$799,000
Listed by: Vancouver Luxury Realty · MLS®
The best location in the city, moments from the seawall, beach, restaurants and SkyTrain. Welcome to Vancouver House, the city's first LEED Platinum certified building, with geothermal heating and cooling. Resort-style amenities include a lap pool, hot tub, fitness centre and 24/7 concierge. Residence 1901 offers TWO balconies with E and SE exposure, extending your living space outdoors with sunrise views over False Creek and David Lam Park. Inside, the open kitchen and dining area flows effortlessly, complemented by a spacious primary bedroom with an extra-large closet and a private 4-piece bathroom. PLUS 1 EV parking stall, 1 bike locker and 1 BONUS extra-large storage locker. A rare opportunity to own in one of Vancouver's most iconic towers
MLS® #
R3172946
Status
Active
Type
Residential
Sub-type
Apartment/Condo
Ownership
Freehold Strata
Bedrooms
1
Full Baths
1
Half Baths
0
Fireplaces
0
Living Area
660 sqft
Main Floor
660 sqft
Stories
59
Year Built
2020
Age
6 years
Structure
Multi Family, Residential Attached
Parking Stalls
1
Parking Type
Underground, Side Access
Strata Fee
$800.9/mo
Taxes
$2,691.15/yr
MLS® Area
Yaletown
City
Vancouver
Postal Code
V6Z 0G5
Subdivision
Vancouver House
Heating
Forced Air · Heat Pump
Cooling / A/C
Central Air · Air Conditioning
Laundry
In Unit
Windows
Window Coverings
Interior Features
Elevator · Storage
Exterior Features
Balcony
Pets
Yes With Restrictions
Lot Features
Central Location, Marina Nearby, Recreation Nearby
Pool
Outdoor Pool
Community
Shopping Nearby
Building Amenities
Exercise Centre · Recreation Facilities · Maintenance Grounds · Gas · Hot Water · Management
Coordinates: 49.274913, -123.130993 · Map data © Google
Watch this home
Get an email when the price changes, it sells, or a new unit lists in this building. Sign in or create a free account.
Strata fee / sqft (median)
$1.22/mo
56% above area median
Year built
2020
Listings on record
14
14 active now
Rules
Pets: Yes With Restrictions, Cats OK, Dogs OK, Number Limit (Two), Yes
Sale prices, sale-to-list ratio and time to sell for this building are available to registered users. Create a free account
Based on MLS® listings at this address and active strata listings in the area. Keyword flags come from public listing remarks and aren’t a substitute for strata minutes, the depreciation report or a Form B.
Transit-Oriented Area — Tier 3
~650 m from Yaletown — Roundhouse SkyTrain station
Provincial law requires the city to allow at least 3.0 FAR and 8 storeys for residential here — well above typical single-family zoning. Potential land-assembly interest from developers.
~650 m straight-line to Yaletown — Roundhouse SkyTrain
Screening estimate from provincial regulations (TOA station points, B.C. Reg. 263/2023 & 265/2023; small-scale multi-unit housing rules). Distances are straight-line; actual TOA maps are set by municipal bylaw and some parcels (heritage, ALR, exempt areas) are excluded. Confirm with the municipality before relying on it.
2 bd · 3 ba · 1,552 sqft
MLS® R3170821 · VIRANI REAL ESTATE ADVISORS
$2,388,000
Source: City of Vancouver Open Data
Direct to Inspections - Addition / Alteration - 5301 - 1480 Howe St Interior alterations to provide residential improvements to 5301 on the 53rd floor of this existing mixed use building on this site. Scope of work includes: Converting of 3 Bedroom to 1 bedroom unit, renovation of Kitchen and Bathrooms. Okay for DTI as per A. Hadkar, November 10, 2025
Multiple Dwelling
$400,000
Nov 20, 2025
BP-2025-04717
Field Review - Addition / Alteration - #2706 To alter the interior of this existing suite (UNIT#2706) to perform water damage repairs in this existing commercial/residential building. Letter of assurance submitted by Scott Gordon 604-220-8272, reg. Architect, Architectural Schedule B Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No Sprinkler permit required per District Building Inspector. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Nov 29, 2021
BP-2021-04775
Field Review - Addition / Alteration - #2906 To alter the interior of this existing suite on the 29th floor (suite #2906) to perform water damage repairs in the this existing commercial/residential building. letter of assurance submitted by: Scott Gordon, 604-220-8272, reg. Arch, Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No Sprinkler permit required per District Building Inspector. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Oct 22, 2021
BP-2021-04760
Field Review - Addition / Alteration - #2709 To alter the interior of this existing suite on the 27th floor (suite #2709) to perform water damage repairs in this existing commercial/residential building. letter of assurance submitted by: Scott Gordon, 604-220-8272, Reg.Architect, Architectural Schedule B Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No Sprinkler permit required per District Building Inspector. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Oct 21, 2021
BP-2021-04786
Field Review - Addition / Alteration - #2908 Interior alterations to this existing suite on the 29th floor (suite#2908) to perform water damage repairs in this existing commercial/residential building. letter of assurance submitted by: Scott Gordon, 604-220-8272, reg. Arch, Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No sprinkler permit required per DBI. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Oct 12, 2021
BP-2021-04766
Field Review - Addition / Alteration - #1108 To alter the interior of this existing suite (1108) to perform water damage repairs in this existing commercial/residential building. letter of assurance submitted by: Scott Gordon, 604-220-8272, Reg.Architect, Architectural Schedule B Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No sprinkler permit required per DBI. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Oct 12, 2021
