letter of assurance submitted by Scott Gordon 604-220-8272, reg. Architect, Architectural Schedule B Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No Sprinkler permit required per District Building Inspector. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Nov 29, 2021
BP-2021-04775
Field Review - Addition / Alteration - #2906 To alter the interior of this existing suite on the 29th floor (suite #2906) to perform water damage repairs in the this existing commercial/residential building. letter of assurance submitted by: Scott Gordon, 604-220-8272, reg. Arch, Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No Sprinkler permit required per District Building Inspector. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Oct 22, 2021
BP-2021-04760
Field Review - Addition / Alteration - #2709 To alter the interior of this existing suite on the 27th floor (suite #2709) to perform water damage repairs in this existing commercial/residential building. letter of assurance submitted by: Scott Gordon, 604-220-8272, Reg.Architect, Architectural Schedule B Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No Sprinkler permit required per District Building Inspector. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Oct 21, 2021
BP-2021-04786
Field Review - Addition / Alteration - #2908 Interior alterations to this existing suite on the 29th floor (suite#2908) to perform water damage repairs in this existing commercial/residential building. letter of assurance submitted by: Scott Gordon, 604-220-8272, reg. Arch, Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No sprinkler permit required per DBI. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Oct 12, 2021
BP-2021-04766
Field Review - Addition / Alteration - #1108 To alter the interior of this existing suite (1108) to perform water damage repairs in this existing commercial/residential building. letter of assurance submitted by: Scott Gordon, 604-220-8272, Reg.Architect, Architectural Schedule B Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No sprinkler permit required per DBI. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Oct 12, 2021
BP-2021-04773
Field Review - Addition / Alteration - #2508 To alter the interior of this existing suite on the 25th floor (suite #2508) to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No sprinkler permit required Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 27, 2021
BP-2021-03867
Field Review - Addition / Alteration - #2907 To alter the interior of this existing suite on the 29th floor (suite #2907) to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No sprinkler permit required Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 27, 2021
BP-2021-03869
Field Review - Addition / Alteration - #1608 To alter the interior of this existing suite on the 16th floor (suite #1608) to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. A Sprinkler permit may be required, as determined by the District Building Inspector. No sprinkler permit required per DBI. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 27, 2021
BP-2021-03866
Field Review - Addition / Alteration - #2010 To alter the interior of this existing suite on the 20th floor (suite #2010) to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No sprinkler permit required Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 23, 2021
BP-2021-03878
Field Review - Addition / Alteration - #1708 To alter the interior of this existing suite on the 17th floor (suite #1708) to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. A Sprinkler permit may be required, as determined by the District Building Inspector. No sprinkler permit required as per DBI. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 23, 2021
BP-2021-03865
Field Review - Addition / Alteration - #2009 To alter the interior of this existing suite on the 20th floor (suite #2009) to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. A Sprinkler permit may be required, as determined by the District Building Inspector. No sprinkler permit required as per DBI. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 23, 2021
BP-2021-03874
Field Review - Addition / Alteration - #2806 To alter the interior of this existing suite on the 28th floor (suite #2806) to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No sprinkler permit required Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 3, 2021
BP-2021-03876
Field Review - Addition / Alteration - #2809 To alter the interior of this existing suite on the 28th floor (suite #2809) to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No sprinkler permit required Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 3, 2021
BP-2021-03852
Field Review - Addition / Alteration - #2910 To alter the interior of this existing suite on the 29th floor to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No sprinkler permit required Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 3, 2021
BP-2021-03851
Field Review - Addition / Alteration - #1508 To alter the interior of this existing suite on the 15th floor (suite #1508) to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No sprinkler permit required Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 3, 2021
BP-2021-03873
Field Review - Addition / Alteration - #2909 To alter the interior of this existing suite on the 29th floor to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No sprinkler permit required Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 3, 2021
BP-2021-03850
Field Review - Addition / Alteration - #2810 To alter the interior of this existing suite on the 28th floor (suite #2810) to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No sprinkler permit required Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 3, 2021
BP-2021-03879
Field Review - Addition / Alteration - #2509 To alter the interior of this existing suite on the 25th floor (suite #2509) to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No sprinkler permit required Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 3, 2021
BP-2021-03856
Field Review - Addition / Alteration - #1208 To alter the interior of this existing suite on the 12th floor (suite #1208) to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No sprinkler permit required Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 3, 2021
BP-2021-03868
Field Review - Addition / Alteration - #1008 To alter the interior of this existing suite on the 10th floor (suite #1008) to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No sprinkler permit required Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 3, 2021
BP-2021-03872
Field Review - Addition / Alteration - #2905 To alter the interior of this existing suite on the 29th floor (suite #2905) to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No sprinkler permit required Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 3, 2021
BP-2021-03880
Field Review - Addition / Alteration - #1909 To alter the interior of this existing suite on the 19th floor (suite #1909) to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No Sprinkler permit required Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 2, 2021
BP-2021-03861
Field Review - Addition / Alteration - #2711 To alter the interior of this existing suite on the 27th floor (suite #2711) to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No sprinkler permit required Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 2, 2021
BP-2021-03854
Field Review - Addition / Alteration - #2710 To alter the interior of this existing suite on the 27th floor (suite #2710) to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No sprinkler permit required Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 2, 2021
BP-2021-03855