




Subject: $1,017,500 · $1,864/sqft
$1,017,500
Listed by: Magnum Projects Ltd. · MLS®
Landmark on Robson is the pinnacle of luxury living in downtown Vancouver, blending modern sophistication with the vibrant energy of Robson Street. This premier residential development features two iconic towers meticulously designed by Atelier Ikebuchi, to captivate, offering a collection of exquisitely crafted homes with breathtaking views of the city, mountains, and waterfront. Each residence is meticulously appointed with high-end finishes, floor-to-ceiling windows, and open-concept layouts that exude elegance. Residents will enjoy world-class amenities, including a state-of-the-art fitness center, indoor pool, spa, lush outdoor terraces, and exclusive entertainment spaces.
MLS #
R3064820
Status
Closed
Type
Residential
Sub-type
Apartment/Condo
Ownership
Freehold Strata
Zoning
RM-6
Bedrooms
1
Full Baths
1
Half Baths
0
Kitchens
1
Fireplaces
0
Living Area
546 sqft
Main Floor
546 sqft
Stories
32
Year Built
2024
Age
2 years
Roof
Concrete
Construction
Concrete, Frame Metal, Aluminum Siding, Concrete (Exterior), Glass (Exterior)
Structure
Multi Family, Residential Attached
Parking Stalls
0
Parking Type
Underground, Lane Access
Facing
Southwest
Original Price
$1,017,500
Strata Fee
$537.59/mo
Listed
2025-11-03
MLS Area
West End VW
City
Vancouver
Postal Code
V6G 0E4
Heating
Other
Cooling / A/C
Central Air · Air Conditioning
Flooring
Hardwood · Tile
Appliances
Washer/Dryer · Dishwasher · Refrigerator · Stove · Microwave · Oven
Laundry
In Unit
Security
Security System · Smoke Detector(s) · Fire Sprinkler System
Windows
Window Coverings
Interior Features
Elevator
Exterior Features
Garden · Playground · Balcony
Total Units
236
Rentals Allowed
100
Rental Limit
%
Pets
Cats OK, Dogs OK, Number Limit (Two), Yes With Restrictions
Restrictions
Pets Allowed w/Rest.,Rentals Allwd w/Restrctns
Strata Mgmt Co.
TBD
Transit
1 BLOCK
Lot Features
Marina Nearby, Recreation Nearby
Water Source
Public
Sewer
Public Sewer, Storm Sewer
Utilities
Community, Electricity Connected, Natural Gas Connected, Water Connected
Pool
Indoor
Community
Shopping Nearby
Building Amenities
Exercise Centre · Sauna/Steam Room · Concierge · Trash · Maintenance Grounds · Gas · Heat · Hot Water · Management · Other · Recreation Facilities · Snow Removal · Water
Property Disclosure
Yes
Coordinates: 49.288513, -123.131171 · Map data © Google
Listed by Heller Murch Realty
Source: City of Vancouver Open Data
Field Review - Addition / Alteration - Unit #3201 - 1482 Robson Street Interior and exterior alterations to provide tenant improvements and change of use from residential shell to residential dwelling unit in unit #3201 on the 32nd floor of this existing mixed-use building on this site. Scope of work includes full tenant fit out - partitions, doors, millwork, plumbing, electrical, sprinklers, hvac, furniture and finishes Revision #1: To change General Contractor. No changes to existing approved plans. Schedule A provided by provided by Ge Song | SG Architecture and Design Inc. | gloria@sgarchitecture.ca | 778-989-9925 Schedule B (Architectural) provided by Ge Song | SG Architecture and Design Inc. | gloria@sgarchitecture.ca | 778-989-9925 Schedule B (Fire Suppression Systems) provided by Alex Z.Q. Li, P.Eng | Lia Engineering LTD. | ali@liaengineering.com | 778-323-1368 Schedule B (Mechanical/Plumbing) provided by Alex Z.Q. Li, P.Eng | Lia Engineering LTD. | ali@liaengineering.com | 778-323-1368 Schedule B (Electrical) provided by Guowei Wang | WGW Engineering LTD | wei@wgweng.com | 604-336-9363 Okay for Field Review as per Isidora C. October 9, 2025 Notes: 1. DBI to determine on site if Structural and Schedule D is required 2. This permit is reviewed under VBBL 2025
Apartment
$468,000
Nov 10, 2025
DB-2025-04487
Certified Professional Program - New Building - To construct a 32 and 34- storey mixed use building containing Retail, Office and 319 Dwelling units (236 market/83 social housing), all over four levels of underground parking having vehicular access from the lane. STAGED CONSTRUCTION Stage I (excavation/shoring) issued August 20, 2018. Stage II (full construction) issued February 7, 2020. Change in CP: Barry Thorson replaced Tavis McAuley (effective Nov.4, 2019). Revision 1: Revised shoring design to add 5 new soil anchors on East elevation. (issued Sept. 25, 2020) Revision #2: To revise exhaust ducts on level 3, amalgamate suites 410 and 420, remove dead ended corridor on level 4. and convert to shell penthouse units in West and East tower. Revision #3: Change of use from retail to restaurant for units: 202, 203, 213 and 214. Revision #4: Change of the project architect/CRP and structural engineer.
Multiple Dwelling
$188,958,518
Feb 7, 2020
BP-2018-01124