




Subject: $3,850,000 · $1,839/sqft
$3,850,000
Stunning waterfront Penthouse at Quaywest with over 2093 sq ft of luxury living space. Featuring floor-to-ceiling window frames and breath-taking views of False Creek, city line and north shore mountains. Enjoy the magnificent lifestyle Yaletown has to offer! The expansive 1,337 sq ft private patio with panoramic views is well suited for hosting intimate events and entertaining guests. Thoughtfully designed with elegant finishes, the home comes with A/C, 2 parking stalls, and ample storage. A 3rd bedroom can be added with light reno. Full-service amenities—concierge, indoor pool, gym, sauna, and more. Steps to the Seawall and world-class dining, this penthouse is a redefinition of luxury living in Vancouver.
MLS #
R3014611
Status
Expired
Type
Residential
Sub-type
Apartment/Condo
Style
Penthouse
Ownership
Freehold Strata
Zoning
CD 1
Bedrooms
2
Full Baths
2
Half Baths
1
Kitchens
1
Fireplaces
1
Living Area
2,093 sqft
Main Floor
2,093 sqft
Stories
39
Year Built
2002
Age
24 years
Roof
Other
Construction
Concrete, Concrete (Exterior), Glass (Exterior), Other (Exterior)
Structure
Multi Family, Residential Attached
Parking Stalls
2
Parking Type
Garage Under Building
Original Price
$3,850,000
Strata Fee
$1,756.07/mo
Taxes
$10,762.6/yr
Listed
2025-06-10
MLS Area
Yaletown
City
Vancouver
Postal Code
V6Z 3A3
Heating
Electric
Cooling / A/C
Air Conditioning
Flooring
Hardwood · Mixed
Appliances
Washer/Dryer · Dishwasher · Refrigerator · Stove
Laundry
In Unit
Fireplace
Gas
Patio / Porch
Rooftop Deck
Interior Features
Storage
Exterior Features
Balcony
Pets
Yes With Restrictions
Restrictions
Pets Allowed w/Rest.,Rentals Allwd w/Restrctns
Strata Mgmt Co.
First Service Residential
Transit
Near
Schools
Near
View
Water, City and Mountains
Lot Features
Central Location, Marina Nearby, Recreation Nearby
Water Source
Public
Sewer
Public Sewer, Sanitary Sewer, Storm Sewer
Utilities
Electricity Connected, Water Connected
Pool
Indoor
Community
Shopping Nearby
Building Amenities
Bike Room · Trash · Maintenance Grounds · Management · Recreation Facilities · Sewer · Snow Removal
Property Disclosure
Yes
Coordinates: 49.273436, -123.116467 · Map data © Google
$738,000
Listed by Plan A Real Estate Services
Source: City of Vancouver Open Data
Direct to Inspections - Addition / Alteration - #1705 Interior alterations to renovate this dwelling unit #1705 on the 17th floor of this existing Multiple Dwelling Building on this site. OK to process as DTI as per J. Zhang August 23, 2023
Multiple Dwelling
$125,000
Aug 30, 2023
BP-2023-03023
Field Review - Addition / Alteration - #3807 Interior alterations to provide residential tenant improvements to #3807 on the 38th level of this existing multiple dwelling building on the site. Note: separate mechanical permit is required for the installation of the heat pump. OK for field Review as per S. Yu on March 27, 2023
Multiple Dwelling
$425,000
Apr 20, 2023
BP-2023-01127
Field Review - Addition / Alteration - #2002 Exterior and interior alterations to provide improvements to dwelling unit #2002 on the 20th floor of this multiple dwelling building on this site. Exterior work to add a heat pump on the balcony. OK for DB per K.Kallweit-Graham OK for Field Review per W.Wong Letters of Assurance rec'd: Schedule B Architect & Schedule D submitted as per Andrew Terrett, 604-736-3730 Energy Upgrade: L2 - HVAC - Install timers (up to 60 minute), or humidistat for washroom fan(s) Note: A/C unit to conform to City of Vancouver Noise By-Law. Noise emanating from mechanical equipment (e.g., air conditioning units, exhaust equipment, generators, etc.) is required to conform to Vancouver By-law No. 6555 regulating Noise or Sound. (Note: Air conditioning units are not to exceed a noise level of 55 db during the daytime and 45 db at night.)
