$1,599,000
Listed by: Team 3000 Realty Ltd. · MLS®
Live at 888 Beach with the Seawall, water taxi and all of Yaletown/Downtown at your doorstep. This lovely spacious one owner townhome provides three bedrooms, three bathrooms on two levels and awaits a new family. Two parking and one storage complete the package. The development is beautifully presented, maintained and managed and provides resort style living with concierge, pool, gym, lounge, meeting room and a beautiful recently landscaped inner courtyard. Live the lifestyle.
MLS® #
R3168140
Status
Active
Type
Residential
Sub-type
Townhouse
Ownership
Freehold Strata
Bedrooms
3
Full Baths
3
Half Baths
0
Living Area
1,669 sqft
Main Floor
1,669 sqft
Year Built
1993
Age
33 years
Structure
Residential Attached
Parking Stalls
2
Parking Type
Underground
Strata Fee
$1,311.85/mo
Heating
Electric · Natural Gas
Laundry
In Unit
Interior Features
Elevator · Storage
Pets
Yes
Pool
Indoor
Building Amenities
Bike Room · Clubhouse · Exercise Centre · Concierge · Trash · Maintenance Grounds · Gas · Hot Water · Management · Sewer · Snow Removal · Water
Coordinates: 49.274497, -123.132423 · Map data © Google
Taxes
$5,057.13/yr
MLS® Area
Yaletown
City
Vancouver
Postal Code
V6Z 2P8
2 bd · 2 ba · 1,249 sqft
MLS® R3094545 · Stilhavn Real Estate Services
$1,199,000

$674,900
Yaletown
MLS® R3167694 · Listed by Stilhavn Real Estate Services
Source: City of Vancouver Open Data
Field Review - Addition / Alteration - #1201 - 12th Floor Interior alterations to provide improvements to the dwelling unit on the 12th floor (#1201) in this existing multiple dwelling building on this site. Scope of work: demo kitchen, bathroom, fireplace, new partition walls to reconfigure layout, new kitchen, bathroom, fireplace, ceiling, millwork, finishes. Plumbing, electrical, sprinklers to suit. OK for field review as per K Vogt E2 - HVAC - Install timers (up to 60 mins) , or humidifier for washroom fan(s) Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant's responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Multiple Dwelling
$180,000
Jan 26, 2022
BP-2021-06669
Field Review - Addition / Alteration - #T08 Interior alterations to renovate this existing townhouse unit T08 in this existing multiple dwelling building on this site. Scope of work: - New flooring, millwork, fixtures - Kitchen renovation - Remove/relocate partition walls - Improve sound rating of some walls Note: - Energy Upgrade: E2 - Lightning - Install lightening dimmer, timers, and/or motion detectors on interior lights - DBI to determine on site whether Structural drawings and schedule B are required - This building is sprinkler - Separate sprinkler permit is required for all related works Ok for field review as per Jamie Zhang, May 20/21
Multiple Dwelling
$150,000
Jun 18, 2021
BP-2021-02413
Field Review - Addition / Alteration - #405 - Per the 2019 VBBL, to provide interior alterations to residential unit #405 on the 4th floor of this existing multiple dwelling building on site. Scope of work includes : remove partition walls, new partition walls and doors, and electrical work. OK for field review as per C.Yue on Jan 30/20 NOTE: Building inspector to determine on site if structural is required for partition removal. NOTE: Building sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. Energy Upgrade: L2 - HVAC - Install timers (up to 60 minute), or humidistat for laundry room
Multiple Dwelling
$15,000
Feb 21, 2020
BP-2020-00351
Field Review - Addition / Alteration - #T12 Interior alterations only to provide improvements to the lower floor of this existing townhouse residential dwelling unit #T12 at this existing Multiple Dwelling building. Scope of work is for new flooring, lighting, painting, remove walls for kitchen and bathroom updates, RE&RE existing gas fireplace. OK for field review as per S.Yu on July 26, 2019 DBI to determine on site if a Schedule B (Structural) would be required. Energy upgrade: L2 - Lighting - Install lighting dimmer, timers, and/or motion detectors on interior lights
Multiple Dwelling
$100,000
Aug 26, 2019
BP-2019-03354
Field Review - Addition / Alteration - #T15 Interior alterations only to provide improvements to the lower, main, and upper floors of this existing townhouse residential dwelling unit #T15 at this existing Multiple Dwelling building. OK for field review as per Howie Chow, July 4, 2019. DBI to determine if a sprinkler permit would be required. Energy upgrade: L2 - Lighting - Install energy efficient lighting fixtures (single occupied space area)
Multiple Dwelling
$80,000
Jul 25, 2019
BP-2019-02975