




Subject: $1,798,000 · $1,301/sqft
$1,798,000
$1,798,000
Current Price
$1,898,000
Listed At · Jun 10, 2025
Disclosure indicates flood plain — check insurance availability and municipal flood maps.
Welcome to YACHT HARBOUR POINTE One of the ,Most prestigious boutique buildings, Rare waterfront corner suite with 2 beds + den, 2 baths, and unobstructed False Creek & Granville Island views. Renovated with granite counters, stainless steel appliances, and a custom den. Enjoy a private covered Balcony, resort-style amenities, and exclusive access to marina slips (up to 40 ft) in the building at below-market rates—perfect for boat lovers. Steps from seawall, Aquabus & Granville Island. Includes 2 parking & locker. Move-in ready
MLS #
R3013482
Status
Canceled
Type
Residential
Sub-type
Apartment/Condo
Ownership
Freehold Strata
Zoning
BCPED
Bedrooms
2
Full Baths
2
Half Baths
0
Kitchens
1
Fireplaces
1
Living Area
1,382 sqft
Main Floor
1,382 sqft
Stories
10
Year Built
1995
Age
30 years
Construction
Brick, Concrete, Brick (Exterior), Concrete (Exterior), Glass (Exterior)
Structure
Multi Family, Residential Attached
Parking Stalls
2
Parking Type
Additional Parking, Garage Under Building, Guest, Front Access, Concrete
Facing
Southwest
Original Price
$1,898,000
Strata Fee
$1,357.93/mo
Taxes
$4,959.82/yr
Listed
2025-06-10
MLS Area
Yaletown
City
Vancouver
Postal Code
V6Z 2S4
Subdivision
Yacht Harbour Pointe
Heating
Natural Gas · Radiant
Flooring
Hardwood · Tile
Appliances
Washer/Dryer · Dishwasher · Refrigerator · Stove · Microwave
Laundry
In Unit
Fireplace
Gas
Security
Smoke Detector(s) · Fire Sprinkler System
Windows
Window Coverings
Interior Features
Elevator · Storage · Pantry
Exterior Features
Garden · Balcony
Pets
Cats OK, Dogs OK, Yes With Restrictions
Restrictions
Pets Allowed w/Rest.,Rentals Allowed,Rentals Allwd w/Restrctns
Strata Mgmt Co.
associa
Strata Mgmt Phone
604-591-6060
Transit
1 BLK
Schools
CLOS
View
GRANVILLE ISLAND, FALSE CREEK
Lot Features
Central Location, Marina Nearby
Water Source
Public
Sewer
Public Sewer
Utilities
Electricity Connected, Natural Gas Connected, Water Connected
Accessibility
Wheelchair Access
Community
Shopping Nearby
Building Amenities
Bike Room · Exercise Centre · Recreation Facilities · Concierge · Trash · Maintenance Grounds · Gas · Hot Water · Snow Removal · Water
Property Disclosure
Yes
Coordinates: 49.274454, -123.133446 · Map data © Google
Listed by Plan A Real Estate Services
Source: City of Vancouver Open Data
Direct to Inspections - Addition / Alteration - Interior alterations to provide residential improvement to an existing dwelling unit at #205 - 1600 Hornby St. on the second floor of this existing mixed use building on the site. Okay for DTI per A. Best October 31, 2025
Multiple Dwelling
$70,000
Feb 26, 2026
BP-2025-04629
Direct to Inspections - Addition / Alteration - Interior alterations to provide residential improvement to an existing dwelling unit at #902 - 1600 Hornby St. on the ninth floor of this existing multiple dwelling building on the site. Okay for DTI per A. Best January 19, 2026
Multiple Dwelling
$35,000
Jan 21, 2026
BP-2026-00210
Direct to Inspections - Addition / Alteration - Interior alterations to renovate this existing dwelling unit #604 on the 6th floor of this existing multiple dwelling building on this site. To change the contractor from Euro Studio Ltd to Kaizen Renovations Corp. April 3, 2025 (EV) OK to process as DTI as per J. Zhang March 10, 2025
Multiple Dwelling
$175,000
Mar 12, 2025
BP-2025-01099
Direct to Inspections - Addition / Alteration - Unit 807 Interior alterations to renovate this unit #807 on the 8th floor of this existing Multiple Dwelling building on this site. OK for DTI per Jamie Z
Multiple Dwelling
$500,000
Sep 3, 2024
BP-2024-03212
Field Review - Addition / Alteration - #404 Interior alterations to this existing dwelling unit to provide tenant improvements and do layout changes. Scope of work: Floor removal, kitchen cabinet removal, removing den wall to create open kitchen space , Guest bathroom tub to be waterproofed, adding a tub filler. New appliances in kitchen, new pot lighting kitchen, new hardwood and paint. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. E2 Appliance upgrades, Fridge and Dishwasher DBI to determine if sprinkler permit is required.
