




Subject: $599,000 · $1,505/sqft
$599,000
$599,000
Current Price
$549,000
Listed At · Dec 8, 2025
A unique opportunity to own one a piece of precious property in the heart of downtown Vancouver. Built in 2020 by Westbank, this bachelor suite in the iconic Vancouver House building has everything to offer at an affordable price. Best layout studio suite in the building. Featuring Miele appliances, hardwood flooring, sizable balcony with city and water view. One stand storage locker, one bike locker, and a huge cellar storage locker (275 sq. ft. size) is a valuable asset in itself in this location.
MLS #
R3072909
Status
Canceled
Type
Residential
Sub-type
Apartment/Condo
Ownership
Freehold Strata
Zoning
CD-1
Bedrooms
1
Full Baths
1
Half Baths
0
Kitchens
1
Fireplaces
0
Living Area
398 sqft
Main Floor
398 sqft
Stories
59
Year Built
2020
Age
6 years
Roof
Other
Construction
Concrete, Mixed (Exterior)
Structure
Multi Family, Residential Attached
Parking Type
None
Facing
East
Original Price
$549,000
Strata Fee
$485.78/mo
Taxes
$1,711.93/yr
Listed
2025-12-08
MLS Area
Yaletown
City
Vancouver
Postal Code
V6Z 0G5
Subdivision
Yaletown
Heating
Geothermal · Heat Pump
Cooling / A/C
Air Conditioning
Flooring
Hardwood · Tile
Appliances
Washer/Dryer · Dishwasher · Refrigerator · Stove · Oven · Range Top
Security
Smoke Detector(s) · Fire Sprinkler System
Windows
Window Coverings
Interior Features
Elevator · Storage · Pantry
Exterior Features
Balcony
Total Units
375
Rentals Allowed
100
Rental Limit
%
Pets
Cats OK, Dogs OK, Number Limit (Two), Yes With Restrictions
Restrictions
Pets Allowed w/Rest.,Rentals Allwd w/Restrctns,Smoking Restrictions
Strata Mgmt Co.
AWM ALLIANCE REAL ESTATE GROUP
Strata Mgmt Phone
604-685-3227
Transit
NEAR
Schools
NEAR
View
CITY, WATER, MOUNTAIN
Lot Features
Central Location, Marina Nearby, Recreation Nearby
Water Source
Public
Sewer
Public Sewer, Sanitary Sewer
Utilities
Electricity Connected, Natural Gas Connected, Water Connected
Pool
Outdoor Pool
Community
Shopping Nearby
Building Amenities
Exercise Centre · Concierge · Caretaker · Trash · Maintenance Grounds · Gas · Heat · Hot Water · Management · Recreation Facilities · Sewer · Snow Removal · Water · Geothermal
Property Disclosure
Yes
Coordinates: 49.274909, -123.131013 · Map data © Google
Mar 2026
Listed by VIRANI REAL ESTATE ADVISORS
Source: City of Vancouver Open Data
Direct to Inspections - Addition / Alteration - 5301 - 1480 Howe St Interior alterations to provide residential improvements to 5301 on the 53rd floor of this existing mixed use building on this site. Scope of work includes: Converting of 3 Bedroom to 1 bedroom unit, renovation of Kitchen and Bathrooms. Okay for DTI as per A. Hadkar, November 10, 2025
Multiple Dwelling
$400,000
Nov 20, 2025
BP-2025-04717
Field Review - Addition / Alteration - #2706 To alter the interior of this existing suite (UNIT#2706) to perform water damage repairs in this existing commercial/residential building. Letter of assurance submitted by Scott Gordon 604-220-8272, reg. Architect, Architectural Schedule B Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No Sprinkler permit required per District Building Inspector. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Nov 29, 2021
BP-2021-04775
Field Review - Addition / Alteration - #2906 To alter the interior of this existing suite on the 29th floor (suite #2906) to perform water damage repairs in the this existing commercial/residential building. letter of assurance submitted by: Scott Gordon, 604-220-8272, reg. Arch, Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No Sprinkler permit required per District Building Inspector. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Oct 22, 2021
BP-2021-04760
Field Review - Addition / Alteration - #2709 To alter the interior of this existing suite on the 27th floor (suite #2709) to perform water damage repairs in this existing commercial/residential building. letter of assurance submitted by: Scott Gordon, 604-220-8272, Reg.Architect, Architectural Schedule B Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No Sprinkler permit required per District Building Inspector. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Oct 21, 2021
BP-2021-04786
Field Review - Addition / Alteration - #1108 To alter the interior of this existing suite (1108) to perform water damage repairs in this existing commercial/residential building. letter of assurance submitted by: Scott Gordon, 604-220-8272, Reg.Architect, Architectural Schedule B Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No sprinkler permit required per DBI. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Oct 12, 2021
BP-2021-04773
Field Review - Addition / Alteration - #2908 Interior alterations to this existing suite on the 29th floor (suite#2908) to perform water damage repairs in this existing commercial/residential building. letter of assurance submitted by: Scott Gordon, 604-220-8272, reg. Arch, Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No sprinkler permit required per DBI. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Oct 12, 2021
BP-2021-04766
Field Review - Addition / Alteration - #2508 To alter the interior of this existing suite on the 25th floor (suite #2508) to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No sprinkler permit required Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 27, 2021
