$1,168,000
Listed by: RE/MAX Westcoast · MLS®
Waterfront, FREEHOLD living in heart of False Creek: coveted "Island Cove" @ Granville Island's entrance. Spacious, 2-lvl, 1,310sf, 2-bdrm, 2-bath home w/loads of storage + 2 balconies. Well-maintained. Enjoy open-concept entertaining across kitchen/dining/living. Impress guests w/flr-to-ceiling, wall-to-wall windows leading to glass-railing balc'y & VIEW. Huge, primary bdrm feat's 4pc ensuite, private balc'y & 3 closets(!). 2 parking secured underground. Gym, meeting rm, & caretaker. Pro-active strata w/recent, comprehensive bldg envelope renewal: balconies, decks, curtain wall, & ext. coatings. Max 1 pet. Peak Vancouver lifestyle w/Granv-Isl’s restaurants, Public Market + theatres; walk-/run-/bik-ing paradise on False Creek Seawall; + hop over Granville St Brdg or Aquabus ride to dwntwn.
MLS® #
R3159346
Status
Active
Type
Residential
Sub-type
Apartment/Condo
Style
Reverse 2 Storey
Ownership
Freehold Strata
Bedrooms
2
Full Baths
2
Half Baths
0
Fireplaces
0
Living Area
1,310 sqft
Main Floor
1,005 sqft
Stories
8
Year Built
1989
Age
37 years
Structure
Multi Family, Residential Attached
Parking Stalls
2
Parking Type
Underground, Tandem, Side Access, Garage Door Opener
Strata Fee
$766.07/mo
Taxes
$3,760.88/yr
MLS® Area
False Creek
City
Vancouver
Postal Code
V6J 5C5
Subdivision
Island Cove
Heating
Baseboard · Electric
Appliances
Washer/Dryer · Dishwasher · Refrigerator · Stove
Security
Fire Sprinkler System
Interior Features
Elevator
Exterior Features
Balcony
Pets
Cats OK, Dogs OK, Number Limit (One), Yes With Restrictions
View
False Creek, mtns, & lagoon
Lot Features
Central Location, Marina Nearby, Recreation Nearby
Community
Shopping Nearby
Building Amenities
Exercise Centre · Caretaker · Trash · Maintenance Grounds · Management · Recreation Facilities · Sewer · Snow Removal · Water
Coordinates: 49.269675, -123.138465 · Map data © Google
Source: City of Vancouver Open Data
Field Review - Addition / Alteration - #209 Interior alterations to provide improvement to this existing dwelling unit #209 in this existing multiple dwelling building on site. Scope of work includes expanding the storage room and removing the office to expand the kitchen. OK For Field Review per Kim V - Nov 25/21 NOTES: ~ Energy Upgrades: E2 - Lighting - Install energy efficient lighting fixtures (single occupied space area) E2 - Lighting - Install lighting dimmer, timers, and/or motion detectors on interior lights E2 - Appliances - Upgrade to an Energuide/Energy Star appliance (fridge, dishwasher) ~ This building is sprinklered. DBI to determine on site if a separate sprinkler permit is required.
Multiple Dwelling
$127,000
Jan 13, 2022
BP-2021-06193
High Density Housing / Commercial - Addition / Alteration - To provide exterior alterations for building envelope repair due to water ingress on the south & north elevations and targeted areas envelope repair on the east & west elevations of this existing 8-storey residential building. Scope of works: North elevation - Deck & balcony membrane repair. - Replace existing guards at balconies to aluminum guard w/ glass in-fill. - Paint/ cleaning the existing stucco and brick veneer facade. South elevation - Remove existing glass blocks on the 7 & 8 floor and replace with new curtain wall glazing system. - Remove existing brick veneer cladding between the curtain wall glazing on the 7 & 8 floor with new exterior insulated metal panel. - Deck & balcony membrane repair - Replace existing guards at balconies to aluminum guard w/ glass in-fill. - Paint/ cleaning the existing stucco and brick veneer facade. East elevation - Remove existing glass blocks and replace with new. - Remove existing brick veneer cladding above the parkade entry and replace with new. - Re & re two existing fabric awnings on the 8th floor. West elevation - Paint/ cleaning the existing stucco and brick veneer facade. ******THIS PERMIT HAS BEEN ISSUED UNDER THE REQUIREMENTS OF VBBL 2019 AND REVIEWED DURING THE 2020 COVID-19 PANDEMIC CRISIS. ******** Building Review Branch Notes: 1. No ground disturbance. 2. Sch-A, Schedule B - Arch & Struct. and Schedule D-1 are submitted. 3. New curtain wall glazing cleared by POD, Hamed Ghasemi on Jan 31, 2020. Ok for DB per Lee Telefson. 4. Existing skylights to be remained with new sealants only. 5. Project value for new awnings is $10,000.
Multiple Dwelling
$1,070,000
Sep 21, 2020
DB-2020-00979
Field Review - Addition / Alteration - #759 Interior and exterior alterations to renovate this dwelling unit #759 on the 7th floor of this existing multiple dwelling building on this site. Exterior alterations to install a heat pump on the roof. Letters of assurance rcvd T. Lam 604.255.7670 (structural) Energy Upgrade Selected: L2 - SWH - Install efficient electric water heater (Energy Factor (EF) of .93 or higher) OK for DB per M. Angel Castillo Urena, June 29, 2018. OK for field review per E.Zienty, June 29, 2018. Note: 1. No Soil disturbance allowed. 2. Energy trigger chosen; L2 - SWH - Install efficient electric water heater (Energy Factor (EF) of .93 or higher)
Multiple Dwelling
$75,000
Aug 9, 2018
DB-2018-03528