




Subject: $2,054,900 · $1,510/sqft
$2,054,900
Just completed, ready to move in! King & Columbia - A boutique collection of 1, 3 & 4 bdrm modern brownstone homes nested in Riley Park, with Yamamoto architecture & thoughtful design by the Mill bringing indoor/outdoor living experience & enhanced lifestyle without compromise for discerning families on Vancouver's upper West Side. This CORNER 3 Bed, 2.5 Bath TH features expansive 20’ wide interiors, airy 9' ceilings on all levels, AC & in-suite strg. Huge private rooftop deck to soak in the views. Kitch. incl. premium Fisher & Paykel appl. w/ integrated fridge & DW, & built-in WF. Oak engineered HW floors throughout. 1 EV ready Park stall. Great school catchment. 6-min walk to Canada Line & to trendy shops, restaurants & services on Cambie & Main.
MLS #
R3005222
Status
Canceled
Type
Residential
Sub-type
Townhouse
Style
3 Storey
Ownership
Freehold Strata
Zoning
RM-8AN
Bedrooms
3
Full Baths
2
Half Baths
1
Kitchens
1
Living Area
1,361 sqft
Main Floor
1,361 sqft
Year Built
2025
Roof
Concrete, Torch-On
Construction
Brick, Concrete Block, Frame Wood, Brick (Exterior), Glass (Exterior), Metal Siding
Structure
Residential Attached
Parking Stalls
1
Parking Type
Tandem, Lane Access, Asphalt, Concrete
Original Price
$2,054,900
Strata Fee
$421.91/mo
Listed
2025-05-20
MLS Area
Cambie
City
Vancouver
Postal Code
V5Y 2H8
Subdivision
King & Columbia (Phase 2)
Heating
Electric · Forced Air
Cooling / A/C
Central Air · Air Conditioning
Flooring
Concrete · Hardwood · Mixed · Tile
Appliances
Washer/Dryer · Dishwasher · Disposal · Refrigerator · Stove · Microwave · Range Top · Wine Cooler
Laundry
In Unit
Security
Smoke Detector(s) · Fire Sprinkler System
Patio / Porch
Patio · Deck · Rooftop Deck
Windows
Window Coverings
Interior Features
Storage
Total Units
14
Pets
Cats OK, Dogs OK, Number Limit (Two), Yes With Restrictions
Restrictions
Pets Allowed w/Rest.,Rentals Allowed
Transit
0.45km
Schools
0.55km
View
Peek-a-boo city & mountain
Lot Features
Central Location, Near Golf Course, Lane Access, Private, Recreation Nearby
Water Source
Public
Sewer
Public Sewer, Sanitary Sewer, Storm Sewer
Utilities
Electricity Connected, Natural Gas Connected, Water Connected
Community
Shopping Nearby
Building Amenities
Trash · Maintenance Grounds · Gas · Management · Sewer · Snow Removal · Water
Property Disclosure
No
Coordinates: 49.249150, -123.108979 · Map data © Google
Listed by Sutton Centre Realty
Source: City of Vancouver Open Data
Certified Professional Program - New Building - Related to Site BP-2022-01959 To construct a 3-storey multiple dwelling building (Building 3) containing 5 dwelling units plus a lock-off unit with basement having access to one level of underground parking. Refer to Site BP-2022-01959 for site work and underground parking, fees, and all documents. This is a CP Process Permit and the applicant is Khaleel Sumar, P. Eng., CP. *REVIEWED UNDER VBBL 2019, WITH UPDATED ENERGY REQUIREMENTS AS PER BYLAW #12997 EFFECTIVE JAN 01, 2022* STAGED CONSTRUCTION Stage 1: Excavation & Shoring and Foundation to Grade (Jan 19/23, A. Min) Stage 2: Full Construction (Jul 31/23, A. Min) REVISION #1 (Feb 22/24): - Change of CP from Andrew Harmsworth, P. Eng., CP. to Khaleel Sumar, P. Eng., CP. effective on February 12, 2023. - Changes in cantilevered floor assembly with additional fire blocks in joist cavities. REVISION #2 (Oct 08/24): - Removal of a lock-off unit and convert it to a bedroom of Unit #103.
Multiple Dwelling
$0
Jul 31, 2023
BP-2022-03054
Certified Professional Program - New Building - This permit has been issued for all site work and below grade facilities, including one level of common underground parking for this proposed development: To construct a 3-storey multiple dwelling building consisting of three townhouses with total 14 dwelling units, plus a lock-off unit (3 dwelling units in Building; 6 dwelling units in Building 2; and 5 dwelling units in Building 3), all over one level of underground parking, having vehicular access from the rear lane. This is a CP Process Permit and the applicant is Khaleel Sumar, P. Eng., CP. *REVIEWED UNDER VBBL 2019, WITH UPDATED ENERGY REQUIREMENTS AS PER BYLAW #12997 EFFECTIVE JAN 01, 2022* Building to be sprinklered NFPA 13. Refer to BP-2022-03052 for Building 1 Refer to BP-2022-03053 for Building 2 Refer to BP-2022-03054 for Building 3 STAGED CONSTRUCTION Stage 1: Excavation & Shoring and Foundation to Grade (Jan 19/23, E. Hildebrandt on behalf of A. Min) Stage 2: Full Construction (Jul 31/23, A. Min) REVISION #1 (Feb 12/24): - Change of CP from Andrew Harmsworth, P. Eng., CP. to Khaleel Sumar, P. Eng., CP. effective on February 12, 2023. - Changes in cantilevered floor assembly with additional fire blocks in joist cavities. REVISION #2 (Oct 08/24): - Removal of a lock-off unit and convert it to a bedroom Unit #103 in Building 3 at 157 W King Edward Av (BP-2022-03054).
Multiple Dwelling
$8,200,000
Jan 19, 2023
BP-2022-01959
Enquiry Centre - Demolition / Deconstruction - To demo the existing one-family dwelling building to grade. Character merit - 90% recycling reuse lagan case # 101016022869
Single Detached House
$30,000
Dec 5, 2022
DB-2022-02626
Enquiry Centre - Salvage and Abatement - Salvage & Abatement Building Permit for DB-2022-02626 To demo the existing one-family dwelling building to grade. Character merit - 90% recycling reuse lagan case # 101016022869
Single Detached House
$0
Sep 21, 2022
BP-2022-02677