




$1,520,000
Listed by: RE/MAX Crest Realty · MLS®
Iconic Butterfly by Westbank, designed by Bing Thom Architects. Brand-new 2 bed, 2 bath with 990 sq.ft. interior + 140 sq.ft. balcony showcasing stunning views mountains, Stanley Park & city. High-end Italian kitchen with Miele appliances, large porcelain tile flooring, eucalyptus veneer entry, and curved glass walls with floor-to-ceiling drapery. LEED Gold certified for sustainability. Exceptional amenities: 24-hr concierge, 50m lap pool, rooftop pools, gym & more. Includes 1 parking & 1 storage. A rare opportunity to own in Vancouver’s most visionary building.
MLS® #
R3058679
Status
Active
Type
Residential
Sub-type
Apartment/Condo
Ownership
Freehold Strata
Bedrooms
2
Full Baths
2
Half Baths
0
Living Area
990 sqft
Main Floor
990 sqft
Year Built
2025
Age
1 years
Structure
Multi Family, Residential Attached
Parking Stalls
1
Parking Type
Underground
Strata Fee
$859.26/mo
MLS® Area
Vancouver West
City
Vancouver
Postal Code
V6E 0E5
Heating
Heat Pump
Cooling / A/C
Central Air
Appliances
Washer/Dryer · Dishwasher · Refrigerator · Stove · Microwave
Security
Fire Sprinkler System
Windows
Window Coverings
Interior Features
Elevator
Exterior Features
Playground · Balcony
Lot Features
Central Location, Recreation Nearby
Pool
Indoor
Community
Shopping Nearby
Building Amenities
Clubhouse · Exercise Centre · Recreation Facilities · Caretaker · Maintenance Grounds · Management · Snow Removal
Coordinates: 49.281932, -123.126814 · Map data © Google
2 bd · 2 ba · 1,497 sqft
MLS® R3091493 · RE/MAX Masters Realty
$3,628,888

$1,218,000
Vancouver West
MLS® R3099729 · Listed by Sutton Centre Realty
Source: City of Vancouver Open Data
Certified Professional Program - New Building - To construct a 58-storey building with 331 market units; a 5-storey podium with new church program space and Daycare, an 8-storey social housing building with 61 units all over 9 levels of an underground parkade. To restore and renovate the exiting First Baptist Church. STAGED CONSTRUCTION (SHELL PERMIT) Stage I (Excavation/Shoring and complete Structure) issued December 4, 2018. Stage II (full building permit for new construction. Existing church building excluded from this permit) issued April 29, 2020. Stage III: to allow salvage and abatement of hazardous materials of the existing church issued May 11, 2021. Stage III, Revision 1: to add demolition and replacement of footings to the scope of stage III. Demolition and abatement work to be conducted in accordance with Commitment Letter dated June 17, 2021. Stage IV to restore and renovate the existing church (issued Dec. 3, 21). Revision 2: To include architectural details in the approved Stage 4 BP drawings. Change of architect of record and CRP: Venelin Kokalov replaced Shinobu Homma as of December 21, 2020. Revision 3: Revision to FD response point Revision #4 per the approved DPMA DP-2023-00115 (issued Aug/14/2024) Revision #5: Two 3-bedroom units combined into one 5-bedroom unit on L55. Glass door between pool lobby & change room corridor deleted.
Multiple Dwelling
$300,000,000
Apr 29, 2020
BP-2018-00309