




Subject: $6,388,000 · $2,256/sqft
$6,388,000
$6,388,000
Current Price
$6,480,000
Listed At · Sep 2, 2025
Presenting a truly rare offering at The Concord: a waterfront residence that epitomizes luxury living. Spanning 2832 sqft this home provides a grand interior with 3bedrooms 4baths, featuring generously proportioned rooms bathed in natural light from floor-to-ceiling windows. Unobstructed vistas of False Creek, the marina and the Seawall create a breathtaking backdrop. The desirable southwest and east exposures ensure a sun-drenched atmosphere throughout the day. With over 1,600 square feet of private, landscaped patios, complete with custom lighting and an irrigation system. The home has been meticulously upgraded with engineered hardwood flooring, updated bathrooms, sophisticated built-in wine wall, motorized blinds and curtains and more. Private 2-car garage with storage space.
MLS #
R3041947
Status
Canceled
Type
Residential
Sub-type
Apartment/Condo
Style
Ground Level Unit
Ownership
Freehold Strata
Zoning
CD-1
Bedrooms
3
Full Baths
3
Half Baths
1
Kitchens
1
Fireplaces
1
Living Area
2,832 sqft
Main Floor
2,832 sqft
Year Built
2003
Age
23 years
Roof
Other
Construction
Concrete Frame, Concrete (Exterior), Glass (Exterior)
Structure
Multi Family, Residential Attached
Parking Stalls
2
Garage Spaces
2
Parking Type
Garage Under Building, Garage Double, Front Access, Concrete
Facing
South
Original Price
$6,480,000
Strata Fee
$2,291.35/mo
Taxes
$25,371.1/yr
Listed
2025-09-02
MLS Area
Yaletown
City
Vancouver
Postal Code
V6Z 3B3
Heating
Forced Air · Natural Gas · Radiant
Cooling / A/C
Central Air · Air Conditioning
Flooring
Hardwood · Tile
Appliances
Washer/Dryer · Dishwasher · Refrigerator · Stove
Fireplace
Gas
Patio / Porch
Patio · Deck · Sundeck
Interior Features
Storage
Exterior Features
Private Yard
Pets
Yes
Restrictions
Pets Allowed,Rentals Allowed
Strata Mgmt Co.
Rancho
View
Direct Water, False Creek
Lot Features
Central Location, Cul-De-Sac, Marina Nearby
Water Source
Public
Sewer
Public Sewer, Sanitary Sewer
Utilities
Electricity Connected, Natural Gas Connected, Water Connected
Pool
Indoor
Community
Shopping Nearby
Building Amenities
Exercise Centre · Hot Water · Management · Recreation Facilities · Snow Removal
Property Disclosure
Yes
Coordinates: 49.271442, -123.121437 · Map data © Google
Listed by Plan A Real Estate Services
Source: City of Vancouver Open Data
Field Review - Addition / Alteration - 1328 Marinaside Cres - Units 1702 and 1703 Interior alterations to reconfigure and combine units 1702 & 1703 on the 17th floor and add interconnecting door to provide residential improvements to both dwellings at this existing mixed use building on this site. Scope of work: Reconfigure and combine units 1702 & 1703 that includes demising and construction of partition walls, add fire rated interconnected door, new kitchen, bathroom, millwork, plumbing, flooring, lighting, sprinkler work to suit. Note: Balcony on the South East corner provides access to both units This building is sprinklered. A separate sprinkler permit is required for all related work. Ok for Field Review as per Shelley D & J. Kuhleitner Okay for DB per Andrew W Letter of Assurance: Sch A, Sch B (Arch): Donald Gurney, AIBC, 604 984 7722 Sch B (Struct): Todd Wernham, P Eng, 604 762 7844 Sch B (Plbg): Kevin Jackson, P Eng, 604 941 2976 Sch B (Elec): Steven Nemetz, P Eng, 604 736 6562
Apartment
$1,500,000
Dec 16, 2025
DB-2025-04359
Field Review - Addition / Alteration - 1328 Marinaside Crescent Interior alterations to renovate the pool room on the ground floor of this existing multiple dwelling building on this site. Schedule B Architecture: David N Palmer - Gustavson Wylie Architects Inc 604-209-2787
Apartment
$250,000
Nov 20, 2025
BP-2025-04671
Direct to Inspections - Addition / Alteration - #801 Interior alterations to provide improvements to dwelling unit #801 on the 8th floor of this multiple dwelling building on this site. OK for DTI per W. Wong January 18, 2024
Multiple Dwelling
$200,000
Jan 24, 2024
BP-2024-00190
Field Review - Addition / Alteration - Unit #2201 Interior alterations to provide improvement for an existing multi-dwelling unit. The bulk storage is being relocated. Work to include replacing bathtub in MB bath, removing bank of closet doors, adding a door from MB built wall to create walk-in closet, add door from MB built wall to create a storage area in family room finished in drywall and paint. remove non-structural wall between 3rd bedroom and den to create a larger bedroom. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. E2-HVAC energy upgrade DBI to determine if sprinkler permit is required. The new storage should have exactly the same size as the previous one. (closet) Although it does not meet the BULK STORAGE AND IN-SUITE STORAGE bylaw (https://bylaws.vancouver.ca/Bulletin/b004.pdf).
Multiple Dwelling
$11,000
Aug 27, 2021
BP-2021-04085
Field Review - Addition / Alteration - Interior alterations to provide improvements to this existing unit (702) in this existing multiple dwelling building on this site. Scope of work: remove existing fixtures. Relocate and install new fixtures. Finishing throughout. Plumbing and Electrical to suit. E2 level upgrade required. E2 - HVAC - Install timers (up to 60 minute), or humidistat for washroom fan(s) Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. OK for filed review as per Rosa Astorino July 2, 2021.
