




Subject: $1,158,000 · $937/sqft
$1,158,000
$1,158,000
Current Price
$1,198,000
Listed At · Sep 2, 2025
Quality built brand new two level front unit in a Triplex setting. No Strata Fee. The main floor comes with a bright and spacious living room ,dinning room and a gourmet kitchen. The second floor has 3 bedrooms and two full baths. Other features include; Air condition, HRV, Heat Pump, Fridge, Stove, Washer and Dryer, Dish Washer, Window coverings, security system, EV outlet, Fully landscaped and fenced. Built by a reputable builder with years of experience. Prime location ideally situated between the Joyce-Collingwood and 29th Ave Skytrain stations, close to park, school and bus. Easy to Show. By Appointment Only.
MLS #
R3042435
Status
Canceled
Type
Residential
Sub-type
Half Duplex
Style
Ground Level Unit
Ownership
Freehold Strata
Zoning
R1-1
Bedrooms
3
Full Baths
3
Half Baths
0
Kitchens
1
Fireplaces
0
Living Area
1,236 sqft
Main Floor
591 sqft
Above Main
645 sqft
Lot Size
3,350.8 sqft
Lot Dimensions
33 x 107.60
Frontage
33
Year Built
2025
Roof
Asphalt
Construction
Frame Wood, Mixed (Exterior)
Structure
Duplex, Residential Attached
Parking Stalls
1
Parking Type
Open, Side Access
Original Price
$1,198,000
Listed
2025-09-02
MLS Area
Collingwood VE
City
Vancouver
Postal Code
V5R 5A1
Heating
Heat Pump
Cooling / A/C
Central Air · Air Conditioning
Flooring
Mixed
Appliances
Washer/Dryer · Dishwasher · Refrigerator · Stove · Microwave
Laundry
In Unit
Security
Security System
Patio / Porch
Patio
Windows
Window Coverings
Total Units
3
Restrictions
No Restrictions
Transit
close
Schools
close
Lot Features
Central Location
Water Source
Public
Sewer
Public Sewer, Sanitary Sewer, Storm Sewer
Utilities
Electricity Connected
Property Disclosure
No
Coordinates: 49.241875, -123.041157 · Map data © Google
$1,158,000
Listed by RE/MAX City Realty
Source: City of Vancouver Open Data
High Density Housing / Commercial - New Building - MULTIPLEX: To construct a three-storey three unit Multiple Dwelling building with 2 surface parking spaces at the rear having access from the lane. Revision #1 (DPMA:DP-2025-00448) June 30th, 2025: 1. PMT removed 2. BC hydro meter added to site plan BRB notes: 1. Building to be sprinklered to NFPA 13R 2. Part 5 design
Multiple Dwelling
$1,300,000
Aug 12, 2024
BP-2024-01530