




$499,900
Listed by: Sutton Group - 1st West Realty · MLS®
NEW PRICE. NEW HOME. NEW OPPORTUNITY. Move-in ready at THESIS. Built by an award winning premier builder Alabaster Homes, in collaboration Yamamoto Architecture & Studio Roslyn, invites you to experience this thoughtfully designed Jr. 1 Bed home. Efficient open-concept layout, versatile work-from-home space, and stunning North Shore mountain views. Premium Italian cabinetry by Inform, integrated appliances, 9 ft ceilings, A/C, rooftop indoor and outdoor lounge, and co-work studio. Located in the heart of Oakridge, steps from Langara College, Canada Line SkyTrain, parks, and within walking distance to Oakridge Park, Vancouver's premier cultural, retail, and dining destination. Parking included for a limited time. GST applicable.
MLS® #
R3165974
Status
Active
Type
Residential
Sub-type
Apartment/Condo
Ownership
Freehold Strata
Bedrooms
1
Full Baths
1
Half Baths
0
Fireplaces
0
Living Area
478 sqft
Main Floor
478 sqft
Stories
5
Year Built
2026
Structure
Multi Family, Residential Attached
Parking Stalls
1
Parking Type
Underground, Lane Access, Rear Access, Garage Door Opener
MLS® Area
Oakridge VW
City
Vancouver
Postal Code
V5Z 2S3
Heating
Forced Air · Heat Pump
Cooling / A/C
Central Air · Air Conditioning
Appliances
Washer/Dryer · Dishwasher · Refrigerator · Stove · Microwave · Oven · Range Top
Laundry
In Unit
Security
Fire Sprinkler System
Windows
Window Coverings
Interior Features
Elevator · Storage
Exterior Features
Playground
Pets
Cats OK, Dogs OK, Number Limit (Two), Yes
View
city & mountain views
Lot Features
Central Location, Near Golf Course, Greenbelt, Private, Recreation Nearby
Accessibility
Wheelchair Access
Community
Shopping Nearby
Building Amenities
Bike Room · Clubhouse · Snow Removal
Coordinates: 49.226071, -123.109104 · Map data © Google
Watch this home
Get an email when the price changes, it sells, or a new unit lists in this building. Sign in or create a free account.
Strata fee / sqft (median)
$0.64/mo
19% above area median
Year built
2026
Listings on record
3
3 active now
Rules
Pets: Cats OK, Dogs OK, Number Limit (Two), Yes
Sale prices, sale-to-list ratio and time to sell for this building are available to registered users. Create a free account or sign in.
Based on MLS® listings at this address and active strata listings in the area. Keyword flags come from public listing remarks and aren’t a substitute for strata minutes, the depreciation report or a Form B.
Transit-Oriented Area — Tier 3
~540 m from Langara — 49th Avenue SkyTrain station
Provincial law requires the city to allow at least 3.0 FAR and 8 storeys for residential here — well above typical single-family zoning. Potential land-assembly interest from developers.
~540 m straight-line to Langara — 49th Avenue SkyTrain
Screening estimate from provincial regulations (TOA station points, B.C. Reg. 263/2023 & 265/2023; small-scale multi-unit housing rules). Distances are straight-line; actual TOA maps are set by municipal bylaw and some parcels (heritage, ALR, exempt areas) are excluded. Confirm with the municipality before relying on it.
Source: City of Vancouver Open Data
Certified Professional Program - New Building - To construct a six-storey (five-storey)* mixed-use building with commercial units and offices on the first two levels, residential units on Levels 3-5, and indoor and outdoor amenities on the Roof Level. The building will be constructed over two levels of underground parkade. The below-grade and commercial levels will be of noncombustible construction, and residential and amenity levels will be of combustible construction consist of 69 strata-titled dwelling units. The building will be sprinklered throughout and provided with a monitored fire alarm system. *An AL to address the height of this building to a Five-Storey building. VBBL2019 - NFPA 13 - with Radio Antenna. Notes: 1. Only three Retail CRUs are permitted to be tenanted as a Restaurant or Retail Limited Food with Class 1 cooking in the future. 2. Pre-shaft: Three 1 hr vertical shafts with 2 hr fire barrier wrapped kitchen exhaust duct will be installed adjacent to CRU #3 & #4 and within CRU#12. Stage 1 - Excavation and Shoring issued on Sept. 26, 2023. Stage 2 - Foundation and grade including the vehicle ramp cover which is above grade of non-comb construction issued on Jan 24, 2024. Stage 3 - Full Construction issued on May 8, 2024. Revision #1 - (Mar 16, 2026) - To change the Mechanical Engineer from John Burke (Outgoing - June 30, 2025) to Jamie Watson (Incoming - June 30th, 2025).
Multiple Dwelling
$31,400,000
May 8, 2024
BP-2023-00094