




$688,000
Listed by: Pospischil Realty Group · MLS®
FABULOUS KERRISDALE LOCATION! Bright, sunny SOUTH-facing suite in a well-maintained CONCRETE co-op building just steps to Kerrisdale Village! Beautiful narrow-plank hardwood floors, warm natural light and a wonderful floor plan. Fully renovated kitchen (2006) with granite counters, stainless appliances and coffered ceilings. Extensive building upgrades inc elevator, parkade membrane, boiler, plumbing, roof, balcony membranes and common areas. Enjoy the OUTDOOR POOL, rooftop deck and FREE shared laundry just steps from your door! Secure parking #47 & locker #502 (on P1). Monthly fees INCLUDE PROPERTY TAXES, HEAT, HOT WATER & MANAGEMENT! More photos online & join us at our Live Stream broadcast on our FB page: Thu Oct 15th(5pm), private showings by appt only Fri,Sat,Sun Oct 16-18th (2-4 PM).
MLS® #
R3174619
Status
Active
Type
Residential
Sub-type
Apartment/Condo
Ownership
Shares in Co-operative
Bedrooms
2
Full Baths
2
Half Baths
0
Living Area
1,041 sqft
Main Floor
1,041 sqft
Stories
8
Year Built
1964
Age
62 years
Structure
Multi Family, Residential Attached
Parking Stalls
1
Parking Type
Underground, Lane Access, Asphalt
Strata Fee
$912/mo
MLS® Area
Kerrisdale
City
Vancouver
Postal Code
V6M 2E6
Subdivision
Balsam Court
Heating
Baseboard · Hot Water
Appliances
Dishwasher · Refrigerator · Stove
Laundry
Common Area
Interior Features
Elevator · Storage
Exterior Features
Balcony
Pets
No Cats, No Dogs, No
View
Views to South!
Lot Features
Central Location, Lane Access, Recreation Nearby
Accessibility
Wheelchair Access
Pool
Outdoor Pool
Community
Shopping Nearby
Building Amenities
Trash · Maintenance Grounds · Heat · Hot Water · Management · Sewer · Snow Removal · Taxes · Water
Coordinates: 49.233189, -123.161767 · Map data © Google
Watch this home
Get an email when the price changes, it sells, or a new unit lists in this building. Sign in or create a free account.
Source: City of Vancouver Open Data
Field Review - Addition / Alteration - #301 - Interior alterations to provide kitchen improvements to this existing dwelling unit, #301 on the 3rd floor in this existing 8 storey, Multiple Dwelling building on this site. Scope of work includes: alterations to remove kitchen walls, millwork, flooring and finishes; new kitchen wall, millwork, plumbing fixtures, appliances, floors, lighting and paint. OK for Field review per Rosa Astorino, March 26, 2021. Notes: ~ Energy Upgrade: L2 - Appliances - Upgrade to an Energuide/Energy Star appliance (fridge; dishwasher). ~ District Building Inspector to determine on site if removal of wall(s) requires a Structural Engineer. ~ Building Not Sprinklered – No sprinkler permit required. ~ Hazmat report submitted by Qualified Professional, John Shaw of Sure Hazmat and Testing.
Multiple Dwelling
$15,000
Jun 30, 2021
BP-2021-01012
Field Review - Addition / Alteration - #303 - 3rd floor Interior alterations to provide improvements in unit #303 to do bathroom and kitchen renovation in this existing multiple dwelling building on this site. Relocation of bedroom door, alterations to provide a pantry in the kitchen. remove bathtub and surround, install new tub and wall tiles with new waterproofing and fixtures. OK for Field Review per Kim v - Jan 19/21 Energy upgrade - E2-Appliances- Upgrade to an Energuide/Energy Star appliance (washer,dryer)
Multiple Dwelling
$7,800
Mar 10, 2021
BP-2021-00183
Enquiry Centre - Addition / Alteration - Interior alterations to replace domestic waterpiping, provide firestopping, and repair walls in conjunction with repiping in all of the 44 units in this existing 8-storey multiple dwelling building on this site. Plumbing Schedule B submitted by Ali Karimi, P. Eng., 604.255.0992 ext. 203 OK for SIPS processing as per H. Chow, November 13, 2018. Related to PP-2018-05082 Note: 1. Energy Upgrade Exempt - Repiping
Multiple Dwelling
$220,000
Nov 23, 2018
BP-2018-05876
Field Review - Addition / Alteration - #403 Interior alterations to renovate the kitchen at dwelling unit #403 on the 4th floor of this existing multiple dwelling building on this site. Work to remove the wall between the kitchen and corridor, and replace old kitchen cabinets with new cabinets. OK for field review per W.Wong, February 14, 2018. Note: Energy trigger chosen; L2 - HVAC - Install timers (up to 60 minute), or humidistat for laundry room fan
Multiple Dwelling
$25,000
Apr 5, 2018
BP-2018-00779
Field Review - Addition / Alteration - (#501) Interior alteration to remove a partition wall between kitchen and the living room on the 5th floor of this existing mixed use building on this site. Note: DBI to determine if schedule B (Structural) is required. Okay for field review as per E.Kai Dec20/16 Energy Upgrade: Install timers (up to 60 minute), or humidistat for washroom fan(s)
Multiple Dwelling
$25,000
Feb 7, 2017
BP-2016-04482