




Subject: $950,000 · $979/sqft
$950,000
Welcome home to this stunning residence of modern West Coast architecture. This 2 bedroom & den flooded with sunshine expands over 1000sf of indoor/outdoor living. The open concept layout w/ inviting gourmet chefs kitchen, floor-to-ceiling windows, unique fireplace, motorized roller shades & luxurious master bedroom w/ walk-in closet, spa-like bath & heated flooring. The SW facing sun deck is perfect for morning coffees and evening BBQ’s. The Rosedale offers a refined lifestyle where everything is just steps away. Annual $175 optional fee: hotel resort-style pool, hot tub & exercise facility. With proximity to Seawall, Yaletown, Restaurants, Shopping, Parks & Transit, an effortless lifestyle awaits! MUST SEE VIRTUAL TOUR!
MLS #
R3067489
Status
Canceled
Type
Residential
Sub-type
Apartment/Condo
Ownership
Freehold Strata
Zoning
DD
Bedrooms
2
Full Baths
2
Half Baths
0
Kitchens
1
Fireplaces
1
Living Area
970 sqft
Main Floor
970 sqft
Stories
25
Year Built
1993
Age
33 years
Construction
Concrete, Concrete (Exterior), Glass (Exterior), Mixed (Exterior)
Structure
Multi Family, Residential Attached
Parking Stalls
1
Parking Type
Underground, Guest, Front Access
Facing
Southwest
Original Price
$950,000
Strata Fee
$463.4/mo
Taxes
$3,168.16/yr
Listed
2025-11-14
MLS Area
Downtown VW
City
Vancouver
Postal Code
V6B 5W4
Subdivision
Rosedale Gardens
Heating
Baseboard · Electric
Flooring
Laminate · Mixed · Tile
Appliances
Washer/Dryer · Dishwasher · Disposal · Refrigerator · Microwave · Oven · Range Top
Laundry
In Unit
Fireplace
Electric
Windows
Window Coverings
Interior Features
Elevator · Storage
Exterior Features
Garden · Balcony
Rentals Allowed
100
Rental Limit
%
Pets
Cats OK, Dogs OK, Number Limit (Two), Yes With Restrictions
Restrictions
Pets Allowed w/Rest.,Rentals Allowed
Strata Mgmt Co.
CENTURY 21 PRUDENTIAL ESTATES
Strata Mgmt Phone
604-278-2121
Transit
1 BLOCK
Schools
2 BLOCKS
View
City!
Lot Features
Central Location, Recreation Nearby
Water Source
Public
Sewer
Public Sewer, Sanitary Sewer, Storm Sewer
Utilities
Electricity Connected, Water Connected
Community
Shopping Nearby
Building Amenities
Bike Room · Caretaker · Trash · Maintenance Grounds · Hot Water · Management · Sewer · Water
Property Disclosure
Yes
Coordinates: 49.278053, -123.116851 · Map data © Google
2 bd · 2 ba · 981 sqft
$1,099,000
Listed by Rennie & Associates Realty Ltd.
Source: City of Vancouver Open Data
Field Review - Addition / Alteration - Interior alterations to provide improvements to the common amenity room of this existing multiple dwelling building on this site. Scope of work includes removal of two washrooms, sauna room and hot tub. New washroom and storage room. New partitions and interior finishes. Rev #1 - Enlarge unisex washroom - Change doors to sliding doors to enclose the room Letter of assurance submitted: - Sch B (Arch): Eric Law, AIBC, 604.505.2099 Ok for Field Review as per Kirat Kang - Sept. 27, 2023 Note: Occupant load can not exceed 25 persons due to washroom capacity restriction. A permanent sign indicating that occupant load shall be posted in a conspicuous location DBI to confirm if a sprinkler permit is required.
Multiple Dwelling
$85,000
Nov 15, 2023
BP-2023-03560
Direct to Inspections - Addition / Alteration - Interior alterations to this Dwelling unit #307 in this existing Multiple Dwelling building on this site.
Dwelling Unit
$35,000
Jul 24, 2023
BP-2023-02239
Field Review - Addition / Alteration - Unit 1403 - 14th Floor Interior alterations to renovate the existing dwelling unit #1403 on the 14th floor of this existing multiple dwelling building. Okay for DTI by Jamie Z.
Dwelling Unit
$60,000
May 18, 2022
BP-2022-02174
Field Review - Addition / Alteration - 1906 - 19th Floor Interior alterations to provide improvements to the dwelling unit at #1906 on the 19th Level in this existing Multiple Dwelling Building (Building 2) on this site. Scope of work: Remove non loading bearing wall and pocket door. Adding 7 new recessed pot lights in the kitchen/dining with 3" ceiling drops.
Multiple Dwelling
$60,000
Jul 29, 2021
BP-2021-03087
Field Review - Addition / Alteration - #1102 Interior alterations to renovate the bathroom in this existing dwelling unit on the 11th floor in this existing multiple dwelling building (Building 2) on this site. Scope of work: Remove existing bath tub and replace with walk in shower, re & re fixtures, towel heater. Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. E2 - Lighting - Install energy efficient lighting fixtures \t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t OK for Field Review per K.Vogt - Feb 24/21
Multiple Dwelling
$19,000
Mar 22, 2021
BP-2021-00625
High Density Housing / Commercial - Addition / Alteration - Elevator Upgrade - Interior alterations to provide elevator upgrades to three (3) elevators at the existing 25-storey Multiple Dwelling Building on this site for CSA-B44 upgrade. Scope of work: - Reprogram existing addressable smoke detector at elevator lobbies and shaft and add new smoke detectors, where required (machine room). - Installation of new exit signs - Replacement of elevator fused disconnect switches, elevator machine room and elevator pit receptacles with GFCI type, replacement of existing elevator machine room and elevator pit lights with new LED type c/w wire guards, installation of new outdoor downlights on rooftop level, upgrade of existing transfer switch controller to accommodate pre-transfer and elevator emergency power signals Building Review Branch Notes: - Related to EP-2020-09218 - Schedule B, Architectural and Electrical, Sonia Mollaei, P.Eng , 604-695-2740 - Main Recall level: Ground Floor, Alternate Recall Level: Second Floor - Installation & verification of existing FACP in conformance with CAN/ULC S537. - An updated FSP must be submitted to VF&R for approval. This is a requirement of the permit. * Reviewed as per VBBL 2019 and during 2020 Pandemic Crisis.
