$560,000
Listed by: Team 3000 Realty Ltd. · MLS®
Live in Vancouver House, an architecturally signature building by award-winning Westbank. The suite has a separate 1 bedroom with 2 closets and a full 4-piece bathroom. On the 26th floor with an open private eastern view of the Sunrise, False Creek, the Marina and the Seawalk. Comes with a 74 sqft balcony, engineered wide plank white oak floors, full Miele appliance package, sleek bathroom outfitted by Kohler, and Corian kitchen countertops with copper backsplash. The Murfy foldable bed is included. This building has 5 high-speed elevators, an Art Gallery lobby, an outdoor heated pool, a whirlpool, a 10,000 sqft fitness facility, a library, a golf simulator, and a 24-hour concierge. Pets are OK. Minimum 30 days' rental. Fresh Street Market, London Drugs are downstairs.
MLS® #
R3175601
Status
Active
Type
Residential
Sub-type
Apartment/Condo
Ownership
Freehold Strata
Bedrooms
1
Full Baths
1
Half Baths
0
Living Area
415 sqft
Main Floor
415 sqft
Stories
58
Year Built
2020
Age
6 years
Structure
Multi Family, Residential Attached
Parking Stalls
0
Parking Type
None, Rear Access, Garage Door Opener
Heating
Electric · Heat Pump · Other
Cooling / A/C
Central Air · Air Conditioning
Appliances
Washer/Dryer · Dishwasher · Refrigerator · Stove
Laundry
In Unit
Interior Features
Elevator
Exterior Features
Balcony
Pets
Cats OK, Dogs OK, Number Limit (Two), Yes, Yes With Restrictions
View
EAST CITY, FALSE CREEK, MARINA
Lot Features
Central Location, Marina Nearby
Accessibility
Wheelchair Access
Pool
Outdoor Pool
Community
Shopping Nearby
Building Amenities
Clubhouse · Exercise Centre · Recreation Facilities · Concierge · Caretaker · Trash · Maintenance Grounds · Gas · Hot Water · Management · Sewer · Snow Removal · Water
Coordinates: 49.274909, -123.131019 · Map data © Google
Watch this home
Get an email when the price changes, it sells, or a new unit lists in this building. Sign in or create a free account.
Strata fee / sqft (median)
$1.22/mo
56% above area median
Year built
2020
Listings on record
15
15 active now
Rules
Pets: Cats OK, Dogs OK, Number Limit (Two), Yes, Yes With Restrictions
Sale prices, sale-to-list ratio and time to sell for this building are available to registered users. Create a free account or sign in.
Strata Fee
$532.88/mo
Taxes
$1,836.72/yr
MLS® Area
Yaletown
City
Vancouver
Postal Code
V6Z 0G5
Subdivision
Vancouver House
Based on MLS® listings at this address and active strata listings in the area. Keyword flags come from public listing remarks and aren’t a substitute for strata minutes, the depreciation report or a Form B.
Transit-Oriented Area — Tier 3
~660 m from Yaletown — Roundhouse SkyTrain station
Provincial law requires the city to allow at least 3.0 FAR and 8 storeys for residential here — well above typical single-family zoning. Potential land-assembly interest from developers.
~660 m straight-line to Yaletown — Roundhouse SkyTrain
Screening estimate from provincial regulations (TOA station points, B.C. Reg. 263/2023 & 265/2023; small-scale multi-unit housing rules). Distances are straight-line; actual TOA maps are set by municipal bylaw and some parcels (heritage, ALR, exempt areas) are excluded. Confirm with the municipality before relying on it.
0 bd · 1 ba · 367 sqft
MLS® R3171339 · RE/MAX Masters Realty
$2,600

$979,900
Yaletown
MLS® R3174522 · Listed by Framework Marketing Inc.