Multiple Dwelling
$25,000
May 12, 2022
DB-2022-01702
Field Review - Addition / Alteration - #3306 Exterior and interior alterations to provide improvements to this dwelling unit #3306 on the 33rd floor of this multiple dwelling building on this site. Scope of work: Partial deconstruction of interior walls in kitchen. Demise portion of enclosed balcony wall to create doorway. Remove doors from enclosed balcony and replace with matching walls. Exterior alterations to add a heat pump on the balcony. Plumbing and electrical not to be altered. Ok for field review per Bryan T. May 18, 2021 No sprinkler permit required per DBI. Architectural Schedule B and Schedule D submitted by Brennan Vollering, P. Eng, 604.365.3664
Multiple Dwelling
$80,000
Aug 3, 2021
DB-2021-01643
Field Review - Addition / Alteration - #3902 Interior alterations to provide improvements for the existing dwelling unit #3902 on the 39th floor of this multiple dwelling building on this site. Scope of work to include: Upgrades to the kitchen: remove a wall, relocate the sink, stove & refrigerator, extend drop ceiling, install new cabinetry & counter tops and replace all appliances Upgrades to the bathrooms: replace toilets, bathtubs & tiling, vanities, sinks and countertops Other: relocate laundry closet, replace gas fireplace and flooring & lighting through out. Ok for field review as per K Vogt Jan 27, 2021 Notes: - DBI to determine on site if Structural drawings and schedule are required - Sprinkler Permit is required - Energy Upgrade: L2 - Lighting - Install lighting dimmer, timers, and/or motion detectors on interior lights
Multiple Dwelling
$110,000
Mar 3, 2021
BP-2021-00296
Field Review - Addition / Alteration - #1907 Exterior and interior alterations to provide improvements to this dwelling unit #1907 on the 19th floor of this multiple dwelling building on this site. Exterior alterations to add a heat pump on the balcony. Scope of work: - Update bathrooms and kitchen, interior doors, plumbing fixtures and Electrical work, new flooring - New A/C on balcony OK for DB per H.Shayan, December 21, 2020 OK for Field Review per W.Wong, December 21, 2020 Sprinkler permit required Letter of Assurance Rec'd: Schedule B Architectural & Schedule D submitted per Brian Billingsley, 604-714-1633 Energy Upgrade: L2 - HVAC - Install programmable thermostats with nighttime setback and switch for heating system Note: A/C unit to conform to City of Vancouver Noise By-Law. (The sound level of the mechanical equipment shall comply with the Noise Control By-law #6555.) Noise emanating from mechanical equipment (e.g., air conditioning units, exhaust equipment, generators, etc.) is required to conform to Vancouver By-law No. 6555 regulating Noise or Sound. (Note: Air conditioning units are not to exceed a noise level of 55 db during the daytime and 45 db at night.)
Multiple Dwelling
$150,000
Feb 2, 2021
DB-2020-04046
Field Review - Addition / Alteration - #3801 - Exterior and interior alterations to add A/C unit to balcony and to provide updates to the existing dwelling unit at #3801 on the 38th level in this existing Multiple dwelling building (Quaywest) on this site. Scope of work includes: Exterior - installation of A/C unit on the balcony; Interior - demo interior walls, doors, drop ceiling; install new bathroom fixtures, millwork; expand kitchen into a portion of the enclosed balcony, new appliances, doors, fixtures, millwork, drop ceiling; new electric fireplace, hardwood floors, baseboards; motorized blinds, valance, lighting, paint and finishes throughout. Enclosed Balcony and Bulk Storage to Remain Ok For Field Review per A.Campbell - Nov.23.2020 OK For New A/C Unit on Exterior Balcony as per A.Wroblewski Notes: ~ Energy Upgrade: L2 - Appliances - Upgrade to an Energuide/Energy Star appliance (washer; dryer) ~ Schedule B Architectural (HVAC ENVELOPE PENETRATION ONLY) and Schedule D Building Envelope submitted by Andrew Terrett of ATA Architectural Design Ltd., Tel: 604 736-3730. ~ Building Sprinklered – separate sprinkler permit is required. ~ District Building Inspector to determine on site if removal of wall between kitchen and enclosed balcony requires Structural Schedule B.
