$928,000
Listed by: Royal Pacific Realty Corp. · MLS®
A well maintained 1 bed, 1.5 bath residence in the heart of False Creek, steps to the scenic Seawall. Thoughtfully renovated, exceptional attention to detail, it showcases quality craftsmanship, tasteful finishes, and stylish upgrades throughout. Functional floor plan, generous living and entertaining spaces, and the private patio provides a peaceful retreat and serene ambiance; perfect for enjoyment and hosting guests. Picturesque views from the living room - bright and inviting. Close to Seawall, Granville Island, and the Canada Line, shops, restaurants, cafes, and recreational amenities nearby. Enjoy access to outstanding facilities including an indoor pool, hot tub, sauna, fitness centre, and bike room. Stylish urban living with convenience. Come check out this gem!
MLS® #
R3148923
Status
Active
Type
Residential
Sub-type
Apartment/Condo
Ownership
Freehold Strata
Bedrooms
1
Full Baths
1
Half Baths
1
Fireplaces
1
Living Area
818 sqft
Main Floor
818 sqft
Lot Dimensions
0 x 0.0
Frontage
0
Stories
4
Year Built
1990
Age
36 years
Structure
Multi Family, Residential Attached
Parking Stalls
1
Parking Type
Underground
Strata Fee
$589.57/mo
Taxes
$3,065.26/yr
MLS® Area
False Creek
City
Vancouver
Postal Code
V5Z 4L8
Subdivision
Henley Court
Heating
Electric · Natural Gas
Appliances
Washer/Dryer · Dishwasher · Refrigerator · Stove
Laundry
In Unit
Fireplace
Gas
Windows
Window Coverings
Interior Features
Elevator
Pets
No
Pool
Indoor
Building Amenities
Bike Room · Exercise Centre
Coordinates: 49.269205, -123.116568 · Map data © Google
2 bd · 2 ba · 1,196 sqft
MLS® R3033991 · Engel & Volkers Vancouver
$1,249,800

$775,000
False Creek
MLS® R3149093 · Listed by RE/MAX All Points Realty
Source: City of Vancouver Open Data
Direct to Inspections - Addition / Alteration - Interior alterations to provide residential improvement to an existing dwelling unit at #222 - 525 Wheelhouse Square on the second floor of this existing multiple dwelling building on the site. Revision#1: Floor layout changes: expanded master closet and added a door, replace swing door to pocket door in bathroom #1, move vanity of bathroom #1 to the left wall, increase the island in the kitchen and turned it 90 degrees. Increase project cost to $53,000 (from $50,000). April 14, 2026 (EV) Okay for DTI per A. Best December 2, 2025
Multiple Dwelling
$53,000
Dec 8, 2025
BP-2025-04987
Direct to Inspections - Addition / Alteration - #418 Interior alterations to provide water damage repairs to this dwelling unit #418 on the 4th floor of this existing Multiple Dwelling building on this site. OK for DTI per W.Wong
Dwelling Unit
$20,000
Jun 13, 2025
BP-2024-03641
Direct to Inspections - Addition / Alteration - #404 Interior alterations to provide water damage repairs and restore sunroom at dwelling unit #404 on the 4th floor of this existing Multiple Dwelling building on this site. OK for DTI per W.Wong
Dwelling Unit
$10,000
Mar 26, 2025
BP-2025-00652
Field Review - Addition / Alteration - #418 Interior alterations to reinstate the sunroom sliding glass door at this dwelling unit #418 on the 4th floor of this multiple dwelling building on this site. OK for Field Review per I.Mackie
Dwelling Unit
$5,000
Mar 19, 2025
BP-2025-00490
Direct to Inspections - Addition / Alteration - #406 Interior alterations to provide water damage repairs to this dwelling unit #406 on the 4th floor of this existing Multiple Dwelling building on this site. OK for DTI per W. Wong
Dwelling Unit
$20,000
Feb 21, 2025
BP-2025-00657
Direct to Inspections - Addition / Alteration - #306 Interior alterations to provide improvements to restore sunroom with tiled flooring at dwelling unit #306 on the 3rd floor of this multiple dwelling building on this site. OK for DTI per W.Wong
Multiple Dwelling
$10,000
Dec 24, 2024
BP-2024-04843
Direct to Inspections - Addition / Alteration - #206 Interior alterations to legalize previous work done to the two bathrooms at this dwelling unit #206 on the second floor of this multiple dwelling building on this site. OK for DTI per W. Wong November 20, 2024
Multiple Dwelling
$17,500
Nov 26, 2024
BP-2024-04561
Direct to Inspections - Addition / Alteration - #406 Interior alterations to reinstate the sunroom at dwelling unit #406 on the 4th floor of this multiple dwelling building on this site. OK for DTI per W. Wong October 25, 2024 Note: Flooring in sunroom must be impervious.
