




Subject: $1,499,000 · $1,317/sqft
$1,499,000
Experience sweeping panoramic views of False Creek and David Lam Park from this beautifully renovated waterfront home. This modern corner unit offers floor-to-ceiling window, an open-concept layout with a redesigned kitchen, granite breakfast bar, gas range stove, hardwood flooring, custom built-in office, elegant wood millwork, remote-control motorized blinds and patio with protected water views. Enjoy world-class resort style amenities at Club Viva - including a 60' pool, hot tub, sauna, gym, squash court, theatre, party room, library, guest suite, and 24-hour concierge. Two parking stalls & in-suite storage included. Live the ultimate waterfront lifestyle in the heart of Yaletown. Available, easy to show by appointment.
MLS #
R3042350
Status
Canceled
Type
Residential
Sub-type
Apartment/Condo
Ownership
Freehold Strata
Zoning
CD
Bedrooms
2
Full Baths
2
Half Baths
0
Kitchens
1
Fireplaces
0
Living Area
1,138 sqft
Main Floor
1,138 sqft
Stories
47
Year Built
2003
Age
22 years
Construction
Concrete, Glass (Exterior), Mixed (Exterior)
Structure
Multi Family, Residential Attached
Parking Stalls
2
Parking Type
Underground, Guest, Side Access, Garage Door Opener
Original Price
$1,499,000
Strata Fee
$715.88/mo
Taxes
$4,502.79/yr
Listed
2025-09-02
MLS Area
Yaletown
City
Vancouver
Postal Code
V6Z 3A9
Subdivision
West One
Heating
Baseboard · Electric
Flooring
Hardwood · Tile · Carpet
Appliances
Washer/Dryer · Dishwasher · Refrigerator · Stove · Microwave
Laundry
In Unit
Security
Smoke Detector(s) · Fire Sprinkler System
Windows
Window Coverings
Interior Features
Elevator · Guest Suite
Exterior Features
Balcony
Total Units
246
Rentals Allowed
100
Rental Limit
%
Pets
Cats OK, Dogs OK, Number Limit (Two), Yes With Restrictions
Restrictions
Pets Allowed w/Rest.,Rentals Allwd w/Restrctns
Strata Mgmt Co.
Rancho Management
Strata Mgmt Phone
604-684-4508
View
Water, City & Park Views
Lot Features
Central Location, Marina Nearby, Recreation Nearby
Water Source
Public
Sewer
Public Sewer
Utilities
Electricity Connected, Natural Gas Connected, Water Connected
Accessibility
Wheelchair Access
Pool
Indoor
Community
Shopping Nearby
Building Amenities
Bike Room · Exercise Centre · Sauna/Steam Room · Concierge · Maintenance Grounds · Gas · Hot Water · Management · Recreation Facilities · Snow Removal
Property Disclosure
Yes
Coordinates: 49.272714, -123.126554 · Map data © Google
Listed by Plan A Real Estate Services
Source: City of Vancouver Open Data
Direct to Inspections - Addition / Alteration - Interior alterations to provide residential improvement to an existing dwelling unit at #4502 -1408 Strathmore Mews on the forty-fifth floor of this existing multiple dwelling building on the site. Okay for DTI per A. Best
Dwelling Unit
$90,000
Dec 22, 2025
BP-2025-05112
Field Review - Addition / Alteration - #3001 Interior alterations to provide improvements to this dwelling unit on the 30th floor of this existing Multiple Dwelling Building on the site. Scope of work includes reconfiguring most interior walls, moving the location of the bulk storage room and new bulk head in the kitchen. OK for Field Review as per Nehzat J. on November 17, 2022 Revision #1: Change Applicant and Contractor to Robin Lu - Amber Fly Contracting Ltd. Notes: - This building is sprinklered. District Building Inspector to determine if a Sprinkler Permit is required. - DBI to determine on site if a Schedule B, Structural is required. - Energy Upgrade Selected: E2 - Lighting - Install lighting dimmer, timers, and/or motion detectors on interior lights.
