




Subject: $3,999,000 · $2,285/sqft
$3,999,000
Listed by: Rennie & Associates Realty Ltd. · MLS®
Experience the pinnacle of Waterfront Living at King’s Landing - Vancouver’s most prestigious address, steps from the vibrant heart of Yaletown. This rare southwest corner 2Bed + Den offers floor-to-ceiling windows bathing the home in natural light and framing breathtaking, unobstructed views of False Creek, Granville Island, + George Wainborn Park. Gourmet kitchen features a 6 burner Viking gas range, wine cooler, + extra large pantry for storage. Relax on the 145 SF covered patio — a perfect vantage point for year-round sunsets. This home also includes A/C and a private, gated side-by-side two-car garage equipped with EV charging + extra storage space. Residents enjoy elite amenities, including indoor pool, hot tub, sauna/steam, gym, theatre, roof deck, 3 guest suites + 24 hr concierge.
MLS #
R3083978
Status
Closed
Type
Residential
Sub-type
Apartment/Condo
Ownership
Freehold Strata
Zoning
CD-1
Bedrooms
2
Full Baths
2
Half Baths
1
Kitchens
1
Living Area
1,750 sqft
Main Floor
1,750 sqft
Year Built
2005
Age
21 years
Roof
Other
Construction
Concrete, Concrete (Exterior)
Structure
Multi Family, Residential Attached
Parking Stalls
2
Garage Spaces
2
Parking Type
Garage Double, Underground, Garage Door Opener
Facing
West
Original Price
$3,999,000
Strata Fee
$2,061.74/mo
Taxes
$12,932.4/yr
Listed
2026-01-27
MLS Area
Yaletown
City
Vancouver
Postal Code
V6Z 3G1
Subdivision
Kings Landing
Heating
Forced Air · Heat Pump
Cooling / A/C
Central Air · Air Conditioning
Appliances
Washer/Dryer · Dishwasher · Refrigerator · Stove
Security
Fire Sprinkler System
Windows
Window Coverings
Interior Features
Elevator · Guest Suite
Exterior Features
Garden · Balcony
Pets
Cats OK, Dogs OK, Number Limit (Two), Yes With Restrictions
Restrictions
Pets Allowed w/Rest.,Rentals Allwd w/Restrctns
Strata Mgmt Co.
STRATAWEST
Strata Mgmt Phone
604-904-9595
Transit
NEAR
Schools
NEAR
View
CITY, MOUNTAIN, WATER
Lot Features
Central Location, Marina Nearby, Recreation Nearby
Water Source
Public
Sewer
Public Sewer, Sanitary Sewer, Storm Sewer
Utilities
Community, Electricity Connected, Natural Gas Connected, Water Connected
Pool
Indoor
Community
Shopping Nearby
Building Amenities
Exercise Centre · Sauna/Steam Room · Concierge · Trash · Maintenance Grounds · Gas · Hot Water · Management · Recreation Facilities · Snow Removal
Property Disclosure
No
Coordinates: 49.271976, -123.127948 · Map data © Google
Listed by Plan A Real Estate Services
Source: City of Vancouver Open Data
Direct to Inspections - Addition / Alteration - #2001 Interior alterations to provide improvements to dwelling unit #2001 on the 20th floor of this multiple dwelling building on this site. OK for DTI per W. Wong October 24, 2023
Multiple Dwelling
$120,000
Oct 30, 2023
BP-2023-03902
Direct to Inspections - Addition / Alteration - UNIT 2501-25TH FLOOR Interior alterations to this existing dwelling unit #2501 on the 25th floor of this existing multiple dwelling building (west tower of building 2) on this site. Okay for DTI processing by J Zhang March 3, 2023.