Multiple Dwelling
$5,000
Nov 4, 2024
BP-2024-04237
Direct to Inspections - Addition / Alteration - #206 Interior alterations to provide water damage repairs to this dwelling unit #206 on the 2nd floor of this existing Multiple Dwelling building on this site. OK for DTI per W. Wong September 18, 2024
Multiple Dwelling
$20,000
Oct 25, 2024
BP-2024-03630
Direct to Inspections - Addition / Alteration - #318 Interior alterations to provide water damage repairs to this dwelling unit #318 on the 3rd floor of this existing Multiple Dwelling building on this site. OK for DTI per W. Wong September 18, 2024
Multiple Dwelling
$20,000
Sep 24, 2024
BP-2024-03638
Direct to Inspections - Addition / Alteration - #118 Interior alterations to provide water damage repairs to this dwelling unit #118 on the ground floor of this existing Multiple Dwelling building on this site. OK for DTI per W. Wong September 18, 2024
Multiple Dwelling
$20,000
Sep 24, 2024
BP-2024-03629
Direct to Inspections - Addition / Alteration - #218 Interior alterations to provide water damage repairs to this dwelling unit #218 on the 2nd floor of this existing Multiple Dwelling building on this site. OK for DTI per W. Wong September 18, 2024
Multiple Dwelling
$20,000
Sep 24, 2024
BP-2024-03631
Field Review - Addition / Alteration - #302 - To permit interior alterations to this unit #302 in this existing multiple dwelling building on this site. Scope of work: To remove partition walls in the kitchen and bathrooms, update layout for new walk through closet and master ensuite, update to main bathroom, reface fireplace, new finishing and work related plumbing and electrical. Existing Solarium to Remain Enclosed. OK For Field Review per A.Campbell - Jan.18.2021 Notes: 1. Suite - Reached Energy Efficiency Target 2. Sprinkler Permit is not required. 3. Building Inspector to determine Structural Engineer required for the removal of partition walls
Multiple Dwelling
$180,000
Feb 24, 2021
BP-2021-00167
Field Review - Addition / Alteration - #304 - 3rd floor Interior alterations to unit #304 on the 3rd floor of this existing multiple dwelling building. Scope of work includes remove non-load-bearing partition wall to open up kitchen and renovate kitchen, upgrade fireplace. No other work proposed. OK for Field Review per L.Telefson, Feb.6, 2020 This building is sprinklered. District Building Inspector to determine if Sprinkler Permit is required. District Building Inspector to determine if Schedule B required for removal of the wall. Energy Upgrade Selected: L2 - Lighting - Install lighting dimmer, timers, and/or motion detectors on interior lights
Multiple Dwelling
$30,000
Apr 2, 2020
BP-2020-00433
Field Review - Addition / Alteration - #317 Interior alterations to provide improvements to dwelling unit #317 on the 3rd floor of this multiple dwelling building on this site. Work to include removal of a bathroom wall. OK for field review per W.Wong, September 12, 2019 Schedule B Structural submitted per Julian Bozsik, 604-431-0055 Structural Schedule B submitted by Julian Bozsik, P.Eng, 604.431.0055 Notes: 1. Building inspector to determine on site is a separate sprinkler permit is required. 2. Energy trigger chosen: L2 - SWH - Install low flow shower heads in all showers
Multiple Dwelling
$45,000
Nov 7, 2019
BP-2019-04088
Field Review - Addition / Alteration - Unit #418 - 4th floor Exterior and interior alterations to provide improvements to dwelling unit #418 on the 4th floor of this existing multiple dwelling building on this site. Exterior changes to northwest elevation to replace windows with sliding doors and a swing door. OK for DB per Ji-Taek Park, August 13, 2018. OK for Field Review per W.Wong, August 13, 2018. Letter of Assurance submitted by: CRP Schedule A, Architectural Schedule B, Building Envelope Schedule D-1, Douglas A. Massie, Architect, 604.264.1450 Structural Schedule B, Sharat Chande, 604.291.7434 Note: 1) Energy trigger chosen; L2 - Appliances - Upgrade to an Energuide/Energy Star appliance (washer/dryer) AND L2 - Lighting - Upgrade all hard wired Lighting within an occupied space to High Efficiency light systems
Multiple Dwelling
$175,000
Sep 18, 2018
DB-2018-04329
Field Review - Addition / Alteration - #221 Interior alterations only to provide upgrades to this existing residential dwelling unit #221 at this existing Multiple Dwelling building. OK for field review as per Howie Chow, February 19, 2018. Related to IA-2018-00373. Selected Energy Upgrade: L2 - Appliances - Upgrade to an Energuide/Energy Star appliance (washer; dryer)
Multiple Dwelling
$100,000
Mar 23, 2018
BP-2018-00878