Multiple Dwelling
$39,300
Feb 11, 2021
BP-2020-04009
Field Review - Addition / Alteration - #2203 - 22nd Level Interior alterations to provide improvements to the dwelling unit at #2203 on the 22nd Level in this existing Multiple Dwelling Building (Building 2) on this site. Scope of work: Remove a wall the in kitchen to create open concept, add pot lights, new cabinets, countertops, and appliances in kitchen. New Vanities in both bathrooms. New doors, lighting, drop ceiling, millwork finishes, hardwood floors, tiles and paint throughout suite. OK For Field Review per A.Campbell - Dec.23.2019 Notes: District Building Inspector to determine on site if removal of wall in kitchen requires Schedule B Structural. Energy Upgrade: L2 appliances upgrade to Energy Star appliances (Fridge and Dishwasher). Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. This Permit has Been Reviewed and Issued Under the 2019 VBBL
Multiple Dwelling
$80,000
Jan 29, 2020
BP-2019-05857
Field Review - Addition / Alteration - Interior alterations to provide improvements to dwelling unit #2505 on the 25th floor of this existing multiple dwelling building on this site. OK for field review as per Jamie Zhang, Mar.22/19 Scope of Work: - remove and replace plumbing fixtures, kitchen cabinetry and appliances - install new hardwood flooring, LED lighting, interior walls at walk in closet - reduce the interior walls of closet at bedroom Energy Upgrade Selected: L2 - SWH - Install low flow shower heads in all showers Building Sprinklered – Building inspector to determine on site is a separate sprinkler permit is required.
Multiple Dwelling
$60,000
May 1, 2019
BP-2019-01232
Field Review - Addition / Alteration - #1806 Interior alterations to provide improvements to this dwelling unit #1806 on the 18th floor in this existing mixed use building on this site. Scope of work: to add additional bathroom and closet. Related: IA-2018-01515: (IA - Sprinkler) OK for field review as per Jamie Zhang, Oct.18/18 Energy Upgrade: L2 - SWH - Install low flow shower heads in all showers
Multiple Dwelling
$50,000
Jan 7, 2019
BP-2018-05493
Field Review - Addition / Alteration - #408 Interior alterations to provide improvements in unit #408 in this existing 25 storey multiple dwelling building. Scope of Work: - Remove two non-loadbearing walls to put in kitchen island - Relocate fridge OK for field review as per Eun Jeon, August 2, 2018 Energy Upgrade Selected: L2 - HVAC - Install timers (up to 60 minutes), or humidistat for washroom fan(s)
Multiple Dwelling
$85,000
Sep 13, 2018
BP-2018-04160
Field Review - Addition / Alteration - #2405 Interior alteration to provide tenant improvement by replacing kitchen and a door in the washroom in the suite #2405 in this existing multiple dwelling residential building on this site. Okay for field review as per E.Kai July 20/18 Letters of assurance rcvd F Xu 778.895.0848 Note: Suite - Reached Energy Efficiency Target\t\t\t\t\t\t\t\t\t\t
Multiple Dwelling
$80,000
Sep 13, 2018
BP-2018-03969
Field Review - Addition / Alteration - Interior alterations to this existing multiple dwelling building in conjunction with replacing the domestic water piping, including firestopping and repairing walls and ceilings. Scope of work includes redirect all the pipes to the common corridor and construct water pipe shafts and bulkhead by lowering the ceilings in the common corridors to conceal the pipes, adjust the lighting, sprinklers and annunciation devices to accommodate the ceiling height. Ok for field review as per Mike Mcdiarmid Sep.19/17
Multiple Dwelling
$3,350,000
Dec 21, 2017
BP-2017-04893
Field Review - Addition / Alteration - #1305 - Interior alterations to renovate existing dwelling unit #1305 on the 13th floor of this multiple dwelling building on this site. Scope of work includes: removing the wall between the kitchen and dining room. remove swing door to the master en-suite and replace with a sliding pocket door, updating kitchen and bathrooms, and update lighting in the suite. Schedule B (Structural) may be required by District Building Inspector to be determined on site. OK for field review per W.Wong, February 20, 2017. Energy trigger chosen; L2 - Appliances - Upgrade to an Energuide/Energy Star appliance (fridge; dishwasher)
Multiple Dwelling
$50,000
Mar 17, 2017
BP-2017-00940
Field Review - Addition / Alteration - #2401 - Interior alterations to remove the wall between the kitchen and living and dining room at unit #2401 on the 24th floor of this existing multiple dwelling building on this site. Work to replace flooring. Special Sprinkler Inspection and Schedule B (Structural) may be required by District Building Inspector to be determined on site. OK for field review per W.Wong, February 10, 2017 Energy trigger chosen; L2 - SWH - Install low flow shower heads in all showers
Multiple Dwelling
$7,000
Mar 8, 2017
BP-2017-00765