$1,399,000
Listed by: Dexter Realty · MLS®
Experience luxury urban living in this expansive 3-bedroom or 2 bedroom + den, 2-bathroom NW corner condo with 1,446 square feet of well-designed space and unobstructed VIEWS of False Creek, the iconic Science World dome, the city skyline & great sunsets! The Viceroy, built by Bosa is a well maintained bldg - updated plumbing (4 years) & updates to designer lobby + hallways, elevators + large indoor pool. Walk everywhere from this centrally located condo - the seawall, SkyTrain, BC Place, Rogers Arena, Olympic Village, Science world, restaurants, downtown, and new St Paul's Hospital. Outdoor balcony (10'7 X 7'8"), two secure parking stalls (#114 & #115) + storage locker. EV charging, car wash and visitor parking are available.
MLS® #
R3149108
Status
Active
Type
Residential
Sub-type
Apartment/Condo
Ownership
Freehold Strata
Bedrooms
3
Full Baths
2
Half Baths
0
Fireplaces
1
Living Area
1,446 sqft
Main Floor
1,446 sqft
Stories
27
Year Built
1997
Age
29 years
Structure
Multi Family, Residential Attached
Parking Stalls
2
Parking Type
Garage Under Building, Guest, Side Access
Strata Fee
$940/mo
Taxes
$4,222.13/yr
MLS® Area
Downtown VE
City
Vancouver
Postal Code
V6A 4H2
Subdivision
The Viceroy
Heating
Electric · Natural Gas
Appliances
Washer/Dryer · Dishwasher · Refrigerator · Stove · Microwave
Laundry
In Unit
Fireplace
Gas
Windows
Window Coverings
Interior Features
Elevator
Exterior Features
Garden · Balcony
Pets
Cats OK, Dogs OK, Number Limit (Two), Yes With Restrictions
View
False Creek & Cityscape
Lot Features
Central Location, Marina Nearby, Recreation Nearby
Pool
Indoor
Community
Shopping Nearby
Building Amenities
Exercise Centre · Recreation Facilities · Sauna/Steam Room · Caretaker · Trash · Maintenance Grounds · Gas · Hot Water · Management · Snow Removal
2 bd · 2 ba · 1,081 sqft
MLS® R3054064 · Homelife Deeyar Realty
$3,500
Source: City of Vancouver Open Data
Field Review - Addition / Alteration - Exterior alterations to provide improvements to add a new fence with security gate at this multiple dwelling building on this site. OK for DB per M.Einifar OK for Field Review per I.Mackie Related to DB-2024-00168 (120 Milross Ave)
Multiple Dwelling
$20,000
Feb 12, 2025
DB-2025-00177
Direct to Inspections - Addition / Alteration - #2105 Interior alterations to provide improvements to dwelling unit #2105 on the 21st floor of this multiple dwelling building on this site. OK to process as DTI as per W. Wong May 30, 2023
Multiple Dwelling
$245,000
Jun 5, 2023
BP-2023-01829
Field Review - Addition / Alteration - To install a heat pump on the balcony of this dwelling unit #2006 on the 20th floor of this multiple dwelling building. Architectural Schedule B and Schedule D, Farhad Hemmati, P Eng; ph:604.369.1630 Energy Upgrade exempted: Heat Pump Installation OK to process as DTI as per J. Zhang June 7, 2022
Multiple Dwelling
$15,000
Aug 4, 2022
DB-2022-02951
Field Review - Addition / Alteration - #2003 - 20th floor Interior alterations to provide improvements to this existing dwelling unit on the 20th floor (#2003) in this existing multiple dwelling use building on the site. Scope of work: remove one partition wall, replace cabinetry, appliances, millwork, lighting, reduce ceiling bulkhead, electrical, plumbing and sprinkler work. OK for Field Review per Shelley D - May 30, 2022 E2 - Appliances - Upgrade to an Energuide/Energy Star appliance (fridge; dishwasher) Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant's responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Multiple Dwelling
$60,000
Jun 14, 2022
BP-2022-02792
Field Review - Addition / Alteration - #2304 - 23rd floor Interior alterations to provide improvements to this existing multiple dwelling building. Scope of work to include the removal of the kitchen partition wall, renovate kitchen & bathrooms, remove existing finishing and replace with new finishing, and work related to electrical & plumbing. OK for Field Review per Kim V - Jul 13/20 Notes: 1) Energy upgrade trigger: L2 - Lighting - Install energy efficient lighting fixtures (single occupied space area) 2) Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. 3) DBI to determine if P. Eng is required to remove kitchen wall
Multiple Dwelling
$120,000
Aug 18, 2020
BP-2020-02144
Field Review - Addition / Alteration - #1004 - 10th floor Interior alterations to provide tenant improvements to this existing unit #1004 in this existing multiple dwelling. Scope of work to include : Demo some interior walls throughout unit. Rebuild walls for new ensuite bathroom and update all fixtures, tile and cabinetry throughout both bathrooms. Remove a non-load bearing wall in the kitchen and redo cabinetry, counter tops and update appliances and fixtures. Update electrical, flooring and paint throughout unit. OK For Field Review as per A.Campbell - May.9.2019 Architectural Schedule B (wall penetration) & Building Envelope Schedule D-1 submitted by Ali Reza Zavosh, P.Eng., 604.428.7677 Selected Energy Upgrade: L2 - Appliances - Upgrade to an Energuide/ Energy Star appliance (fridge; dishwasher) Building Sprinklered – Building inspector to determine on site is a separate sprinkler permit is required.
Multiple Dwelling
$150,000
Jun 11, 2019
BP-2019-02000
Field Review - Addition / Alteration - #1501 Interior alterations to provide improvements to this dwelling unit #1501 on the 15th floor of this multiple dwelling building on this site. Scope of work to include: flooring replacement and underlay per Strata requirements, bathroom(2) and kitchen updates (raising ceiling, moving one sprinkler, and kitchen and light fittings) OK for field review per W.Wong, November 6, 2018. Note: Energy trigger chosen; L2 - Appliances - Upgrade to an Energuide/Energy Star appliance (fridge; dishwasher)
Multiple Dwelling
$80,000
Nov 26, 2018
BP-2018-05798
Field Review - Addition / Alteration - Interior alterations to the 17th floor (suite #1705) to renovate this existing suite in this multiple dwelling building. Scope of work includes: removal of non-loadbearing partition walls, removal and replacement of plumbing fixtures in the kitchen and bathroom areas. New flooring, new cabinets, new plumbing fixtures (same location), replace existing sprinkler heads, repair drywall, add additional lighting and new tile in bathrooms. Energy Upgrade Selected: L2 - Lighting - Install lighting dimmer, timers, and/or motion detectors on interior lights.
Multiple Dwelling
$45,000
Sep 18, 2018
BP-2018-04345
Field Review - Addition / Alteration - #905 Interior alterations to provide improvements to this unit #905 on the 9th floor in this existing multiple dwelling building on this site. Scope of work includes renovation of kitchen, bathroom, reconfigure of closet and door, install new appliances and fireplace. OK for field review as per Jamie Zhang, Feb.16/18 Energy Checklist: L2 - HVAC - Install timers (up to 60 minute), or humidistat for washroom fan(s)
Multiple Dwelling
$145,000
Mar 13, 2018
BP-2018-00842