$1,598,000
Listed by: Metro Edge Realty · MLS®
An upgraded, stunning modern one-bedroom loft with ocean views & A/C at Cascina. A rare gem in the heart of Coal Harbour, boasting soaring double-height ceiling, impressive open space ideal for entertaining, beautiful views of ocean, mountains, Stanley Park & marina, perfectly blending luxury & comfort. Upgrades incl. engineering h/w floor, hood fan, backsplash, dishwasher, refinished cabinets, Bosch washer & dryer, walk-in closet, lighting fixtures, motorized shades in the primary bedroom. Elevator access to the 2nd floor. (The 2nd bedroom refers to the flex room/space on the 2nd floor.) Meticulously maintained, ready to move in. Resort-style amenities: 3 elevators, 24/7 concierge, indoor pool, hot tub, gym, sauna, steam, party rm, library, theatre, etc.
MLS® #
R3149538
Status
Active
Type
Residential
Sub-type
Apartment/Condo
Ownership
Freehold Strata
Bedrooms
2
Full Baths
2
Half Baths
0
Fireplaces
1
Living Area
1,211 sqft
Main Floor
677 sqft
Year Built
2004
Age
22 years
Structure
Multi Family, Residential Attached
Parking Stalls
1
Garage Spaces
1
Parking Type
Garage Single, Open
Strata Fee
$1,133.42/mo
Taxes
$4,842.69/yr
MLS® Area
Coal Harbour
City
Vancouver
Postal Code
V6G 3J8
Subdivision
Cascina
Heating
Heat Pump
Cooling / A/C
Air Conditioning
Appliances
Washer/Dryer · Dishwasher · Refrigerator · Stove
Laundry
In Unit
Fireplace
Gas
Windows
Window Coverings
Interior Features
Elevator
Exterior Features
Garden · Balcony · Private Yard
Pets
Yes With Restrictions
View
Ocean, Habour, Mountain, City
Lot Features
Central Location, Recreation Nearby
Pool
Indoor
Community
Shopping Nearby
Building Amenities
Exercise Centre · Sauna/Steam Room · Concierge · Trash · Gas · Hot Water · Management
Coordinates: 49.290568, -123.127680 · Map data © Google
1 bd · 1 ba · 808 sqft
MLS® R3116971 · Macdonald Realty
$945,000
Source: City of Vancouver Open Data
Direct to Inspections - Addition / Alteration - Interior alterations to provide residential improvements to unit 2400 on the 24th floor of this existing multiple dwelling building on this site. Scope of work: Primary Bedroom bathroom renovation, updated bar counter in Living Room, new millwork, finishes, flooring, painting, electrical and plumbing to suit. Revison#1: Ensuite renovation removed from scope of work. December 1, 2025 (EV) Okay for DTI per J. Kuhleitner April 15, 2025
Multiple Dwelling
$150,000
Apr 16, 2025
BP-2025-01781
Direct to Inspections - Addition / Alteration - Interior alterations to renovate the kitchen area on the lower level of this townhouse unit #204 in this existing Multiple Dwelling building on this site. OK to process as DTI as per J. Zhang April 2, 2024
Multiple Dwelling
$15,000
Apr 4, 2024
BP-2024-01152
Direct to Inspections - Addition / Alteration - #1301 Interior alterations to provide improvements to dwelling unit #1301 on the 13th floor of this multiple dwelling building on this site. REVISION#1: Ensuite bathroom alteration includes: new waterproofing, fixtures, pot lights, vanity, mirrors, tiles, tub surround and shower surround. Increase the project value of work from $150,000 to $200,000 (added $50,000). (EV) November 3, 2023 OK for DTI per W. Wong August 3, 2023
Multiple Dwelling
$200,000
Aug 14, 2023
BP-2023-02798
Field Review - Addition / Alteration - #807 - 8th floor Per the 2019 VBBL, to provide interior alterations to residential unit #807 on the 8th floor of this existing multiple dwelling building on this site. Scope of work to include: remove partition walls and doors, new partition walls and doors, kitchen and bathroom updates, fireplace updates, and electrical and plumbing work. OK for field review as per C.Yue on Jan 14/20 Selected Energy Upgrade: L2 - Lighting - Install energy efficient lighting fixtures (single occupied space area) NOTE: 1. Building sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. 2. DBI to determine if P.Eng required to remove walls.
Multiple Dwelling
$65,000
Feb 6, 2020
BP-2020-00143
Field Review - Addition / Alteration - #904 - Interior alteration to provide residential unit improvements to suite #904 on the 9th floor of this existing mixed-use building on this site. Scope of work includes: kitchen and bathroom updates, fireplace updates, and electrical and plumbing work. Note: Enclosed balcony is to be retained including tiled floor (impervious) and doors to the enclosed balcony to maximize glass area to admit natural light to the interior space beyond. Okay for field review per M. Lee Selected Energy Upgrade: L2 - SWH - Install low flow shower heads in all showers
Multiple Dwelling
$40,000
Sep 18, 2018
BP-2018-04464