$1,799,000
Listed by: Dexter Realty · MLS®
A little Paris, a lot of Vancouver. This chic home in iconic Hycroft Towers pairs crown moulding, huge windows and panoramic views with effortless vintage charm. An expansive kitchen, dining area and casual and formal living spaces set the scene for memorable evenings. Two bedrooms, two bathrooms and an office that could be a third bedroom offer flexibility. Special extras: in-suite laundry, a rare private deck off a bedroom and shared rooftop deck access right outside your front door—so close it feels practically your own. Enjoy lounge chairs and sweeping city views above it all. South Granville’s cafés, shops, restaurants and parks are steps away, with easy access to downtown. French sensibility. West Coast outlook. First Showings: Tuesday Sept 22nd 10:30-12, Thursday Sept 24th 5-6:30.
MLS® #
R3167212
Status
Active
Type
Residential
Sub-type
Apartment/Condo
Style
Penthouse
Ownership
Freehold Strata
Bedrooms
3
Full Baths
2
Half Baths
0
Fireplaces
1
Living Area
1,697 sqft
Main Floor
1,697 sqft
Stories
8
Year Built
1951
Age
75 years
Structure
Multi Family, Residential Attached
Parking Stalls
1
Parking Type
Open
Strata Fee
$1,144.95/mo
Taxes
$5,298.21/yr
MLS® Area
Fairview VW
City
Vancouver
Postal Code
V6H 1S5
Subdivision
Hycroft Towers
Heating
Hot Water
Appliances
Washer/Dryer · Dishwasher · Refrigerator · Stove · Microwave
Laundry
In Unit
Fireplace
Electric
Windows
Window Coverings
Interior Features
Elevator · Storage
Exterior Features
Balcony
Pets
Cats OK, No Dogs, Yes With Restrictions
View
City, Mountains, Ocean
Lot Features
Central Location, Recreation Nearby
Community
Shopping Nearby
Building Amenities
Caretaker · Trash · Maintenance Grounds · Heat · Hot Water · Management · Snow Removal
Coordinates: 49.257511, -123.138056 · Map data © Google
1 bd · 1 ba · 606 sqft
MLS® R2989860 · Oakwyn Realty Ltd.
$519,000
Source: City of Vancouver Open Data
Enquiry Centre - Addition / Alteration - Interior alterations for fire alarm upgrades to this existing Multiple Dwelling building on this site. Schedule B - ELEC - Matthew Wojtasiewicz - 604-283-1924
Multiple Dwelling
$421,000
Jul 28, 2026
BP-2026-02068
Direct to Inspections - Addition / Alteration - 218-1445 Marpole Avenue Interior alterations to provide residential improvements to unit 218-1445 Marpole Avenue on the 2nd level of this existing multiple dwelling building on this site. Scope of work includes: returning the unit to the original layout of 2 bedrooms. This involves installing 2 (non load bearing) walls, a new door, new electrical outlets, replacing pot lights and installing one switch. Okay for DTI as per Isidora C. July 29, 2025.