Dwelling Unit
$125,000
Mar 9, 2023
BP-2023-00805
Field Review - Addition / Alteration - #2801 - 28th floor (West Tower) Interior alterations to provide improvements to this existing dwelling unit on the 28th floor ( #2801) in this existing multiple dwelling building on this site. Scope of work: kitchen and bathroom (4) renovation, replace all flooring, tiling, millwork, plumbing, appliances, and install new feature ceiling design. Replace and install new energy lighting throughout suite. Exterior and storage to remain unchanged. Okay for Field Review by Kim Vogt. E2 - Lighting - Install lighting dimmer, timers, and/or motion detectors on interior lights. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant's responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Dwelling Unit
$500,000
Jun 15, 2022
BP-2022-01985
Field Review - Addition / Alteration - #2102 - To permit interior alterations to this existing Unit #2102 in this Multiple Dwelling Building on this Site. Scope to Include: Updating bathrooms with new fixtures, millwork and tile. Updating kitchen with new appliances, fixtures, and millwork. New flooring and paint throughout. Installing new soundproofing membrane and floor tiles. OK For Field Review per A.Campbell & A.Wroblewski - Oct.20.2020 Energy Upgrade: L2 - Lighting - Install lighting dimmer, timers, and/or motion detectors on interior lights DBI to determine if structural engineer required for removal of walls\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t
Multiple Dwelling
$190,000
Nov 10, 2020
BP-2020-03253
Field Review - Addition / Alteration - #1802 - Interior alterations to renovate the existing dwelling unit, #1802 on the 18th floor in this existing Multiple Dwelling building (Kings Landing, West Tower). Scope of work includes: Remove interior doors, flooring, tiles, millwork, plumbing fixtures, countertops, crown moulding and wall trim throughout. Remove fireplace, non structural wall in bedroom and a non structural wall in kitchen for open concept. Relocate Electrical panel. New gas fireplace and new partitions. Install new flooring, doors, pocket doors, custom millwork, plumbing fixtures, appliances, LED pot lights and paint throughout. OK for field review as per Howie Chow, June 25, 2020. Notes: ~ Energy Upgrade: L2 - Lighting - Install energy efficient lighting fixtures (single occupied space area) ~ Building Sprinklered – Sprinkler permit is required. ~ Assurance letter "wall removed are non structural" submitted by Dan Kunimoto, P.Eng. FEC of Kunimoto Engineering (1995) Limited, Tel: 604 298-5950.
Multiple Dwelling
$250,000
Aug 17, 2020
BP-2020-01956
Field Review - Addition / Alteration - #2705 - Interior alterations to this existing unit #2705 in this existing multiple dwelling building on this site. Scope of Work: Relocating door to existing bulk storage. Removing the gas fireplace and installing an electric fireplace. Updates to the flooring, tile and mill-work. Installing new energy efficient lighting throughout suite. Remove and replace all existing plumbing fixtures and appliances. OK For Field Review per A.Campbell - Jan.15.2020 Note: 1. Building is sprinklered - DBI to determine if separate sprinkler permit is required. 2. DBI to determine if structural engineer is require for removal of walls 3. Energy Upgrade: L2 - Lighting - Install energy efficient lighting fixtures (single occupied space area)
Multiple Dwelling
$250,000
Apr 17, 2020
BP-2020-00154
Field Review - Addition / Alteration - #1502 Interior alterations to residential unit improvement to unit #1502 on the 15th floor of this existing multiple dwelling building on this site. Scope of work includes : remove partition walls and doors, new partition walls and doors, washrooms and kitchen update, relocate storage, and electrical, sprinkler, and plumbing work. Note: Enclosed balcony to be retained. Flooring to remain impervious and doors to the enclosed balcony to maximize glass area to admit natural light to the interior space beyond. OK for field review as per C.Yue on Apr 10/19 Selected Energy Upgrade: L2 - Lighting - Install lighting dimmer, timers, and/or motion detectors on interior lights
Multiple Dwelling
$500,000
Jul 4, 2019
BP-2019-01502
Field Review - Addition / Alteration - #1703 Interior alterations to provide renovations to suite #1703 on the 17th floor for the kitchen, bathrooms & bedrooms area. Scope of work includes the removal of non-load bearing partitions, the changes of layout and ceiling layouts. OK for field review as per Howie Chow, January 8, 2018. Note: 1. Structural Schedule B may be required by district Building Inspector to be determined on site. 2. Energy upgrade: L2- Lighting - install lighting dimmer, timers and/or motion detectors on interior lights
Multiple Dwelling
$250,000
Apr 18, 2018
BP-2018-00081
Field Review - Addition / Alteration - (#1501-15th flr) Interior alterations to renovate this dwelling unit of this existing multiple dwelling building. Scope of work includes renovate kitchen and master en-suite, including create new opening in non-loadbearing wall between kitchen and den, changes to closets, new lighting, finishes throughout. OK for field review per W.Wong, June 19, 2017. Selected energy upgrade: L2 - Lighting - Install energy efficient lighting fixtures (single occupied space area) Rev. #1: - interior alteration to have new doors, new flooring, new sink, new tub. - change applicant name to owner.
Multiple Dwelling
$30,000
Jul 13, 2017
BP-2017-03259