




Subject: $1,249,000 · $1,182/sqft
$1,249,000
Welcome to Bosa's finest development, The Brighton. Enjoy the fantastic unobstructed water, city and mountain views from high above in this very spacious and well designed 2 bedroom and 2 full bathrooms suite. The rarely available 04 plan home has been completed renovated to the highest standard. Features include real brick feature walls, custom millwork, floor to ceiling windows, hardwood/terra cotta tile, beautiful custom gourmet kitchen with stunning kitchen island, spa-like ensuite bathroom, gas range, gas fireplace, and a large balcony for enjoying the beautiful views. 2 large secured parking and a separate large storage locker included. Extremely well maintained building equipped with pool, hot tub, sauna, exercise room and recreation room.
MLS #
R2988902
Status
Canceled
Type
Residential
Sub-type
Apartment/Condo
Ownership
Freehold Strata
Zoning
CD-1
Bedrooms
2
Full Baths
2
Half Baths
0
Kitchens
1
Fireplaces
1
Living Area
1,057 sqft
Main Floor
1,057 sqft
Stories
24
Year Built
2004
Age
21 years
Roof
Other
Construction
Concrete, Brick (Exterior), Concrete (Exterior), Glass (Exterior)
Structure
Multi Family, Residential Attached
Parking Stalls
2
Parking Type
Underground, Side Access
Original Price
$1,249,000
Strata Fee
$722.87/mo
Taxes
$3,514.32/yr
Listed
2025-04-10
MLS Area
Downtown VE
City
Vancouver
Postal Code
V6A 4K7
Subdivision
The Brighton
Heating
Baseboard · Electric
Flooring
Hardwood · Mixed · Tile
Appliances
Washer/Dryer · Dishwasher · Refrigerator · Stove
Laundry
In Unit
Fireplace
Gas
Interior Features
Elevator · Storage
Exterior Features
Balcony
Total Units
132
Pets
Cats OK, Dogs OK, Number Limit (Two), Yes With Restrictions
Restrictions
Pets Allowed w/Rest.,Rentals Allowed
Strata Mgmt Co.
Associa BC
Strata Mgmt Phone
604-714-1536
Transit
Near
Schools
Near
View
Stunning Water,City & Mountain
Lot Features
Central Location, Recreation Nearby
Water Source
Public
Sewer
Public Sewer, Sanitary Sewer
Utilities
Electricity Connected, Natural Gas Connected, Water Connected
Pool
Indoor
Community
Shopping Nearby
Building Amenities
Bike Room · Exercise Centre · Sauna/Steam Room · Caretaker · Trash · Maintenance Grounds · Gas · Hot Water · Management · Recreation Facilities · Snow Removal
Property Disclosure
Yes
Coordinates: 49.275939, -123.101647 · Map data © Google
$1,020,000
Listed by Macdonald Realty Westmar
Source: City of Vancouver Open Data
Field Review - Addition / Alteration - Exterior alterations to provide improvements to add a new fence with security gate at this multiple dwelling building on this site. OK for DB per M.Einifar OK for Field Review per I.Mackie Related to DB-2025-00177 (1088 Quebec)
Multiple Dwelling
$20,000
Feb 12, 2025
DB-2025-00168
Direct to Inspections - Addition / Alteration - #1405 Interior alterations to provide improvements to dwelling unit #1405 on the 14th floor of this multiple dwelling building on this site. OK for DTI per W. Wong October 9, 2024
Multiple Dwelling
$150,000
Oct 22, 2024
BP-2024-03971
Direct to Inspections - Addition / Alteration - Unit #2004 - 120 Milross Ave Interior alterations to provide renovations to strata unit on second floor of existing multiple dwelling building on this site. Scope of work to include removing shower in ensuite and replacing with storage, replacing bathtub with shower, replacing flooring throughout, replacing cabinets and countertop in bathrooms and kitchen. Ok for DTI per S. Jordan 2 Apr 2024
Multiple Dwelling
$180,000
Apr 30, 2024
BP-2024-01125
Direct to Inspections - Addition / Alteration - #501 - 5th Floor Interior alterations to renovate the kitchen area of this existing Dwelling unit #501 on the 5th floor on this existing Multiple Dwelling building on this site. OK to process as DTI as per J. Zhang August 24, 2023
Multiple Dwelling
$61,077
Aug 30, 2023
BP-2023-03035
Field Review - Addition / Alteration - #606 - 6th floor Exterior and interior alterations to add a heat pump on the balcony of dwelling unit #606 on the 6th floor of this multiple dwelling building on this site. OK for DB per M.Alborg Architectural Schedule B & Building Envelope Schedule D, Y Fan Shi, P.Eng.,ph:604.780.1316 OK to process as DTI as per W. Wong June 30, 2022
Multiple Dwelling
$20,000
Sep 21, 2022
DB-2022-03369
Field Review - Addition / Alteration - #2301 To permit exterior and interior alterations to this existing Unit #2301 in this Multiple Dwelling Building on this site. Scope of Work- Reconfigure layout to bedrooms, kitchen & bathroom updates, remove & install interior walls & doors, adding a new exterior door from the Master Bedroom to the Balcony. - New A/C unit, updates to trim, removing popcorn ceiling, adding fake floor in den area, new tile, appliances and new gas fireplace, millwork, plumbing fixtures and electrical work, flooring & painting. Ok For Field Review per A.Campbell - April.20.2021 OK For Exterior Alts per A.Wroblewski DBI to determine if Sprinklered permit is required & Architectural to be sealed Energy Upgrade: L2 - Lighting - Install lighting dimmer, timers, and/or motion detectors on interior lights Letter of Assurances rec'd: Schedule B Architectural submitted (Window Replacement) per Andrea Eng, 604-454-0402 Schedule B Architectural (Window Replacement) submitted per Joseph Zhang, 604-882-6855 Note: A/C unit to conform to City of Vancouver Noise By-Law. (The sound level of the mechanical equipment shall comply with the Noise Control By-law #6555.) (Note: Air conditioning units are not to exceed a noise level of 55 db during the daytime and 45 db at night.)