Source: City of Vancouver Open Data
Direct to Inspections - Addition / Alteration - 5301 - 1480 Howe St Interior alterations to provide residential improvements to 5301 on the 53rd floor of this existing mixed use building on this site. Scope of work includes: Converting of 3 Bedroom to 1 bedroom unit, renovation of Kitchen and Bathrooms. Okay for DTI as per A. Hadkar, November 10, 2025
Multiple Dwelling
$400,000
Nov 20, 2025
BP-2025-04717
Field Review - Addition / Alteration - #2706 To alter the interior of this existing suite (UNIT#2706) to perform water damage repairs in this existing commercial/residential building. Letter of assurance submitted by Scott Gordon 604-220-8272, reg. Architect, Architectural Schedule B Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No Sprinkler permit required per District Building Inspector. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Nov 29, 2021
BP-2021-04775
Field Review - Addition / Alteration - #2906 To alter the interior of this existing suite on the 29th floor (suite #2906) to perform water damage repairs in the this existing commercial/residential building. letter of assurance submitted by: Scott Gordon, 604-220-8272, reg. Arch, Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No Sprinkler permit required per District Building Inspector. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Oct 22, 2021
BP-2021-04760
Field Review - Addition / Alteration - #2709 To alter the interior of this existing suite on the 27th floor (suite #2709) to perform water damage repairs in this existing commercial/residential building. letter of assurance submitted by: Scott Gordon, 604-220-8272, Reg.Architect, Architectural Schedule B Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No Sprinkler permit required per District Building Inspector. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Oct 21, 2021
BP-2021-04786
Field Review - Addition / Alteration - #1108 To alter the interior of this existing suite (1108) to perform water damage repairs in this existing commercial/residential building. letter of assurance submitted by: Scott Gordon, 604-220-8272, Reg.Architect, Architectural Schedule B Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No sprinkler permit required per DBI. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Oct 12, 2021
BP-2021-04773
Field Review - Addition / Alteration - #2908 Interior alterations to this existing suite on the 29th floor (suite#2908) to perform water damage repairs in this existing commercial/residential building. letter of assurance submitted by: Scott Gordon, 604-220-8272, reg. Arch, Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No sprinkler permit required per DBI. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Oct 12, 2021
BP-2021-04766
Field Review - Addition / Alteration - #2508 To alter the interior of this existing suite on the 25th floor (suite #2508) to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No sprinkler permit required Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 27, 2021
BP-2021-03867
Field Review - Addition / Alteration - #2907 To alter the interior of this existing suite on the 29th floor (suite #2907) to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No sprinkler permit required Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 27, 2021
BP-2021-03869
Field Review - Addition / Alteration - #1608 To alter the interior of this existing suite on the 16th floor (suite #1608) to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. A Sprinkler permit may be required, as determined by the District Building Inspector. No sprinkler permit required per DBI. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 27, 2021
BP-2021-03866
Field Review - Addition / Alteration - #2010 To alter the interior of this existing suite on the 20th floor (suite #2010) to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No sprinkler permit required Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 23, 2021
BP-2021-03878
Field Review - Addition / Alteration - #2009 To alter the interior of this existing suite on the 20th floor (suite #2009) to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. A Sprinkler permit may be required, as determined by the District Building Inspector. No sprinkler permit required as per DBI. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 23, 2021
BP-2021-03874
Field Review - Addition / Alteration - #1708 To alter the interior of this existing suite on the 17th floor (suite #1708) to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. A Sprinkler permit may be required, as determined by the District Building Inspector. No sprinkler permit required as per DBI. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 23, 2021
BP-2021-03865
Field Review - Addition / Alteration - #2806 To alter the interior of this existing suite on the 28th floor (suite #2806) to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No sprinkler permit required Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 3, 2021
BP-2021-03876
Field Review - Addition / Alteration - #1508 To alter the interior of this existing suite on the 15th floor (suite #1508) to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No sprinkler permit required Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 3, 2021
BP-2021-03873
Field Review - Addition / Alteration - #2910 To alter the interior of this existing suite on the 29th floor to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No sprinkler permit required Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 3, 2021
BP-2021-03851
Field Review - Addition / Alteration - #2809 To alter the interior of this existing suite on the 28th floor (suite #2809) to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No sprinkler permit required Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 3, 2021
BP-2021-03852
Field Review - Addition / Alteration - #2810 To alter the interior of this existing suite on the 28th floor (suite #2810) to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No sprinkler permit required Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 3, 2021
BP-2021-03879
Field Review - Addition / Alteration - #2909 To alter the interior of this existing suite on the 29th floor to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No sprinkler permit required Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 3, 2021
BP-2021-03850
Field Review - Addition / Alteration - #2905 To alter the interior of this existing suite on the 29th floor (suite #2905) to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No sprinkler permit required Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 3, 2021
BP-2021-03880
Field Review - Addition / Alteration - #2509 To alter the interior of this existing suite on the 25th floor (suite #2509) to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No sprinkler permit required Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 3, 2021
BP-2021-03856
Field Review - Addition / Alteration - #1008 To alter the interior of this existing suite on the 10th floor (suite #1008) to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No sprinkler permit required Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 3, 2021
BP-2021-03872
Field Review - Addition / Alteration - #1208 To alter the interior of this existing suite on the 12th floor (suite #1208) to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No sprinkler permit required Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 3, 2021
BP-2021-03868
Field Review - Addition / Alteration - #2711 To alter the interior of this existing suite on the 27th floor (suite #2711) to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No sprinkler permit required Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 2, 2021
BP-2021-03854
Field Review - Addition / Alteration - #1909 To alter the interior of this existing suite on the 19th floor (suite #1909) to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No Sprinkler permit required Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 2, 2021
BP-2021-03861
Field Review - Addition / Alteration - #1805 To alter the interior of this existing suite on the 18th floor (suite #1805) to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No sprinkler permit required Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 2, 2021
BP-2021-03883