Dwelling Unit
$6,000
Aug 5, 2025
BP-2025-03406
Direct to Inspections - Addition / Alteration - #508 Interior alterations to provide improvements to dwelling unit #508 on the 5th floor of this multiple dwelling building on this site. OK for DTI per W. Wong January 16, 2025
Multiple Dwelling
$50,000
Jan 20, 2025
BP-2025-00171
Direct to Inspections - Addition / Alteration - #414 - 4th floor Interior alterations to provide improvements for unit #414 in this existing multiple dwelling building. Scope of work: New kitchen layout, removal of closet and pantry. Relocation of electrical panel. OK for DTI as per Kirat Kang, March 30, 2023
Dwelling Unit
$25,000
Mar 30, 2023
BP-2023-01049
Field Review - Addition / Alteration - #516 - 5th floor Interior alterations to provide improvements to the kitchen in this existing dwelling unit on the 5th floor (#516) in this existing multiple dwelling building on this site. Scope of work: replacing cabinets, counters, appliances, new dropped ceiling with recessed lighting over kitchen and dinning area, electrical and plumbing work. OK for Field Review per W. Wong, Oct. 3, 2022 Building Sprinklered - Building Inspector to determine on site site if a separate sprinkler permit is required. E2 - Lighting - Install dimmer, timers, and/or m otion detectors on interior lights. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Multiple Dwelling
$40,000
Oct 19, 2022
BP-2022-04633
Field Review - Addition / Alteration - #602 - To permit Interior alterations to this Unit #602 in this existing multiple dwelling building on this site. Scope to Include: Remove and replace kitchen cabinets, countertops, and floors/ Upgrade to new appliances. Covert Tub to shower, new tile surround, and lighting in bathroom. OK For Field Review per A.Campbell & A.Wroblewski - Nov.2.2020 Energy Upgrade: L2 - Appliances - Upgrade to an Energuide/Energy Star appliance (washer; dryer)
Multiple Dwelling
$40,000
Nov 20, 2020
BP-2020-03410
Field Review - Addition / Alteration - #701 - 7th Floor Interior alterations only to provide a new sink and new dishwasher at this existing condominium unit at this existing multiple dwelling building. Scope of work includes drop ceiling by 2", removing cosmetic wall, electrical & plumbing work. OK for Field Review by K Vogt - July 13/20 TENANT: Keith & Brady Notes: 1) Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. 2) Energy upgrade trigger: L2 - Lighting - Install energy efficient lighting fixtures (single occupied space area)
Multiple Dwelling
$25,000
Sep 17, 2020
BP-2020-02142
Field Review - Addition / Alteration - #816 - 8th Floor Interior alterations to provide improvements to the existing tenant in this existing multiple dwelling building. Scope of work per V.B.B.L. 2019 includes demolish/construct partition walls to alter floor plan to make two bedrooms into 1 larger bedroom, and expand the bathroom area, new kitchen with island, millwork, electrical & plumbing work. TENANT: Jennifer Galan Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. Selected Energy Upgrade: L1 - Lighting - Install motion detector within closets with LED/CFL lighting (ex: Pantry, walk-in)
Multiple Dwelling
$150,000
Aug 28, 2020
BP-2020-02109
Field Review - Addition / Alteration - #212 - 2nd Floor Interior alterations to provide flood damage repair to this existing multiple dwelling. Selected Energy Upgrade: L2 - Lighting - Install lighting dimmer, timers, and/or motion detectors on interior lights Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required.
Multiple Dwelling
$40,000
Jul 30, 2020
BP-2020-01759
Field Review - Addition / Alteration - #817 Interior alterations to provide improvements to this existing unit #817 on the 8th floor in this existing multiple dwelling building on this site. OK for field review as per Jamie Zhang, Aug.02/18 Scope of Work: - Demolish existing interior walls and construct new interior walls to suit new layout - Install new doors, flooring, millwork, plumbing fixtures, sinks and counter top Energy Upgrade Selected: L2- Appliances - Upgrade to an Energuide/ Energy Star Appliance (fridge, dishwasher) Non-Sprinklered Building
Multiple Dwelling
$75,000
Aug 23, 2018
BP-2018-04176
Field Review - Addition / Alteration - #505 Interior alteration to remove a wall between kitchen and living room, remove bulk head, and install new light fixtures for unit #505 on the 5th floor of this existing multiple dwelling building. Okay for field review as per E.Kai March 23/18 L2 - Lighting - Install lighting dimmer, timers, and/or motion detectors on interior lights
Multiple Dwelling
$10,000
Jun 15, 2018
BP-2018-01602
Field Review - Addition / Alteration - (#408-4th floor) Interior alterations to provide improvements for unit #408 in this existing multiple dwelling building. OK for field review as per Eun Jeon, March 31, 2017 Energy upgrade: L2 - Lighting - Install lighting dimmer, timers, and/or motion detectors on interior lights
Multiple Dwelling
$45,000
May 10, 2017
BP-2017-01662
Field Review - Addition / Alteration - #610 - Interior alterations to unit #610 on the 6th floor of this existing multiple dwelling building on this site. Scope of work includes: renovating two bathrooms and relocating of a wall for the ensuite bathroom. Schedule B (Structural) may be required by District Building Inspector to be determined on site. OK for field review per W.Wong, February 28, 2017. Selected Energy Upgrade: L2 - Lighting - Install energy efficient lighting fixtures (single occupied space area).
Multiple Dwelling
$37,000
Mar 22, 2017
BP-2017-01096