BP-2021-03867
Field Review - Addition / Alteration - #2907 To alter the interior of this existing suite on the 29th floor (suite #2907) to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No sprinkler permit required Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 27, 2021
BP-2021-03869
Field Review - Addition / Alteration - #1608 To alter the interior of this existing suite on the 16th floor (suite #1608) to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. A Sprinkler permit may be required, as determined by the District Building Inspector. No sprinkler permit required per DBI. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 27, 2021
BP-2021-03866
Field Review - Addition / Alteration - #2010 To alter the interior of this existing suite on the 20th floor (suite #2010) to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No sprinkler permit required Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 23, 2021
BP-2021-03878
Field Review - Addition / Alteration - #2009 To alter the interior of this existing suite on the 20th floor (suite #2009) to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. A Sprinkler permit may be required, as determined by the District Building Inspector. No sprinkler permit required as per DBI. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 23, 2021
BP-2021-03874
Field Review - Addition / Alteration - #1708 To alter the interior of this existing suite on the 17th floor (suite #1708) to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. A Sprinkler permit may be required, as determined by the District Building Inspector. No sprinkler permit required as per DBI. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 23, 2021
BP-2021-03865
Field Review - Addition / Alteration - #2806 To alter the interior of this existing suite on the 28th floor (suite #2806) to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No sprinkler permit required Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 3, 2021
BP-2021-03876
Field Review - Addition / Alteration - #2809 To alter the interior of this existing suite on the 28th floor (suite #2809) to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No sprinkler permit required Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 3, 2021
BP-2021-03852
Field Review - Addition / Alteration - #1508 To alter the interior of this existing suite on the 15th floor (suite #1508) to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No sprinkler permit required Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 3, 2021
BP-2021-03873
Field Review - Addition / Alteration - #2910 To alter the interior of this existing suite on the 29th floor to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No sprinkler permit required Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 3, 2021
BP-2021-03851
Field Review - Addition / Alteration - #1208 To alter the interior of this existing suite on the 12th floor (suite #1208) to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No sprinkler permit required Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 3, 2021
BP-2021-03868
Field Review - Addition / Alteration - #1008 To alter the interior of this existing suite on the 10th floor (suite #1008) to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No sprinkler permit required Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 3, 2021
BP-2021-03872
Field Review - Addition / Alteration - #2905 To alter the interior of this existing suite on the 29th floor (suite #2905) to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No sprinkler permit required Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 3, 2021
BP-2021-03880
Field Review - Addition / Alteration - #2509 To alter the interior of this existing suite on the 25th floor (suite #2509) to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No sprinkler permit required Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 3, 2021
BP-2021-03856
Field Review - Addition / Alteration - #2810 To alter the interior of this existing suite on the 28th floor (suite #2810) to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No sprinkler permit required Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 3, 2021
BP-2021-03879
Field Review - Addition / Alteration - #2909 To alter the interior of this existing suite on the 29th floor to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No sprinkler permit required Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 3, 2021
BP-2021-03850
Field Review - Addition / Alteration - #2711 To alter the interior of this existing suite on the 27th floor (suite #2711) to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No sprinkler permit required Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 2, 2021
BP-2021-03854
Field Review - Addition / Alteration - #1909 To alter the interior of this existing suite on the 19th floor (suite #1909) to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No Sprinkler permit required Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 2, 2021
BP-2021-03861
Field Review - Addition / Alteration - #2710 To alter the interior of this existing suite on the 27th floor (suite #2710) to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No sprinkler permit required Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 2, 2021
BP-2021-03855