Multiple Dwelling
$50,000
Aug 12, 2021
BP-2021-03392
Field Review - Addition / Alteration - #1905 - 19th floor Interior alterations to provide improvements to unit #1905 in this existing multiple dwelling on the site. Scope of work: Reconfigure ensuite and walk in closet, new doorway to ensuite from master bedroom, remove master bedroom closet doors/walls, bathrooms upgrade, millwork, new fireplace, lighting, electrical and plumbing work OK for Field Review per (Kim Vogt) - Feb 24/21 Energy Requirements: E2 - Retrofit Path: 1 @ E2 - E2 - HVAC - Install timer (up to 60 minutes) and/or gas meter for fireplace operation Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No sprinkler permit required.
Multiple Dwelling
$60,000
Mar 15, 2021
BP-2021-00637
Field Review - Addition / Alteration - #1103 - To permit interior alterations to this unit #1103 in this existing multiple dwelling building on this site. Scope of work to remove one existing bathroom and replace with new walk in bulk storage, demolition of interior walls for new layout, provide updates to the bathrooms, add dropped ceiling and update lighting in living room, related plumbing and electrical work. OK For Field Review per A.Campbell - Nov.30.2020 Notes: 1. Energy upgrade trigger: L2 - Lighting - Install energy efficient lighting fixtures (single occupied space area) 2. Sprinkler permit required 3. Building Inspector to determine Structural Engineer required for the removal of partition walls
Multiple Dwelling
$150,000
Feb 2, 2021
BP-2020-03785
Field Review - Addition / Alteration - Interior alterations to provide improvements for unit #1605 in this existing multiple dwelling building. Scope of work: - Update kitchen & bathroom, millwork, interior partitions, new appliances, fireplace and interior doors, plumbing fixtures, electrical and sprinkler work OK for field review as per Eun Jeon, December 4, 2020 Note: 1. This building is sprinklered. Sprinkler permit required Energy Upgrade: E2 - Lighting - Install lighting dimmer, timers, and/or motion detectors on interior lights
Multiple Dwelling
$150,000
Dec 24, 2020
BP-2020-03860
Field Review - Addition / Alteration - #1505 - 15th floor To provide tenant improvements to this dwelling unit in this existing multiple dwelling building. Scope of work: bedroom wall reconfiguration, kitchen & bathroom updates, lighting & electrical work and replace gas fireplace, relocation of sprinkler heads, new flooring OK for Field Review as per S.Yu on May 1, 2020 This is a sprinklered building. A Sprinkler Permit will be required for the proposed work to the Sprinkler System. District Building Inspector to determine if a Schedule B is required for removal of the wall. Energy Upgrade Selected: L2- HVAC - Install timer (up to 60 minutes) and/or gas meter for fireplace installation
Multiple Dwelling
$150,000
Jun 4, 2020
BP-2020-01439
Field Review - Addition / Alteration - #1902 Interior alterations to provide improvements to Unit No. 1902 in this existing multiple dwelling building on this site. Scope to include: Removal of some non-load bearing walls in the bathrooms and kitchen area. New wall in master bathroom and new bathroom created off bedroom. Remove and replace all the bathroom fixtures, tile and mill-work. Updates to the kitchen appliances, mill-work and fixtures. New lighting , flooring, and doors throughout unit. New Fireplace. OK For Field Review Per A.Campbell - Dec.12.2019 This permit has been Reviewed and Issued under the 2019 VBBL. Selected Energy Upgrade: L2 - Upgrade to Energuide/Energy Star appliances (fridge, dishwasher)
Multiple Dwelling
$85,000
Jan 7, 2020
BP-2019-05597
Field Review - Addition / Alteration - #601 Interior alterations to provide tenant improvements to this unit #601 on the 6th floor in this existing multiple dwelling building on this site. Ok for field review as per Jamie Zhang, Nov.17/17 L2 - Lighting - Install energy efficient lighting fixtures (single occupied space area)
Multiple Dwelling
$125,000
Jan 3, 2018
BP-2017-05934
Field Review - Addition / Alteration - #205 Interior alterations to this existing suite on the second floor of this existing multiple dwelling residential building OK for Field Review per I. Batt Sep 21.2017 Energy upgrade: L2 - Lighting - Install lighting dimmer, timers, and/or motion detectors on interior lights
Multiple Dwelling
$65,000
Nov 1, 2017
BP-2017-04971
Field Review - Addition / Alteration - #2105 Interior alterations to provide improvements for #2015 on the 21st floor in this existing multiple dwelling building. Energy upgrade exempted.
Multiple Dwelling
$350,000
Oct 26, 2017
BP-2017-05203
Field Review - Addition / Alteration - Unit #220 Interior alterations to provide improvements to unit #220 on the 2nd floor of this existing multiple dwelling building on this site. OK for field review as per Eun Jeon, July 28, 2017 Energy Upgrade: Install Lighting dimmer, timers, and/or motion detectors on interior lights.
Multiple Dwelling
$300,000
Oct 24, 2017
BP-2017-03961
Field Review - Addition / Alteration - #803 Interior alterations to provide improvements to this existing dwelling unit #803 on the eighth floor in this multiple dwelling building. Work to include removal of a washroom to create a bar area, to remove a closet in the bedroom, kitchen cabinet changes, new flooring and other minor changes. L2 - HVAC - Install timers (up to 60 minute), or humidistat for washroom fan(s)\t
Multiple Dwelling
$80,000
Jan 26, 2017
BP-2016-04417