$240,000
Listed by: Oakwyn Realty Ltd. · MLS®
Bright corner one-bedroom at Surfcrest, steps to English Bay and Stanley Park. Renovated kitchen, new carpet throughout, and a peek-a-boo view toward the water. Currently tenanted at $2,450/month on a month-to-month lease, an investor friendly hold from day one. Rentals allowed, no pets. Includes one secured parking stall and a storage locker, plus bike room, elevator, and indoor pool. This is a leasehold property with approximately 47 years remaining, priced to reflect the term. A rare value entry point into one of Vancouver's most walkable West End locations.
MLS® #
R3166823
Status
Active
Type
Residential
Sub-type
Apartment/Condo
Ownership
Leasehold prepaid-NonStrata
Bedrooms
1
Full Baths
1
Half Baths
0
Living Area
601 sqft
Main Floor
601 sqft
Year Built
1974
Age
52 years
Structure
Multi Family, Residential Attached
Parking Stalls
1
Parking Type
Underground, Rear Access
Strata Fee
$906/mo
MLS® Area
West End VW
City
Vancouver
Postal Code
V6G 2H9
Subdivision
Surfcrest
Heating
Baseboard
Exterior Features
Balcony
Pets
No Cats, No Dogs, No
Building Amenities
Caretaker · Electricity · Trash · Gas · Heat · Hot Water · Management · Sewer · Taxes · Water
Coordinates: 49.285020, -123.139914 · Map data © Google
1 bd · 1 ba · 545 sqft
MLS® R3130236 · Oakwyn Realty Ltd.
$244,000
Source: City of Vancouver Open Data
Field Review - Addition / Alteration - Exterior alterations for windows and doors replacement in this existing multiple dwelling building on this site. Ok for field review per Jamie Z., Mar 26, 2026. Schedule A - CRP - Adam Bodlack - 604-738-0048 Schedule B - ARCH - Adam Bodlack - 604-738-0048 Schedule D - Adam Bodlack - 604-738-0048
Multiple Dwelling
$5,500,000
Jun 25, 2026
DB-2026-00942
High Density Housing / Commercial - Addition / Alteration - Exterior alterations to repair concrete surfaces (top surface, soffit, and vertical), replace waterproofing system at top level of suspended parking level, and replace shingle roof system at north end of parkade with metal roofing system to this existing multiple dwelling high-rise building on this site. Notes: 1. Concrete repairs to be performed at locations of delaminated concrete. 2. No electrical work proposed. 3. Permit reviewed and approved to VBBL #12511 (2019)
Multiple Dwelling
$200,000
Oct 3, 2023
DB-2023-02443
Field Review - Addition / Alteration - #1501 Interior alterations to provide residential unit improvement to #1501 on the 15th floor of this existing multiple dwelling building. Scope of work is to remove interior walls at the kitchen area and new lighting to suit. REVISION #1: - Reconfigure the kitchen, including new plumbing and electrical receptacles. B. Wong - Feb /23 OK for Field Review as per S.Yu on Jan 16, 2023 Notes: - DBI to determine on site is Schedule B, Structural, is required. - This building is not sprinklered.
Multiple Dwelling
$4,100
Jan 26, 2023
BP-2023-00285
Field Review - Addition / Alteration - #1508 - Interior alteration to provide residential unit improvements to suite #1508 on the 15th floor? of this existing multiple dwelling building on this site. Scope of work: Kitchen and bathroom updates, remove partition wall, and plumbing work. Note: Balcony to be retained. Flooring to remain impervious and doors to the balcony to maximize glass area to admit natural light to the interior space beyond. Okay for field review per C.Yue Sept 5/18 Selected Energy Upgrade: L2 - Appliances - Upgrade to an Energuide/Energy Star appliance (fridge; dishwasher)
Multiple Dwelling
$45,000
Oct 31, 2018
BP-2018-04788
High Density Housing / Commercial - Addition / Alteration - Building Envelope Repairs - To repair exterior walls and waterproof balcony slabs for the North and East elevations of this existing 22-storey residential building on this site. Scope of work includes: - Repair concrete delamination and replace damaged windows - Remove mosaic tiles cladding - Paint all exterior surfaces - Apply new sealant around all windows and balcony doors. - Waterproof balconies - Replace all balcony guardrails - Remove balcony enclosure for suite #206 & 207. Building Review Branch Notes: - All new windows and doors to be no larger than the existing unprotected openings dimensioned at the site. - No landscape proposed; no electrical work proposed. - All colors and finishes to match existing. - Cleared for DB per Susan Chang. Revision#1 - Feb 22, 2018, J. Chen To expand the scope to include all elevations for guardrail replacement and removal of mosaic tiles, and parking (painting only).
Multiple Dwelling
$1,865,000
Feb 16, 2017
DB-2017-00336