




$1,506,656
Listed by: Royal Pacific Realty Corp. · MLS®
Exceptional Westside Vancouver residence at Revive by Belford Properties, ideally located at Ash & 54th. Just minutes to Langara College, parks, shopping, transit and the SkyTrain. Thoughtfully designed with high-quality interior finishes, modern upgrades, and bright, functional living spaces. A rare opportunity for families or investors seeking comfort and lasting value in one of Vancouver's most desirable neighborhoods. Call today for a private showing. Call today to find out! Correct legal SL is Phase 2 SL1 6846 Ash, please make sure correct address on offer.
MLS® #
R3096724
Status
Active
Type
Residential
Sub-type
Townhouse
Style
3 Storey
Ownership
Freehold Strata
Bedrooms
2
Full Baths
2
Half Baths
1
Fireplaces
0
Living Area
1,500 sqft
Main Floor
700 sqft
Year Built
2026
Structure
Residential Attached
Parking Stalls
1
Garage Spaces
1
Parking Type
Garage Single, Concrete
MLS® Area
South Cambie
City
Vancouver
Postal Code
V6P 3K4
Heating
Hot Water · Natural Gas
Appliances
Washer/Dryer · Dishwasher · Refrigerator · Stove
Exterior Features
Balcony
View
MOUNTAIN
Building Amenities
Trash · Gas · Hot Water · Management
Coordinates: 49.223322, -123.117829 · Map data © Google
Watch this home
Get an email when the price changes, it sells, or a new unit lists in this building. Sign in or create a free account.
Strata fee / sqft (median)
$0.33/mo
46% below area median
Year built
2026
Listings on record
6
6 active now
Rules
Pets: Yes With Restrictions, Cats OK, Dogs OK
Sale prices, sale-to-list ratio and time to sell for this building are available to registered users. Create a free account
Based on MLS® listings at this address and active strata listings in the area. Keyword flags come from public listing remarks and aren’t a substitute for strata minutes, the depreciation report or a Form B.
Transit-Oriented Area — Tier 2
~280 m from Langara — 49th Avenue SkyTrain station
Provincial law requires the city to allow at least 4.0 FAR and 12 storeys for residential here — well above typical single-family zoning. Potential land-assembly interest from developers.
~280 m straight-line to Langara — 49th Avenue SkyTrain
Screening estimate from provincial regulations (TOA station points, B.C. Reg. 263/2023 & 265/2023; small-scale multi-unit housing rules). Distances are straight-line; actual TOA maps are set by municipal bylaw and some parcels (heritage, ALR, exempt areas) are excluded. Confirm with the municipality before relying on it.
Not in the Agricultural Land Reserve.
The listing’s flood plain disclosure is available to registered users. Create a free account
ALR from the Agricultural Land Commission via DataBC (point check at the listing’s mapped location). Flood plain is the listing brokerage’s disclosure. Confirm both with the municipality and your lawyer.
2 bd · 3 ba · 1,098 sqft
MLS® R3097183 · Multiple Realty Ltd.
$1,459,066

$2,350
South Cambie
MLS® R3171620 · Listed by Coronet Realty Ltd.
Source: City of Vancouver Open Data
Certified Professional Program - New Building - Building 3 - To construct a 3 storey, 2 dwelling units for this MCD (townhouse). NOTE: All fees have been paid under Project Site BP-2020-01972. Application documents have also all been filed under that same Project Site BP. A change in CP from - Jan Madura [outgoing - September 16, 2022 to - David Ho [incoming September 17, 2022). see BP-2020-01972 for details.
Multiple Dwelling
$0
Sep 16, 2022
BP-2021-04886
Enquiry Centre - Demolition / Deconstruction - To demolish this existing one-family dwelling on the site. Constructed in 1959 - no recycling required Notice of demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 of 604.873.00 outside of Vancouver.
Single Detached House
$15,000
Jun 28, 2022
DB-2021-01959
Enquiry Centre - Salvage and Abatement - Interior alterations for salvage of non-structural building components prior or during abatement work and removal of non-structural hazardous materials in this existing one family dwelling building on this site. Related to demolition permit, DB-2021-01959 and Street Use Permit, SU-2021-01986. Notes: ~ QP declaration submitted by Xiaoqiang (David) Yang AScT, Ph.D. of Pacific Ark Environmental Consulting Ltd. ~ This is a salvage and abatement permit only and does not authorize any demolition or deconstruction work on the house. Once you have completed your salvage and abatement, please send the report to [email protected].
Single Detached House
$0
Nov 24, 2021
BP-2021-02077
Certified Professional Program - New Building - To construct 11 (2 to 3 storeys) combustible townhouses, consisting of 51 dwelling units on top of a single level below grade parking garage, having vehicle access off a lane; and to be constructed concurrently with the adjacent property at 6988 Ash St. (BP-2020-01973). NOTE: This permit is for all below-grade site works and foundation construction. ** The 2019 VBBL 12511 and its amendments apply to this permit application that has been reviewed during the Covid-19 Pandemic. RELATED Permits: BP-2021-04884: Bldg. 1 at 6790 Ash St = 7 units BP-2021-04885: Bldg. 2 at 6810 Ash St = 3 units BP-2021-04886: Bldg. 3 at 6818 Ash St = 2 units BP-2021-04887: Bldg. 4 at 6820 Ash St = 6 units BP-2021-04888: Bldg. 5 at 6832 Ash St = 3 units BP-2021-04889: Bldg. 6 at 6846 Ash St = 3 units BP-2021-04890: Bldg. 7 at 6852 Ash St = 6 units BP-2021-04891: Bldg. 8 at 6858 Ash St = 6 units BP-2021-04892: Bldg. 9 at 6864 Ash St = 6 units BP-2021-04893: Bldg. 10 at 6888 Ash St = 3 units BP-2021-04894: Bldg. 11 at 6894 Ash St = 6 units STAGE I - Excavation & Shoring - Issued November 16, 2021. REV. #1 to Stage 1 - Formwork only, no concrete pouring. Issued August 2, 2022. STAGE II - Full Construction - Issued September 16, 2022. REV. #2 - A change in CP from - Jan Madura [outgoing - September 16, 2022 to - David Ho [incoming September 17, 2022. Received notification on Nov. 8, 2022. Rev #3 - (___________) - Changes to the following: - Removal of water feature within courtyard - General updates to the parkade, including changing the use of the water feature pump room, location of the security gate, & electrical closet. - Deletion of fire shutter and infilling the opening to a 2hr Fire/Party wall to separate the two parkades. - Amendment to stormwater tanks. - Revised C1 Ceiling Assembly - A change in CRP/Arch from Dwayne Smyth (outgoing - May 22, 2026) to Nick Scully (incoming - May 22, 2026).
Multiple Dwelling
$15,239,873
Nov 16, 2021
BP-2020-01972