




$699,900
Listed by: Sutton Group - 1st West Realty · MLS®
LOCATION, LOCATION, LOCATION! You won't find a better location than this. this Located on W 28th and Yukon, Brand new move-in ready! Walking distance to King Edward SkyTrain, top hospitals, Cambie Village shopping, Main St, Hillcrest Centre, and next to Queen Elizabeth Park. Enjoy ground-level outdoor patios outside and high-end details inside your home — A/C engineered hardwood floors, a premium integrated Miele appliance package with gas cooktop, quartz countertops, and up to 9ft ceilings. Plus, 2000 SqFt of community amenities with a play area, fire pit, BBQ, and garden. New Home Warranty Included. Call to book private appointment or join us, Open House Saturday 12 - 3PM.
MLS® #
R3124466
Status
Active
Type
Residential
Sub-type
Townhouse
Style
Ground Level Unit
Ownership
Freehold Strata
Bedrooms
1
Full Baths
1
Half Baths
0
Fireplaces
0
Living Area
578 sqft
Main Floor
578 sqft
Stories
3
Year Built
2025
Age
1 years
Structure
Residential Attached
Parking Stalls
1
Parking Type
Additional Parking, Underground, Guest, Lane Access, Asphalt
Strata Fee
$254.32/mo
MLS® Area
Cambie
City
Vancouver
Postal Code
V5Y 0P2
Subdivision
Kinsley By Intergulf
Heating
Heat Pump
Cooling / A/C
Central Air · Air Conditioning
Appliances
Washer/Dryer · Dishwasher · Refrigerator · Stove · Oven
Laundry
In Unit
Security
Smoke Detector(s) · Fire Sprinkler System
Interior Features
Elevator · Storage
Exterior Features
Garden · Playground
Pets
Cats OK, Dogs OK, Number Limit (Two), Yes
View
/
Lot Features
Recreation Nearby
Community
Gated, Shopping Nearby
Building Amenities
Bike Room · Trash · Maintenance Grounds · Gas · Management · Snow Removal
Coordinates: 49.246298, -123.113797 · Map data © Google
Source: City of Vancouver Open Data
Certified Professional Program - New Building - To construct Building 6 one containing 10 dwelling units. Building 6 is one of the six TH blocks constructed on this site. For full project description refer to BP-2021-01182. 28-Mar-2022 - Stage 1 (excavation and shoring) issued. 22-Nov-2022 - Stage 2 (foundation to grade, structural only) issued. 11-Oct-2023 - Stage 3 ( full permit) issued.
Multiple Dwelling
$0
Mar 28, 2022
BP-2021-05441