$497,000
Listed by: Macdonald Realty · MLS®
A Pristine Lifestyle is living on the edge of one of the most Stunning Parks in Canada, STANLEY PARK. Enjoy tranquil WATER, MOUNTAIN & PARK VIEWS through 19' of oversized windows from wall to wall. Lost Lagoon, Sea Wall, lots of Biking Trails, the Beach & Tennis Courts are only steps away from this ICONIC MODERNIST building CHILCO TOWERS. An OVERSIZED Studio at 571 sq ft. Beautifully maintained OPEN PLAN, still with some of the original Mid Century finishes. Spectacular ROOF TOP DECK with 360° VIEWS, lots of Visitor Parking. Quiet Non Smoking, Adult Oriented building, No rentals, Cats allowed. Oversized storage locker, two Bike Rooms, Parking spot $20/month. Co-op - 35% Down. $472 Maint fee incl Property Taxes, Heat, Hot Water & Caretaker. OPEN HOUSE SUN AUG 9th 12-2. Check out VIDEO.
MLS® #
R3151271
Status
Active
Type
Residential
Sub-type
Apartment/Condo
Style
Bachelor/Studio
Ownership
Shares in Co-operative
Bedrooms
0
Full Baths
1
Half Baths
0
Fireplaces
0
Living Area
577 sqft
Main Floor
577 sqft
Stories
9
Year Built
1957
Age
69 years
Structure
Multi Family, Residential Attached
Parking Stalls
0
Parking Type
Open, Front Access, Side Access
Strata Fee
$472/mo
MLS® Area
West End VW
City
Vancouver
Postal Code
V6G 2P9
Subdivision
Chilco Towers
Heating
Hot Water · Natural Gas
Laundry
Common Area
Interior Features
Elevator · Storage
Pets
Cats OK, No Dogs, Number Limit (One), Yes With Restrictions
View
WATER, LAGOON, MOUNTAINS, PARK
Lot Features
Central Location, Marina Nearby, Private, Recreation Nearby
Community
Adult Oriented, Shopping Nearby
Building Amenities
Bike Room · Caretaker · Trash · Maintenance Grounds · Heat · Hot Water · Management · Sewer · Taxes · Water
Coordinates: 49.293479, -123.137856 · Map data © Google
2 bd · 2 ba · 1,147 sqft
MLS® R2982222 · Oakwyn Realty Ltd.
$1,149,000
Source: City of Vancouver Open Data
Direct to Inspections - Addition / Alteration - 204-710 Chilco St Interior alterations to provide residential improvements to unit 204 on the 2nd floor at 710 Chilco Street of this existing multiple dwelling building on this site. Scope of work includes: Ceiling Repair throughout entire unit OK for DTI as per J.Ly, Jul 18, 2025 Schedule B (Structural) provided by Li Qing Shi 7786559518.
Dwelling Unit
$50,000
Jul 28, 2025
BP-2025-03268
Direct to Inspections - Addition / Alteration - #503 Interior alterations to provide improvements to dwelling unit #503 on the 5th floor of this multiple dwelling building on this site. OK for DTI per W. Wong May 27, 2024
Multiple Dwelling
$60,000
Oct 15, 2024
BP-2024-01885
Direct to Inspections - Addition / Alteration - 710 Chilco St Interior alterations to repair the ceiling in the meeting room, lobby and caretaker suite on the ground floor of this multiple dwelling building on this site. OK for DTI per W,Wong - May 3/24
Multiple Dwelling
$19,000
May 7, 2024
BP-2024-01584
Field Review - Addition / Alteration - Interior renovations to repair damaged ceilings in 6 units of existing multiple-dwelling building on this site. Scope of work to include removing damaged ceiling assemblies and installation of new structural assembly and ceilings in units #304, #402, #603, #704, #802 and #803. Revision #1 - to add unit 603 into scope. Bathroom Re&Re new finishes and fixtures. Ok for field review per S. Jordan 12 Feb 2024 Sched B - Struct: Shi, Li Qing 778-655-9518 Note: ok to process all units as one permit per DBI D. Holbrook.
Multiple Dwelling
$38,000
Feb 21, 2024
BP-2024-00499
Field Review - Addition / Alteration - #901 - 9th floor Interior alterations to provide improvements to the existing dwelling unit (#901) on the 9th floor of this existing multiple dwelling building on this site. E2 - HVAC - Install timers (up to 60 minute), or humidistat for washroom fan(s) OK to process as DTI as per K. Clark December 15, 2022 DBI to confirm if a structural engineer is required.
Multiple Dwelling
$80,000
Dec 22, 2022
BP-2022-05532
Field Review - Addition / Alteration - #603 - 6th Floor Interior alterations to provide improvements and alteration of layout to the to the existing residential suite on the 6th floor of the existing highrise multiple dwelling building on this site. OK for Field Review per I. Batt, May 08/2019 Scope of Work: -remove and replace all kitchen cabinets, plumbing fixtures, appliances, lighting fixtures and flooring -install new cabinets in living and kitchen -remove a portion of interior walls Energy Upgrade Selected: L2 - Appliances - Upgrade to an Energuide/Energy Star appliance (fridge; dishwasher) Building Not Sprinklered – No sprinkler inspection or permit required.
Multiple Dwelling
$60,000
Jun 6, 2019
BP-2019-01991
Field Review - Addition / Alteration - (#604) Interior alterations only to provide improvements to this existing residential dwelling unit at this existing co-operative Multiple Dwelling building. Scope includes removal of a partition wall and construction of a new partition wall, and upgrading the electrical panel. OK for field review processing as per Howie Chow, February 17, 2017.
Multiple Dwelling
$100,000
Mar 17, 2017
BP-2017-00909