BP-2021-04773
Field Review - Addition / Alteration - #2508 To alter the interior of this existing suite on the 25th floor (suite #2508) to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No sprinkler permit required Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 27, 2021
BP-2021-03867
Field Review - Addition / Alteration - #2907 To alter the interior of this existing suite on the 29th floor (suite #2907) to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No sprinkler permit required Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 27, 2021
BP-2021-03869
Field Review - Addition / Alteration - #1608 To alter the interior of this existing suite on the 16th floor (suite #1608) to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. A Sprinkler permit may be required, as determined by the District Building Inspector. No sprinkler permit required per DBI. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 27, 2021
BP-2021-03866
Field Review - Addition / Alteration - #2010 To alter the interior of this existing suite on the 20th floor (suite #2010) to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No sprinkler permit required Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 23, 2021
BP-2021-03878
Field Review - Addition / Alteration - #1708 To alter the interior of this existing suite on the 17th floor (suite #1708) to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. A Sprinkler permit may be required, as determined by the District Building Inspector. No sprinkler permit required as per DBI. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 23, 2021
BP-2021-03865
Field Review - Addition / Alteration - #2009 To alter the interior of this existing suite on the 20th floor (suite #2009) to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. A Sprinkler permit may be required, as determined by the District Building Inspector. No sprinkler permit required as per DBI. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 23, 2021
BP-2021-03874
Field Review - Addition / Alteration - #2806 To alter the interior of this existing suite on the 28th floor (suite #2806) to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No sprinkler permit required Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 3, 2021
BP-2021-03876
Field Review - Addition / Alteration - #1508 To alter the interior of this existing suite on the 15th floor (suite #1508) to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No sprinkler permit required Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 3, 2021
BP-2021-03873
Field Review - Addition / Alteration - #2910 To alter the interior of this existing suite on the 29th floor to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No sprinkler permit required Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 3, 2021
BP-2021-03851
Field Review - Addition / Alteration - #2809 To alter the interior of this existing suite on the 28th floor (suite #2809) to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No sprinkler permit required Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 3, 2021
BP-2021-03852
Field Review - Addition / Alteration - #2909 To alter the interior of this existing suite on the 29th floor to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No sprinkler permit required Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 3, 2021
BP-2021-03850
Field Review - Addition / Alteration - #2810 To alter the interior of this existing suite on the 28th floor (suite #2810) to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No sprinkler permit required Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 3, 2021
BP-2021-03879
Field Review - Addition / Alteration - #2509 To alter the interior of this existing suite on the 25th floor (suite #2509) to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No sprinkler permit required Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 3, 2021
BP-2021-03856
Field Review - Addition / Alteration - #1208 To alter the interior of this existing suite on the 12th floor (suite #1208) to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No sprinkler permit required Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 3, 2021
BP-2021-03868
Field Review - Addition / Alteration - #1008 To alter the interior of this existing suite on the 10th floor (suite #1008) to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No sprinkler permit required Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 3, 2021
BP-2021-03872
Field Review - Addition / Alteration - #2905 To alter the interior of this existing suite on the 29th floor (suite #2905) to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No sprinkler permit required Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 3, 2021
BP-2021-03880
Field Review - Addition / Alteration - #2711 To alter the interior of this existing suite on the 27th floor (suite #2711) to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No sprinkler permit required Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 2, 2021
BP-2021-03854
Field Review - Addition / Alteration - #1909 To alter the interior of this existing suite on the 19th floor (suite #1909) to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No Sprinkler permit required Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 2, 2021
BP-2021-03861
Field Review - Addition / Alteration - #1808 To alter the interior of this existing suite on the 18th floor (suite #1808) to perform water damage repairs in this existing commercial/residential building. Scope of work- detailed in lettered document uploaded letters of assurance submitted by: Scott Gordon, Registered Architect; Architectural Schedule B. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No sprinkler permit required Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$5,000
Sep 2, 2021
BP-2021-03864