Multiple Dwelling
$98,000
Feb 23, 2023
BP-2022-05217
Field Review - Addition / Alteration - #2308 - 23rd floor Interior alterations to provide improvements to this existing dwelling unit on the 23rd floor (#2308) in this existing multiple dwelling building on this site. Scope of work: remove drop ceiling in living room and both bedrooms, remove select partition walls/doors, construct new partition walls for storage room, new flooring, finishes, new vanities in bathroom, new millwork, cabinets, countertops in kitchen, electrical and plumbing. OK for Field Review per K. Vogt February 17, 2022 E2 - HVAC - Install timers (up to 60 minute), or humidistat for laundry room fan Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Multiple Dwelling
$40,000
Mar 16, 2022
BP-2022-00856
Field Review - Addition / Alteration - #4301 Exterior and interior alterations to this existing unit #4301 in this existing Multiple dwelling building on this site. No plumbing fixtures/laundry permitted in the storage room. Scope to Include: Remove laundry facility in this unit; replace existing Heat Pumps; replace fireplace with glass panels; remove walls in kitchen and update kitchen cabinets, countertops, appliances and fixtures; update layout to master bathroom and new fixtures; and, update lighting, flooring and new paint throughout. OK for Field Review per A.Campbell & A.Wrobleswki - Oct.15.2020 Letters of assurance rcvd Xian Min Lily Qiu 778.321.5377 Julio Reynel-Gracia 778.998.0709
Multiple Dwelling
$180,000
Nov 30, 2020
DB-2020-03211
Field Review - Addition / Alteration - #3208 Interior alterations to provide improvements to this dwelling unit on the 32nd floor of this existing Multiple Dwelling Building on the site. Scope of work: Kitchen updates, removal of den and reconfiguration of storage. OK for Field Review as per S.Yu on May 1, 2020 This building is sprinklered. District Building Inspector to determine if a Sprinkler Permit is required. District Building Inspector to determine if a Schedule B is required for removal of the wall. Energy Upgrade Selected: L2 - Lighting - Install energy efficient lighting fixtures (single occupied space area)
Multiple Dwelling
$18,000
May 28, 2020
BP-2020-01429
Field Review - Addition / Alteration - Interior alterations to provide improvements to the existing 'Spa area' on the ground floor of this existing residential building on this site. Scope of work is to create a universal washroom. OK for field review as per S.Yu June 14, 2019 Letters of assurance rcvd R Bradbury 604.731.7227 KS Jatana 604.210.0021 N Patel 604.210.0021 L2 - Lighting - Upgrade to incorporate Space Control systems (per 9.4.1.2 of ASHRAE 90.1 - 2010)\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t
Multiple Dwelling
$9,000
Jul 17, 2019
BP-2019-02693
Field Review - Addition / Alteration - #3901 Interior alteration to reconfigure interior layout of this existing residential unit #3901 in this existing residential building on this site. Work includes removal of walls defining the den to create an open dining and living room area; move the door to one bathroom to enclose the laundry area within one room; convert both bathtubs to walk-in showers; reconfiguration of the master bedroom closets; new paint, flooring, finishes and fixtures, new kitchen cabinets and new baseboard heaters. Note: Ceilings throughout to be dropped 2"-3" to accommodate new lighting locations + ceiling fans. New light fixtures to be installed throughout. Energy Upgrade Selected: L2 - HVAC - Install properly supported ceiling fan. Okay for field review as per E.Kai May17/18
Multiple Dwelling
$225,000
Aug 17, 2018
BP-2018-02680
Field Review - Addition / Alteration - #2602 Interior alterations to provide improvement to this unit #2602 on the 26th floor in this existing multiple dwelling building on this site. Energy upgrade selected: L2 - Lighting - Install energy efficient lighting fixtures (single occupied space area) OK for field review as per Jamie Zhang, May.16/18
Multiple Dwelling
$90,000
May 31, 2018
BP-2018-02649
Field Review - Addition / Alteration - #1601 Interior alterations to provide improvements in unit #1601 on the 16th floor of this existing multiple dwelling building on this site. Scope of work to include renovating the kitchen, bathroom, painting and new flooring OK for Field Review per I. Batt, Feb 26, 2018 Energy Upgrade: L2 - Lighting - Install lighting dimmer, timers, and/or motion detectors on interior lights (per 9.4.1.2 of ASHRAE 90.1 - 2010)
Multiple Dwelling
$85,000
Mar 28, 2018
BP-2018-01023
Field Review - Addition / Alteration - #907 - Interior alterations to provide residential improvements to unit #907 on the 9th floor of this existing Multiple Dwelling Building. Scope of work includes: reinstatement of the Enclosed Balcony. Flooring within the enclosed balcony is to be of impervious material only. Doors to enclosed balcony area to have predominately clear glazing. Note: Storage room adjacent to the front entrance is to be retained. Related to Special Inspection No. IA-2017-01194. OK for field review as per H. Chow, September 28, 2017. OK for BP for removable UV Solar film as per G. Jiang, November 21, 2017. Note: UV film is to not change the appearance or look of the exterior windows. Selected Energy Upgrade: L2 - Lighting - Install energy efficient lighting fixtures (single occupied space area)
Multiple Dwelling
$150,000
Nov 23, 2017
BP-2017-05095