Multiple Dwelling
$95,000
Sep 8, 2021
DB-2021-01693
Field Review - Addition / Alteration - #805 - Interior alterations to provide improvements for this unit #805 on the 8th floor of this existing Multiple Dwelling Building on this site. Scope to Include: kitchen & bathroom updates, new lighting, interior doors, millwork and replace fireplace. OK For Field Review per S.Yu on Oct 19, 2020 Energy Checklist: L2 - Appliances - Upgrade to an Energuide/Energy Star appliance (fridge; dishwasher)
Multiple Dwelling
$50,000
Nov 23, 2020
BP-2020-03239
Field Review - Addition / Alteration - #1106 - To permit interior alterations to provide improvements for this unit #1106 in this existing Multiple Dwelling Building on this site. Scope to Include: Updates to the kitchen and bathrooms. Layout change for a new laundry/ storage room. New appliances, fixtures, flooring and lighting throughout. OK For Field Review per A.Campbell & A.Wroblewski - Oct.19.2020 Energy Upgrade: L2 - Lighting - Install lighting dimmer, timers, and/or motion detectors on interior lights\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t
Multiple Dwelling
$110,000
Nov 17, 2020
BP-2020-03246
Field Review - Addition / Alteration - #2103 Interior alterations to provide improvements to unit #2103 on the 21st floor of this multiple dwelling building on this site. OK for field review per W.Wong, January 30, 2020 This is a sprinkered building. District Building Inspector to determine if a Sprinkler Permit is required. Note: Energy trigger chosen; L2 - Lighting - Install energy efficient lighting fixtures (single occupied space area)
Multiple Dwelling
$23,031
Mar 2, 2020
BP-2020-00338
Field Review - Addition / Alteration - Exterior alterations to install an A/C unit on the balcony at this unit #605 on the 6th floor in this existing multiple dwelling building on this site. OK for DB per Hamid Shayan & Ryan Dinh OK for field review as per Jamie Zhang, Aug.08/19 Schedule B and Schedule D-1 submitted per Brennan Vollering, 604-365-3664 Energy Upgrade Exempt: Heat Pump Installation
Multiple Dwelling
$30,363
Sep 16, 2019
DB-2019-03549
Field Review - Addition / Alteration - #906 Exterior and interior alterations to provide improvements for this existing dwelling unit #906 on the 9th floor of this multiple dwelling building on this site. Work to add a heat pump on the balcony. OK for DB per K.Spaans, July 12, 2019. OK for field review per W.Wong, July 12, 2019 Architectural Schedule B & Building Envelope Schedule D-1 submitted by Rosa Salcido, 778.389.4904
Multiple Dwelling
$6,500
Aug 8, 2019
DB-2019-03081
Field Review - Addition / Alteration - #1306 - Exterior and interior alterations to this existing unit #1306 in this existing multiple dwelling building. Scope of work to include: Installing a A/C unit on the balcony along with two internal units located in the Master Bedroom and Kitchen. OK For Field Review as per A.Campbell - July.5.2019 No Energy Upgrade Required, Heat Pump Installation Only
Multiple Dwelling
$13,995
Aug 1, 2019
BP-2019-02994
Field Review - Addition / Alteration - #1405 - 14th floor Interior alterations to install a ductless heat pump air handler in the existing living room and master bedroom and exterior alterations to install a multi indoor inverter heat pump system (condenser unit) on the exterior balcony at this existing residential dwelling unit #1405 at this existing Multiple Dwelling building. OK for exterior alterations to install a multi indoor inverter heat pump system (condenser unit) on the exterior balcony as per planner Brenda Clark, June 3, 2019. OK for field review as per Howie Chow, June 3, 2019. Energy Checklist Exempted: Heat Pump Installation/ Retrofit Note: Schedule D (Building Envelope) may be required by District Building Inspector to be determined on site.
Multiple Dwelling
$10,720
Jul 2, 2019
DB-2019-02447
Field Review - Addition / Alteration - #404 Exterior alterations to install an air conditioning unit in this unit #404 on the 4th floor in this existing multiple dwelling building on this site. Energy Upgrade Exemption: Heat pump installation. OK for field review Jamie Zhang, Jun.25/18 OK for DB per Susan Chang, Jun.25/18
Multiple Dwelling
$26,847
Aug 1, 2018
DB-2018-03425
Field Review - Addition / Alteration - #204 Interior alteration to provide improvement for unit #204 on 2nd floor of this existing building on this site. Energy upgrade selected: L2 - HVAC - Install properly supported ceiling fan Okay for field review as per E.Kai July 17/17
Multiple Dwelling
$40,000
Jul 28, 2017
BP-2017-03759
Field Review - Addition / Alteration - Exterior alterations to install an A/C unit on the balcony of unit #601 on the 6th floor in this multiple dwelling building. OK for field review as per Paul Weber, June 5, 2017 Note: 1. OK to process as DB for A/C unit only per June 5, 2017 2. Schedule D (Building Envelope) may be required by District Building Inspector to be determined on site. 3. Energy Upgrade Exempt: Heat Pump Installation.
Multiple Dwelling
$22,571
Jun 26, 2017
DB-2017-02988