Multiple Dwelling
$150,000
Aug 13, 2021
BP-2021-04120
Field Review - Addition / Alteration - #503 - Exterior alterations to provide improvements by installing heap pump unit on the balcony of the existing dwelling unit, #503 on the 5th floor in this Multiple Dwelling building on this site. Okay for field review as per E.Kai Apr 07/20 Notes: Energy Upgrade: Exempt - Heat pump installation Schedule B Architectural and Schedule D Building Envelope has been submitted by Brennan Vollering, M.A.Sc., P.Eng., LEED AP, Tel: 604 365-3664. Building Sprinklered – No sprinkler permit required.
Multiple Dwelling
$11,000
May 7, 2020
DB-2020-01243
Field Review - Addition / Alteration - #305 Interior alteration to provide upgrades to the kitchen and bathrooms and to provide a new pantry in this existing dwelling unit in this Yacht Harbour Pointe Multiple Dwelling building. OK for field review and the district building inspector is to determine if a sprinkler permit would be required as per Howie Chow, February 26, 2020. Scope of work includes relocating door and replacing fixtures in the main bathroom, reconfiguration of master bathroom and walk-in closet, reconfigure kitchen layout, new cabinets District Building Inspector to determine if a Structural Schedule B is required for removal of any wall. Energy Upgrade Selected: L2 - HVAC - Install timers (up to 60 miinute) or humidistat for washroom fans
Multiple Dwelling
$60,000
Apr 3, 2020
BP-2020-00730
Field Review - Addition / Alteration - #503 - 1600 Hornby St Interior alterations to provide improvements to dwelling unit #503 on the 5th floor of this multiple dwelling building on this site. Scope of work to install new shower stall and remove bathtub, add sink in laundry room, new cabinets in kitchen and bathroom, remove partial non load bearing wall and additional work related to electrical and and plumbing. OK for field review per W.Wong, March 4, 2020 Notes: 1. Building inspector determined no sprinkler permit required. 2. Energy Upgrade; L2 - SWH - Install low flow shower heads in all showers
Multiple Dwelling
$200,000
Apr 1, 2020
BP-2020-00837
Field Review - Addition / Alteration - #303 Interior alterations to provide a kitchen and ensuite renovation and to provide minor interior layout changes for unit #303 on the 3rd floor in this multiple dwelling building. L2 - Appliances - Upgrade to an Energuide/Energy Star appliance (fridge; dishwasher)
Multiple Dwelling
$200,000
Mar 1, 2018
BP-2017-06488
Field Review - Addition / Alteration - Exterior alterations to provide an A/C unit on the balcony of this existing dwelling unit in this existing multiple dwelling building. Ok for field review per L Clarke Feb 17/17 Energy upgrade exempt: Voluntary upgrade
Multiple Dwelling
$32,881
Mar 16, 2017
DB-2017-00928
Field Review - Addition / Alteration - Unit #802 Interior alterations to provide improvements to the kitchen and bathrooms in unit # 802 on the 8th floor of this existing residential/commercial building. Work to include removing non-load bearing walls between the kitchen and dining/living room and remove shower in the ensuite washroom to increase the walk-in closet. OK for field review as per J Phanthoupheng, Nov 22, 2016. L2 - HVAC - Replace gas fireplace with sealed combustion unit with electronic ignition - Energuide Rating 60 or greater
Multiple Dwelling
$130,000
Jan 18, 2017
BP-2016-03811