$7,889,800
Listed by: Bosa Properties Realty Inc. · MLS®
FifteenFifteen by Bosa Properties & Kingswood Properties, our most anticipated project yet. Designed by world-renowned architect Ole Sheeran & his idea of three-dimensional living, FifteenFifteen's strong sculptural form introduces horizontality to an urban tower. This Observatory residence offers the opportunity to own a once-in-a-lifetime architectural experience, boasting a dramatically cantilevered space and offering urban and natural vistas from multiple directions. Indulge in this fully automated home system by Savant, premium Miele appliances, Dada cabinetry by Molteni Group & top of the line Dornbracht fixtures. Building amenities include a Sky Lounge, private wellness centre, 24-hr concierge, full-time valet & auto porter. This is horizontal living at its best.
Watch this home
Get an email when the price changes, it sells, or a new unit lists in this building. Sign in or create a free account.
~900 m straight-line to Burrard SkyTrain
Screening estimate from provincial regulations (TOA station points, B.C. Reg. 263/2023 & 265/2023; small-scale multi-unit housing rules). Distances are straight-line; actual TOA maps are set by municipal bylaw and some parcels (heritage, ALR, exempt areas) are excluded. Confirm with the municipality before relying on it.
MLS® #
R3172012
Status
Active
Type
Residential
Sub-type
Apartment/Condo
Ownership
Freehold Strata
Bedrooms
3
Full Baths
3
Half Baths
0
Living Area
2,179 sqft
Main Floor
2,179 sqft
Stories
42
Year Built
2028
Structure
Multi Family, Residential Attached
Parking Stalls
2
Garage Spaces
2
Parking Type
Garage Double, Underground
Strata Fee
$2,173.97/mo
MLS® Area
West End VW
City
Vancouver
Postal Code
V6G 2Z6
Subdivision
Fifteenfifteen
Heating
Heat Pump
Cooling / A/C
Central Air · Air Conditioning
Appliances
Washer/Dryer · Dishwasher · Disposal · Refrigerator · Stove · Oven · Range Top · Wine Cooler
Laundry
In Unit
Windows
Window Coverings
Interior Features
Elevator · Storage
Exterior Features
Balcony
Pets
Cats OK, Dogs OK, Number Limit (Two), Yes With Restrictions
View
WATER, CITY, MOUNTAINS
Lot Features
Central Location, Marina Nearby, Recreation Nearby
Community
Shopping Nearby
Building Amenities
Bike Room · Exercise Centre · Sauna/Steam Room · Concierge · Trash · Maintenance Grounds · Hot Water · Management · Recreation Facilities
Coordinates: 49.289692, -123.130014 · Map data © Google
$5,500,000
West End VW
MLS® R3171730 · Listed by Sutton Group-West Coast Realty
Source: City of Vancouver Open Data
Certified Professional Program - New Building - To construct a new 42 storey mixed-use building consisting of: Level 1 and Level 2 - double height café (restaurant) shell Level 3 to Level 42 - 190 (per DP-2022-00542) residential strata units, all over 8 (eight) levels underground parking. An existing office tower is located on the same property west of the new residential tower and is separated by a 2 h firewall on Levels P1 and P2. The existing office tower and basement and the new residential tower and basement are considered separate buildings for the application of Division B, Part 3 requirements of the Building By-Law. This building is equipped with a radio antenna system. This project was reviewed under the VBBL 2019. NOTE: Future restaurant at Level 1 may not be visible at TI application stage. The applicant refused to submit K2 Form with this BP application. 27-Jul-2022 - Stage 1 (excavation and shoring) issued. 14-Sep-2023 - Stage 2.1 issued. Initial portion of below-grade structure, only for footings. Revised based on Peer Review. Issued subject to: follow-up is required when the vertical excitation analysis runs are complete to confirm that the foundation design is sufficient as issued and to verify whether or not any amendment is required. 08-Nov-2023 - Stage 2.2 issued. Foundation structure for basement levels P7 though P4. 14-Mar-2024 - Stage 2.3 issued. Foundation structure for basement levels P3 up to incl. Level 1. 06-Aug-2024 - Stage 3 (building structure Levels 2 through 5) issued by MV. 14-Nov-2024 - Stage 4 (full permit) issued. 12-Sep-2023 - Rev#1 issued Revision to excavation & shoring drawings to match Engineering's records. Engineering's records show E & S set stamped May 31, 2022 by M. Dinier, P. Eng. 21-Oct-2025 - Rev #2 issued. Effective Oct 3, 2025 Emilia Mazzonna, P. Eng., CP assumed responsibilities as a CP for this project. CP To apply for BP R2- (# unit changed from 190 to 185) 2-Jun-2026
Multiple Dwelling · Parking Garage · Restaurant - Class 1
$101,000,000
Nov 14, 2024
BP-2018-04783