




$419,000
Listed by: eXp Realty · MLS®
Welcome to #210 at Talishan Woods, a stylishly updated studio in the heart of East Van! This bright and efficient home features modern laminate floors, granite countertops, sleek cabinetry, and upgraded fixtures throughout. Enjoy morning coffee on your private balcony or stroll just two blocks to the cafés, restaurants, and shops of Commercial Drive. Includes parking and storage. Pets and rentals allowed. Perfect for first-time buyers or investors looking for a turnkey urban retreat in one of Vancouver’s most vibrant communities.
MLS® #
R3152669
Status
Active
Type
Residential
Sub-type
Apartment/Condo
Ownership
Freehold Strata
Bedrooms
0
Full Baths
1
Half Baths
0
Living Area
455 sqft
Main Floor
455 sqft
Stories
3
Year Built
1976
Age
50 years
Structure
Multi Family, Residential Attached
Parking Stalls
1
Parking Type
Garage Under Building, Rear Access, Garage Door Opener
Strata Fee
$371.81/mo
Taxes
$1,249.69/yr
MLS® Area
Grandview Woodland
City
Vancouver
Postal Code
V5N 1C8
Subdivision
Talishan Woods
Heating
Baseboard · Electric
Appliances
Refrigerator · Stove · Microwave
Laundry
Common Area
Windows
Window Coverings
Interior Features
Elevator · Storage
Exterior Features
Balcony
Pets
Yes With Restrictions
Lot Features
Central Location, Lane Access
Community
Shopping Nearby
Building Amenities
Trash · Maintenance Grounds · Management · Snow Removal
Coordinates: 49.268971, -123.072621 · Map data © Google
1 bd · 1 ba · 435 sqft
MLS® R3113121 · eXp Realty
$399,000
Source: City of Vancouver Open Data
Field Review - Addition / Alteration - #114 - 1545 E 2nd Ave Interior alterations to remove a portion of a non-load bearing wall in the kitchen of this existing multiple dwelling building on the site. OK for Field Review as per S.Yu on May 23, 2023
Multiple Dwelling
$500
Jun 2, 2023
BP-2023-01777
Field Review - Addition / Alteration - #203 - 2nd floor Interior alterations to provide improvements for this existing dwelling on the 2nd floor (#202) in this multiple dwelling building on this site. Scope of work: remove 3 partition walls, remove/replace kitchen cabinets, appliances, remove/replace tub, toilet, sink, vanity finishes, lighting, electrical and plumbing work. OK for Field Review per K. Vogt February 24, 2022 E2 - Appliances - Upgrade to an Energuide/Energy Star appliance (fridge; dishwasher) Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Multiple Dwelling
$19,800
Apr 1, 2022
BP-2022-00981
Field Review - Addition / Alteration - Unit 102- 1st Floor Interior alterations to existing bathroom in this dwelling unit (Unit 102) in this existing multiple dwelling building on this site. Scope of Work: remove existing bathtub and replace with a walk-in shower, all in the existing bathroom in unit #102.
Dwelling Unit
$10,000
Jan 21, 2022
BP-2021-06373
Field Review - Addition / Alteration - Exterior alterations to this existing 3-storey Multiple Dwelling building to add 7 canopies over balconies on the 3rd storey (#302,#303,#304 - south elevation / #309,#310,#311,#312 - north elevation) and replace all windows, doors and balcony sliding glass doors on the 1st, 2nd and 3rd storey. Scope of work includes: replacing cedar trim and flashing OK for Field Review per I. Batt, Mar 06/2020. Notes: - Exterior alterations ok per POD H. Ghasemi - OK for DB. - No FSR addition (canopies), per K. Vogt. Energy Upgrade: Voluntary Upgrade - No Additional Upgrades Required. Schedule B Architectural and Schedule D Building Envelope submitted by Michael Grummett, P. Eng., Tel: 604 873-1181.
Multiple Dwelling
$480,000
May 27, 2020
DB-2020-00902
Field Review - Addition / Alteration - #303 Interior alterations to provide improvements for this existing dwelling unit #303 on the 3rd floor of this multiple dwelling building on this site. Scope of work: remove closet and extend kitchen, update kitchen & bathroom, new appliances and HWT, new tile in bathroom & foyer, removal partition wall between kitchen and living room. OK for field review per W.Wong, July 11, 2019 QP is Adrian Lee with EPoch Environmental Consulting Ltd. Notes: 1. Building is non sprinklered 2. Energy trigger chosen; L2 - Appliances - UPgrade to an Energuide/Energy Star appliance (fridge; dishwasher)
Multiple Dwelling
$65,000
Aug 7, 2019
BP-2019-03064