Multiple Dwelling
$75,000
Jan 14, 2021
DB-2020-03683
Field Review - Addition / Alteration - #301 - Per the 2019 VBBL, to provide interior alterations to unit #301 on the 3rd floor of this existing multiple dwelling building on site. Scope of work includes : remove partition walls and doors, new partition walls and doors, washrooms and kitchen update, and electrical, gas, and plumbing work. OK for field review as per C.Yue on Nov 4/19 Selected Energy Upgrade: L2 - Appliances - Upgrade to an Energuide/Energy Star appliance (fridge; dishwasher) NOTE: Building sprinklered
Multiple Dwelling
$200,000
May 29, 2020
BP-2019-05074
Field Review - Addition / Alteration - #2907 Interior alterations only to provide improvements to this existing residential dwelling unit #2907 at this existing Multiple Dwelling building. Scope of work: New interior layout, doors, millwork; new kitchen & bathroom layout; demo & install interior walls; new plumbing fixtures & EL lighting; new A/C in storage room & condenser in the patio. OK for exterior alterations to install condenser unit on open balcony as per Haizea Aguirre, May 28, 2019. OK for field review as per Howie Chow, May 10, 2019.
Multiple Dwelling
$105,000
Jun 25, 2019
DB-2019-02042
Field Review - Addition / Alteration - Interior alterations to provide improvements to this dwelling unit #2105 on the 21st floor in this existing multiple dwelling building on this site. Scope of work: Update kitchen include raise the ceiling and remove wall; bathroom update and new plumbing fixtures; new flooring & carpet. OK for field review as per Jamie Zhang, May 28/19 Energy Upgrade: L2 - Appliances - Upgrade to an Energuide/Energy Star appliance (fridge; dishwasher)
Multiple Dwelling
$25,000
Jun 25, 2019
BP-2019-02302
Field Review - Addition / Alteration - #1201 Interior alterations to provide fire repair to this unit #1201 in this existing multiple dwelling building. Work includes: Replacement of interior finishes, fixtures, and damaged glazing units. No modifications to existing layout and no exterior work. Letters of assurance rcvd Tony Osborn 604.363.3790 (architectural) Energy Upgrade Exemption: Repair due to fire. OK for field review as per Eun Jeon
Multiple Dwelling
$30,000
Aug 10, 2018
BP-2018-03595
High Density Housing / Commercial - Addition / Alteration - #3807 To provide interior alteration for suite #3807 in this 33 storey multi-unit residential building on this site. Notes: - Scope of work includes combining two existing enclosed balconies into one at the east corner. Okay per POD, Georgina Lyons. - Combining suite #3806 and #3807 was under DB446885. - Contractor shall have a valid business license. Revision #1: Remove wall and door and propose new corner pocket door in the office/den, add 2 new A/C condenser units, replace tuba with showers in all bathrooms, relocate sink, and remove wall & glass in the kitchen. P Volpi, Jan. 29, 2021. Revision #2: Remove corner pocket door in den, retain wall in family room, remove walls and door in game room walls, remove window and door in millwork hallway, add new wall in millwork hallway, add door near washer/dryer closet, remove wall dividing Foyer #1 and #2, remove closet and wall in master bedroom, remove glass door from enclosed balcony, integrate and reconfigure space as part of the enclosed balcony, and make closet as part of storage. P Volpi, Feb. 26, 2021.
Multiple Dwelling
$400,000
Jul 13, 2018
DB-2018-02194
Field Review - Addition / Alteration - #803 Interior alterations to provide improvements to unit #803 in this existing multiple dwelling building, including relocating door to enclosed balcony. Ok for Field Review as per Carolyn Sudiro on May 2, 2018 Selected Energy Upgrade:L2 - Appliances - Upgrade to an Energuide/Energy Star appliance (fridge; dishwasher)
Multiple Dwelling
$80,000
Jul 5, 2018
BP-2018-02363
Field Review - Addition / Alteration - TH2L Interior alteration to remove wall between kitchen and living room, alter ceiling and re-configure kitchen layout in this existing residential unit TH-2L on the 2nd floor in this existing multiple dwelling building on this site. Scope of work includes changing bathroom fixtures. Okay for field review as per E.Kai Jan26/18 L2 - HVAC - Replace washroom baseboard with in-floor radient system
Multiple Dwelling
$30,000
Mar 22, 2018
BP-2018-00463