




Subject: $959,000 · $781/sqft
$959,000
$959,000
Current Price
$978,000
Listed At · Aug 28, 2025
Welcome to The Viceroy by BOSA. This bright 2 bed, 2 bath plus solarium home offers beautiful False Creek and city views. The functional layout features hardwood floors, a modern kitchen with granite counters and stainless steel appliances, and spacious rooms with plenty of light. The solarium is perfect for a home office or flex space. Amenities include an indoor pool, hot tub, gym, and sauna. Pets and rentals are allowed in this well-managed community. Steps to the seawall, Olympic Village, SkyTrain, and top dining. Includes 1 parking stall and a storage locker.
MLS #
R3041399
Status
Canceled
Type
Residential
Sub-type
Apartment/Condo
Ownership
Freehold Strata
Zoning
CD-1
Bedrooms
2
Full Baths
2
Half Baths
0
Kitchens
1
Living Area
1,228 sqft
Main Floor
1,228 sqft
Stories
27
Year Built
1997
Age
28 years
Construction
Concrete, Brick (Exterior), Concrete (Exterior)
Structure
Multi Family, Residential Attached
Parking Stalls
1
Parking Type
Underground
Original Price
$978,000
Strata Fee
$766/mo
Taxes
$3,118.27/yr
Listed
2025-08-28
MLS Area
Downtown VE
City
Vancouver
Postal Code
V6A 4H2
Subdivision
Viceroy
Heating
Electric
Flooring
Hardwood · Tile
Appliances
Washer/Dryer · Dishwasher · Refrigerator · Stove
Laundry
In Unit
Exterior Features
No Outdoor Area
Total Units
152
Pets
Yes With Restrictions
Restrictions
Pets Allowed w/Rest.,Rentals Allwd w/Restrctns
Strata Mgmt Co.
The Wynford Group
Strata Mgmt Phone
604-261-0285
Lot Features
Marina Nearby, Recreation Nearby
Water Source
Public
Sewer
Public Sewer
Utilities
Community, Electricity Connected, Water Connected
Pool
Indoor
Community
Shopping Nearby
Building Amenities
Exercise Centre · Sauna/Steam Room · Concierge · Caretaker · Trash · Maintenance Grounds · Gas · Hot Water · Management · Recreation Facilities
Property Disclosure
Yes
Coordinates: 49.275193, -123.101700 · Map data © Google
Listed by Macdonald Realty Westmar
Source: City of Vancouver Open Data
Field Review - Addition / Alteration - Exterior alterations to provide improvements to add a new fence with security gate at this multiple dwelling building on this site. OK for DB per M.Einifar OK for Field Review per I.Mackie Related to DB-2024-00168 (120 Milross Ave)
Multiple Dwelling
$20,000
Feb 12, 2025
DB-2025-00177
Direct to Inspections - Addition / Alteration - #2105 Interior alterations to provide improvements to dwelling unit #2105 on the 21st floor of this multiple dwelling building on this site. OK to process as DTI as per W. Wong May 30, 2023
Multiple Dwelling
$245,000
Jun 5, 2023
BP-2023-01829
Field Review - Addition / Alteration - To install a heat pump on the balcony of this dwelling unit #2006 on the 20th floor of this multiple dwelling building. Architectural Schedule B and Schedule D, Farhad Hemmati, P Eng; ph:604.369.1630 Energy Upgrade exempted: Heat Pump Installation OK to process as DTI as per J. Zhang June 7, 2022
Multiple Dwelling
$15,000
Aug 4, 2022
DB-2022-02951
Field Review - Addition / Alteration - #2003 - 20th floor Interior alterations to provide improvements to this existing dwelling unit on the 20th floor (#2003) in this existing multiple dwelling use building on the site. Scope of work: remove one partition wall, replace cabinetry, appliances, millwork, lighting, reduce ceiling bulkhead, electrical, plumbing and sprinkler work. OK for Field Review per Shelley D - May 30, 2022 E2 - Appliances - Upgrade to an Energuide/Energy Star appliance (fridge; dishwasher) Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant's responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Multiple Dwelling
$60,000
Jun 14, 2022
BP-2022-02792
Field Review - Addition / Alteration - #2304 - 23rd floor Interior alterations to provide improvements to this existing multiple dwelling building. Scope of work to include the removal of the kitchen partition wall, renovate kitchen & bathrooms, remove existing finishing and replace with new finishing, and work related to electrical & plumbing. OK for Field Review per Kim V - Jul 13/20 Notes: 1) Energy upgrade trigger: L2 - Lighting - Install energy efficient lighting fixtures (single occupied space area) 2) Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. 3) DBI to determine if P. Eng is required to remove kitchen wall
Multiple Dwelling
$120,000
Aug 18, 2020
BP-2020-02144
Field Review - Addition / Alteration - #1004 - 10th floor Interior alterations to provide tenant improvements to this existing unit #1004 in this existing multiple dwelling. Scope of work to include : Demo some interior walls throughout unit. Rebuild walls for new ensuite bathroom and update all fixtures, tile and cabinetry throughout both bathrooms. Remove a non-load bearing wall in the kitchen and redo cabinetry, counter tops and update appliances and fixtures. Update electrical, flooring and paint throughout unit. OK For Field Review as per A.Campbell - May.9.2019 Architectural Schedule B (wall penetration) & Building Envelope Schedule D-1 submitted by Ali Reza Zavosh, P.Eng., 604.428.7677 Selected Energy Upgrade: L2 - Appliances - Upgrade to an Energuide/ Energy Star appliance (fridge; dishwasher) Building Sprinklered – Building inspector to determine on site is a separate sprinkler permit is required.
Multiple Dwelling
$150,000
Jun 11, 2019
BP-2019-02000
Field Review - Addition / Alteration - #1501 Interior alterations to provide improvements to this dwelling unit #1501 on the 15th floor of this multiple dwelling building on this site. Scope of work to include: flooring replacement and underlay per Strata requirements, bathroom(2) and kitchen updates (raising ceiling, moving one sprinkler, and kitchen and light fittings) OK for field review per W.Wong, November 6, 2018. Note: Energy trigger chosen; L2 - Appliances - Upgrade to an Energuide/Energy Star appliance (fridge; dishwasher)
Multiple Dwelling
$80,000
Nov 26, 2018
BP-2018-05798
Field Review - Addition / Alteration - Interior alterations to the 17th floor (suite #1705) to renovate this existing suite in this multiple dwelling building. Scope of work includes: removal of non-loadbearing partition walls, removal and replacement of plumbing fixtures in the kitchen and bathroom areas. New flooring, new cabinets, new plumbing fixtures (same location), replace existing sprinkler heads, repair drywall, add additional lighting and new tile in bathrooms. Energy Upgrade Selected: L2 - Lighting - Install lighting dimmer, timers, and/or motion detectors on interior lights.
Multiple Dwelling
$45,000
Sep 18, 2018
BP-2018-04345
Field Review - Addition / Alteration - #905 Interior alterations to provide improvements to this unit #905 on the 9th floor in this existing multiple dwelling building on this site. Scope of work includes renovation of kitchen, bathroom, reconfigure of closet and door, install new appliances and fireplace. OK for field review as per Jamie Zhang, Feb.16/18 Energy Checklist: L2 - HVAC - Install timers (up to 60 minute), or humidistat for washroom fan(s)
Multiple Dwelling
$145,000
Mar 13, 2018
BP-2018-00842