




Subject: $779,000 · $893/sqft
$779,000
$779,000
Current Price
$788,000
Listed At · May 20, 2025
Welcome to King Edward Village. 872 sqft 2 beds, 2 full baths + Den(can be used as 3rd bedroom) + Flex Space (storage/office). Home is in good condition just need a new coat of pant. Featuring granite countertops, stainless steel appliances and laminate flooring throughout the living area. Solid concrete building Steps away from Price Smart foods, library, banks, restaurants, Canada service office and much more. Unit come with 1 parking and 1 locker. West facing Knight Street. Easy access bus Downtown, Metrotown, and Richmond. Rental and pets are allowed. OPEN HOUSE July 13. 2-4 pm
MLS #
R3005258
Status
Expired
Type
Residential
Sub-type
Apartment/Condo
Ownership
Freehold Strata
Zoning
MF
Bedrooms
3
Full Baths
2
Half Baths
0
Kitchens
1
Fireplaces
0
Living Area
872 sqft
Main Floor
872 sqft
Stories
17
Year Built
2008
Age
18 years
Roof
Asphalt, Torch-On
Construction
Concrete, Brick (Exterior), Stucco
Structure
Multi Family, Residential Attached
Parking Stalls
1
Parking Type
Garage Under Building
Facing
West
Original Price
$788,000
Strata Fee
$540/mo
Taxes
$2,125.21/yr
Listed
2025-05-20
MLS Area
Knight
City
Vancouver
Postal Code
V5N 5Y8
Heating
Baseboard · Electric
Flooring
Laminate · Carpet
Appliances
Washer/Dryer · Dishwasher · Refrigerator · Stove
Interior Features
Elevator
Exterior Features
No Outdoor Area
Total Units
403
Pets
Number Limit (Two), Yes With Restrictions
Restrictions
Pets Allowed w/Rest.,Rentals Allowed
Strata Mgmt Co.
RANCHO
Strata Mgmt Phone
604-684-4508
View
DOWNTOWN AND MOUNTAIN
Water Source
Public
Sewer
Public Sewer, Sanitary Sewer, Storm Sewer
Utilities
Electricity Connected, Water Connected
Community
Shopping Nearby
Building Amenities
Exercise Centre · Maintenance Grounds
Property Disclosure
No
Coordinates: 49.249528, -123.075846 · Map data © Google
1 bd · 1 ba · 508 sqft
$499,900
Listed by Nu Stream Realty Inc.
Source: City of Vancouver Open Data
Direct to Inspections - Addition / Alteration - #1104 Interior alterations to replace bathtub with shower in the guest bathroom at dwelling unit #1104 on the 11th floor of this multiple dwelling building on this site. OK for DTI per W. Wong November 14, 2024
Multiple Dwelling
$3,000
Nov 15, 2024
BP-2024-04487
Direct to Inspections - Addition / Alteration - #302 - 4028 KNIGHT ST Interior alterations to create additional bedroom in unit #302 of existing mixed-use building on this site. Scope of work to include construction of a partition wall in existing living area to create new bedroom. Ok for DTI per S. Jordan March 26, 2024
Multiple Dwelling
$5,000
Apr 3, 2024
BP-2024-01062
Field Review - Addition / Alteration - #320-3rd Floor Interior alterations to this existing dwelling unit (#320) in this existing mixed use building. E2 - Lighting - Install lighting dimmer, timers, and/or motion detectors on interior lights Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. A Sprinkler permit may be required, as determined by the District Building Inspector. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Multiple Dwelling
$10,000
Nov 1, 2021
BP-2021-05055
Enquiry Centre - Addition / Alteration - Exterior alterations only to provide for the installation of five (5) new antennas, and to relocate two (2) antennas at the rooftop of this existing mixed-use commercial and residential building for Freedom Mobile. Exterior alterations for new and relocated antennas supported by planner Benjamin Dufix, August 11, 2020. OK for SIPS processing as per Howie Chow, August 11, 2020. Schedule A, Schedule B Architectural & Structural submitted per Rafal Puszynski, 778-300-1233 ext 303 Schedule B Electrical submitted per Marcin Puszynski, 778-300-1233 Ext 303 Note: It is the responsibility of the Applicant/Owner to call for a final inspection once the Schedule C-A and C-B (Letters of Assurance) are received as per the District Building Inspector.
Multiple Dwelling
$150,000
Aug 27, 2020
DB-2020-02444