$1,349,000
Listed by: Oakwyn Realty Ltd. · MLS®
"Lina at QE Park" Located in Vancouver's popular Cambie Corridor, a 6-storey concrete building next to Queen Elizabeth Park. This 2bed 3 bath + 2 Flex unit features a spacious layout. Natural Oak hardwood flooring, Caeserstone kitchen countertops & backsplash, Miele appliances, contemporary walk-through shower with quartz linear drain, large niche & Hansgrohe brushed nickel shower outlet. Central air conditioning. Private resident's lounge with a spacious patio for entertaining & special functions. 2 Parking included. Convenient access to the Canada Line Skytrain, Oakridge. Don't miss out on this opportunity! Open House Aug 8&9, Sat&Sun 2-4PM
MLS® #
R3093390
Status
Active
Type
Residential
Sub-type
Townhouse
Ownership
Freehold Strata
Bedrooms
2
Full Baths
2
Half Baths
1
Living Area
1,141 sqft
Main Floor
516 sqft
Stories
6
Year Built
2025
Age
1 years
Structure
Residential Attached
Parking Stalls
2
Parking Type
Underground
Strata Fee
$629.33/mo
Taxes
$4,046.41/yr
MLS® Area
Cambie
City
Vancouver
Postal Code
V5Z 2Z7
Subdivision
Lina At Qe Park
Heating
Heat Pump
Cooling / A/C
Air Conditioning
Appliances
Washer/Dryer · Dishwasher · Refrigerator · Stove · Microwave
Exterior Features
Balcony
Pets
Cats OK, Dogs OK, Number Limit (Two), Yes With Restrictions
Lot Features
Central Location, Recreation Nearby
Community
Shopping Nearby
Building Amenities
Clubhouse · Caretaker · Trash · Maintenance Grounds · Gas · Heat · Hot Water
Coordinates: 49.238287, -123.115506 · Map data © Google
1 bd · 1 ba · 478 sqft
MLS® R3151741 · Sutton Group - 1st West Realty
$2,200
Source: City of Vancouver Open Data
Certified Professional Program - New Building - To build a 6 storey mixed use building of concrete construction comprising of 80 market strata condominiums and a privately operated childcare over two levels of underground parking. VBBL 2019 - NFPA 13 This is a CP Process Permit, and the applicant is Michael Van Blokland, P. Eng., CP. STAGE 1 - Excavation and Shoring issued on July 4, 2022. STAGE 2 - Foundation to Grade issued on Mar 16, 2023. STAGE 3 - Full Construction issued on July 25, 2023. Revision # 1 - (Feb. 26, 206) To change the privately operated childcare to a SHELL space for future childcare. Also, interior and exterior alterations, including changes in the parkade. Please see Arch/Mech/Elec memo change letter. A future TI permit is required.
Multiple Dwelling
$24,500,000
Jul 4, 2022
BP-2021-02873